Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part B
Original Cost
₹1168 Cr
Baseline estimate
Revised Cost
₹1167 Cr
Latest approved cost
Expenditure
₹1148 Cr
Spent to date
Utilization
98.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹19 Cr
Budget left
Budget Utilization
98.3%Spent
₹1148 Cr
Remaining
₹19 Cr
Total
₹1167 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2025
Revised Completion
30/11/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1168 Cr — no cost escalation recorded.
Expenditure stands at ₹1148 Cr, which is 98.3% of the revised project cost.
Remaining budget: ₹19 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part B is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹1168.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phas"?
- Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part B is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹1168 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1168 Cr and has been revised to ₹1167 Cr — a cost overrun of -0.1%. Expenditure to date: ₹1148 Cr (98.3% of revised cost). Data as of 2025-10.
- QWhich ministry is responsible for this project?
- Transmission scheme for evacuation of 4.5GW RE injection at is under the Ministry of Power in the Transmission & Distribution sector. Project code: 611656. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission scheme for evacuation of 4.5GW RE injection at is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.