Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga.
Physical Progress
0.8%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹433 Cr
Contract value
Length
14.5 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under Construction (AD issued)
Due Date
23-04-2028
Likely Date
23-04-2028
Completion
0.8%
Physical Done
Project Timeline
Awarded
24-04-2026
Construction Started
24-04-2026
In Progress
Near Completion
-
Completed
23-04-2028
Physical vs Financial Progress
Project Details
UPC
N/05005/08006/BR
National Highway
119D
Regional Office
RO-Patna
State
Bihar
Mode
EPC
Length
14.5 km
Contractor
SGIHPL -RCPL (JV)
Project Stage
Under Construction (AD issued)
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹433.31 Cr
Capital Cost
₹1113.46 Cr
Start Date
24-04-2026
PCOD Date
-
Scheduled Completion
23-04-2028
Likely Completion
23-04-2028
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:44:33
Contractor Profile
SGIHPL -RCPL (JV)
Project Intelligence
Physical progress stands at 0.8%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 14.5 km on 119D, improving regional connectivity.
Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga. is a National Highways Authority of India (NHAI) project on 119D in Bihar. The project has an awarded cost of ₹433.31 Cr and is currently ongoing with physical progress at 0.8%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119"?
- Current physical progress: 0.8%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 23-04-2028. Likely completion: 23-04-2028.
- QWho is the contractor for this NHAI highway project?
- The contractor for Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga. is SGIHPL -RCPL (JV). The project is under RO-Patna and covers 14.5 km on 119D.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹433.31 Crore. Total capital cost: ₹1113.46 Crore. The project is on 119D in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/05005/08006/BR in NHAI?
- UPC (Unique Project Code) N/05005/08006/BR refers to "Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km 196+700 to Km 198+600), as part of the Amas-Darbhanga." — a National Highway project on 119D in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.