Transmission & DistributionIPM · Central Project#615337

Additional Transmission System for evacuation of Power from Bhadla-III PS as part of Rajasthan REZ Phase III Scheme [20 GW] [SPV Name POWERGRID Bhadla-III Power Transmission Limited]

Ministry of PowerRajasthan
Revised Cost: ₹369 CrUtilization: 82.0%

Original Cost

₹369 Cr

Baseline estimate

On budget

Revised Cost

₹369 Cr

Latest approved cost

Expenditure

₹303 Cr

Spent to date

Utilization

82.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹66 Cr

Budget left

Budget Utilization

82.0%
0%25%50%75%100%

Spent

₹303 Cr

Remaining

₹66 Cr

Total

₹369 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

27/02/2026

Revised Completion

30/09/2026

Completed

Project Details

Project Code615337
SectorTransmission & Distribution
MinistryMinistry of Power
StateRajasthan
Data Month2026-08

Financial Summary

Original Cost₹369 Cr
Revised Cost₹369 Cr
Expenditure₹303 Cr
Original End Date27/02/2026
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹369 Cr — no cost escalation recorded.

Expenditure stands at ₹303 Cr, which is 82.0% of the revised project cost.

Remaining budget: ₹66 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Additional Transmission System for evacuation of Power from Bhadla-III PS as part of Rajasthan REZ Phase III Scheme [20 GW] [SPV Name POWERGRID Bhadla-III Power Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹369.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Additional Transmission System for evacuation of Power from Bhadla-III PS as par"?
Additional Transmission System for evacuation of Power from Bhadla-III PS as part of Rajasthan REZ Phase III Scheme [20 GW] [SPV Name POWERGRID Bhadla-III Power Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Rajasthan. Original cost: ₹369 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹369 Cr has not been significantly revised. Expenditure: ₹303 Cr (82.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Additional Transmission System for evacuation of Power from is under the Ministry of Power in the Transmission & Distribution sector. Project code: 615337. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Additional Transmission System for evacuation of Power from is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.