All NHAI Projects
119DEPC

Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga.

UPC: N/05005/08006/BR

Physical Progress

0.8%

Drone-monitored

Financial Progress

0.0%

Of awarded cost

Awarded Cost

₹433 Cr

Contract value

Length

14.5 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

N/A

Aerial captures

Project Progress

Physical Progress0.8%
Financial Progress0.0%

Stage

Under Construction (AD issued)

Due Date

23-04-2028

Likely Date

23-04-2028

Completion

0.8%

Physical Done

DoneRemaining

Project Timeline

Awarded

24-04-2026

Construction Started

24-04-2026

In Progress

Near Completion

-

Completed

23-04-2028

Physical vs Financial Progress

Project Details

UPC

N/05005/08006/BR

National Highway

119D

Regional Office

RO-Patna

State

Bihar

Mode

EPC

Length

14.5 km

Contractor

SGIHPL -RCPL (JV)

Project Stage

Under Construction (AD issued)

Drone Frames

N/A

Last Flight

N/A

Cost & Timeline

Awarded Cost

₹433.31 Cr

Capital Cost

₹1113.46 Cr

Start Date

24-04-2026

PCOD Date

-

Scheduled Completion

23-04-2028

Likely Completion

23-04-2028

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-09-20 21:44:33

Contractor Profile

SGIHPL -RCPL (JV)

RO-Patna119DEPC

Project Intelligence

1

Physical progress stands at 0.8%. Financial utilization at 0.0%.

2

Project is on schedule or ahead of planned completion date.

3

Covers 14.5 km on 119D, improving regional connectivity.

Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga. is a National Highways Authority of India (NHAI) project on 119D in Bihar. The project has an awarded cost of ₹433.31 Cr and is currently ongoing with physical progress at 0.8%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

?

Frequently Asked Questions

QWhat is the current status of the NHAI project "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119"?
Current physical progress: 0.8%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 23-04-2028. Likely completion: 23-04-2028.
QWho is the contractor for this NHAI highway project?
The contractor for Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga. is SGIHPL -RCPL (JV). The project is under RO-Patna and covers 14.5 km on 119D.
QWhat is the cost of this NHAI highway project?
The awarded cost is ₹433.31 Crore. Total capital cost: ₹1113.46 Crore. The project is on 119D in Bihar, monitored via drone surveillance by NHAI.
QWhat is UPC N/05005/08006/BR in NHAI?
UPC (Unique Project Code) N/05005/08006/BR refers to "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga." — a National Highway project on 119D in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.