Transmission & DistributionIPM · Central Project#617269

Transmission System for Strengthening to facilitate evacuation of power from Bhadla/Bikaner Complex

Ministry of PowerUttar Pradesh
Revised Cost: ₹213 CrUtilization: 10.0%

Original Cost

₹213 Cr

Baseline estimate

On budget

Revised Cost

₹213 Cr

Latest approved cost

Expenditure

₹21 Cr

Spent to date

Utilization

10.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹192 Cr

Budget left

Budget Utilization

10.0%
0%25%50%75%100%

Spent

₹21 Cr

Remaining

₹192 Cr

Total

₹213 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/06/2026

Revised Completion

31/12/2026

Completed

Project Details

Project Code617269
SectorTransmission & Distribution
MinistryMinistry of Power
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹213 Cr
Revised Cost₹213 Cr
Expenditure₹21 Cr
Original End Date09/06/2026
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹213 Cr — no cost escalation recorded.

Expenditure stands at ₹21 Cr, which is 10.0% of the revised project cost.

Remaining budget: ₹192 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission System for Strengthening to facilitate evacuation of power from Bhadla/Bikaner Complex is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹213.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission System for Strengthening to facilitate evacuation of power from Bha"?
Transmission System for Strengthening to facilitate evacuation of power from Bhadla/Bikaner Complex is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Uttar Pradesh. Original cost: ₹213 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹213 Cr has not been significantly revised. Expenditure: ₹21 Cr (10.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Transmission System for Strengthening to facilitate evacuati is under the Ministry of Power in the Transmission & Distribution sector. Project code: 617269. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for Strengthening to facilitate evacuati is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.