Transmission & DistributionIPM · Central Project#611659

Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan[8.1 GW] under phase-II- Part E

Ministry of PowerRajasthan
Revised Cost: ₹1433 CrUtilization: 99.0%

Original Cost

₹1433 Cr

Baseline estimate

On budget

Revised Cost

₹1433 Cr

Latest approved cost

Expenditure

₹1419 Cr

Spent to date

Utilization

99.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹14 Cr

Budget left

Budget Utilization

99.0%
0%25%50%75%100%

Spent

₹1419 Cr

Remaining

₹14 Cr

Total

₹1433 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

30/09/2024

Revised Completion

31/12/2025

Completed

Project Details

Project Code611659
SectorTransmission & Distribution
MinistryMinistry of Power
StateRajasthan
Data Month2025-11

Financial Summary

Original Cost₹1433 Cr
Revised Cost₹1433 Cr
Expenditure₹1419 Cr
Original End Date30/09/2024
Revised Date31/12/2025

Project Intelligence

Project is within original budget of ₹1433 Cr — no cost escalation recorded.

Expenditure stands at ₹1419 Cr, which is 99.0% of the revised project cost.

Remaining budget: ₹14 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan[8.1 GW] under phase-II- Part E is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹1433.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission system strengthening scheme for evacuation of power from solar ener"?
Transmission system strengthening scheme for evacuation of power from solar energy zones in Rajasthan[8.1 GW] under phase-II- Part E is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Rajasthan. Original cost: ₹1433 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1433 Cr has not been significantly revised. Expenditure: ₹1419 Cr (99.0% of cost). Data as of 2025-11.
QWhich ministry is responsible for this project?
Transmission system strengthening scheme for evacuation of p is under the Ministry of Power in the Transmission & Distribution sector. Project code: 611659. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission system strengthening scheme for evacuation of p is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.