Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Systems [CSST&DS] in Arunachal Pradesh and Sikkim
Original Cost
₹4754 Cr
Baseline estimate
Revised Cost
₹9129 Cr
Latest approved cost
Expenditure
₹8173 Cr
Spent to date
Utilization
89.5%
Of revised budget
Cost Status
+92.0%
+₹4375 Cr increase
Remaining
₹956 Cr
Budget left
Budget Utilization
89.5%Spent
₹8173 Cr
Remaining
₹956 Cr
Total
₹9129 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹4754 Cr
Revised Cost
₹9129 Cr
Increase
+₹4375 Cr
Escalation
+92.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
19/12/2018
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹4375 Cr (92.0%) from the original estimate of ₹4754 Cr.
Expenditure stands at ₹8173 Cr, which is 89.5% of the revised project cost.
Remaining budget: ₹956 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Systems [CSST&DS] in Arunachal Pradesh and Sikkim is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹4754.00 Cr, later revised to ₹9129.32 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Sy"?
- Comprehensive Scheme for Strengthening of Transmission and Distribution [T&D] Systems [CSST&DS] in Arunachal Pradesh and Sikkim is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Sikkim. Original cost: ₹4754 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹4754 Cr and has been revised to ₹9129 Cr — a cost overrun of +92%. Expenditure to date: ₹8173 Cr (89.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Comprehensive Scheme for Strengthening of Transmission and D is under the Ministry of Power in the Transmission & Distribution sector. Project code: 602223. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Comprehensive Scheme for Strengthening of Transmission and D is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.