Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 55 of 82
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 3A (Fuliabasar), 3B (Tengariya), 3C (Mohaliya Waran), 8 (Buttudih), 11&12 (Dosimani), 10&11 (Siradih), Panchayat- Lakrama, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 6A (Buniyatari), 6B (Barakola), 3A(raktrohini), 2A(jalniya), 14A(jhilsi), 15A(dumariya) Panchayat-kolhasar Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1C(modikura), 7B(surangi Niche Tola), 8B(dafedar Tola), 8C(gurmi Mahto Tola),8d(dahgilwa),9a(baraduri), Panchayat- Kusumjori, Block- Chandan (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 7C(agwani), 3D(harijan Tola), 1A(bherogan Bazar Thanan Tola), 1B(panchayat Bhawan Tola), 2C(alkdumar) of Panchayat- South Warne, Block- Chandan (05 No Scheme) for Year 2023-24
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 9B(sotari), 9C(dudhidura), 9D(katharakura), 10C( Bihari Matho Tola), 11B(chokdardih) ,11C(pujhar Tola), Panchayat- Kusumjori, Block- Chandan (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka,ward No- 9B (Mohandih), 6D (Targawan), 6C (Satighat), 6B (Chanwari), 6A (Mushharadih), 9A (Tilwariya), Panchayat- Chandwari, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Fulhara Das Tola), 1B (Fulhara S.C Tola), 3A (Karmatand), 3B (Khagusan S.C Tola), 4A (Mahuatand), 5A (Bagro Uper Tola), Panchayat- West Katsakra), Block-chandan, ( 6 Nos Scheme), for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Naiyadih), 1B (Bhagwa Uper Tola), 1C (Bhagwa Nich Tola Adiwasi), 2A (Chamardiha Harijan Tola), 4A (Dhudhua Adiwasi Tola), 9A (Simriya), Panchayat- Gouripur, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 12 (Suiya), 2 (Duwarsar Niche Tola), 2B (Karwapathar), 11A (Bora Suiya), 1A (Harikura Upper Tola), 1B (Kowahdah Nayasi Tola), Panchayat- Bora Suiya, Block-chandan, (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka,11a(murliwaran Tleiyakhar), 12A(dhawa SC Tola, 7A(bhelwatari),8a (Shishama Damgi), 14(Mayurnachan), 12A(dhawa) Panchayat- Fullidumar, Block-fullidumar (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No-10a(dhawawaran),13a(kruwa, Rajdah Niyasi),16a(dakawa),shalaiya,9a(dhwa Waran) Panchyat-fulldimar, of Block-fullidumar (05 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka, Ward No- 2B (Tilakpur Harijan Tola), 12B( Jilebiyamod), 10B (Mahesa), 4B (Baniya Tola), 4C (Baniya Tola) for 5 Number of Scheme.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar, Ward No- 6A (Adiwasi Tola), 6B (Badla Turi Tola), 6C (Badla Near School), 6D (Sugado), 5A (Jhikuliya), 7A (Madhua,jamua) (For 6Number of Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar Ward No.- 5A (Dubraj), 5B (Ledhma), 3A (Nimatand(harikura)), 1B (Manjra Tola), 4B (Kaithatikar (Sangram Tola)), 18A (Ghutiya) (For 05 Number of Scheme.)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Choubatiya Palyar Tola), 1B (Surakol), 3A (Purani Bhoura), 3B (Anandnagar), 3C (Thuthikushum), Panchayat- Chatrapal, Block-banka (05 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Kaduabari), 1B (Jharna), 1C (Bhormbari), 2B (Sabarbari), 4A (Tarapaghar), 8A (Baghitari Gunakol), Panchayat- Samukhiya, Block-banka (06 No Scheme) for Year 2023-24
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No-2a(khujruya), 2B(kharwara),6a(kolhariya),6b(bhalua), 6C(nawadih), 6D(baratari), Panchayat- Dewasi, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No-3a(dhawa), 7A(thakurbari),4a(sekhpura Kuswaha Tola), 5A(chhabela), 5B(teliya Maran & Chhabelatand Per),6a(south Bhelgero) Panchayat- Birniya, Block- Chandan (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 14 (Pardih), 2A (Amgachhi), 2B (Belhariya), 1A (Shalaiya Bari), 1B (Rojhabaran), 3A (Chandan), Panchayat- Chandan, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 11A (Birenchi Ray Tola), 12A (Suiya), 1A (Tetriya Adiwasi Tola), 5A (Amtua), 8A (Beharbari Uper Tola), 8B (Beharbari Nich Tola), Panchayat- Barfera Tetriya), Block- Chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Gechhali), 3A (Danochhi Nich Tola), 2B (Oraiya), 8A (Barakol), 8B (Manjhaladih), 2C (Lalchand Tola), Panchayat- East Katsakra, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Domuhan Nich Tola), 1B (Domuhan), 4 (Mathura Aadiwasi Tola), 7B (Dharhara Yadav Tola), 1C (Chandipirha) , Panchayat- North Warne,block-chandan (5 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Payjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2C (Kairajor), 10B (Modipur Adiwasi Tola), 11C (Kumaratari), 6C (East Lalpur Upper Tola), 10C (Modikura), 7 (Dharhara), Panchayat- North Warne, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1B (Hardiya Pujhar Tola), 3A (Ranijharna),3b (Dehwarapujhar Tola), 3C(buldeldih), 4A (Pilwa Pujhar Tola), 4B (Jhagraha), Panchayat- Ashudha, Block-chandan, ( 6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No-14e(balmuha), 14F(ranganiya), 14G(birnadih, 16A(gobardhah), 14A(nadapahar) of Panchyat-bhitiya, of Block-fullidumar (05 No Scheme)
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period).BLOCK-TANKUPPA, GP-BHETORA WARD-10, GP-GAJADHARPUR WARD-3, GP-BHETORA 13B
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-TANKUPPA, GP-JAGARNATHPUR WARD-, 9,10 & GP-TANKUPPA WARD-6
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-TANKUPPA, GP-UTLIBARA, WARD NO-8 & GP-CHOUBAR WARD NO-4,1Dhibar ward-10
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-MOHDA, GP-JETHIYAN, WARD-, 4 GP- NORTH KAJOOR, WARD-4, SOUTH KAJOOR WARD-10
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-MOHDA, GP-GEHLOR, WARD-, 10,12 GP- SARSU WARD-8
- ExpiredNAME OF WORK:-EESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-MOHDA, GP-ARAI-8, TETAR WARD-5,7
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kharati , Ward No. :- 04, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Patti , Ward No. :- 07, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-WAZIRGANJ, GP-DAKHINGAON, WARD-4,7,9,13,14
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kharati , Ward No. :- 08, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-WAZIRGANJ, GP-TARMA, WARD-, 1,15, GP-MAHUYET WARD-11,GP-SAKARDAS NAWDA WARD-6B , 9
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Nadarpur , Ward No. :- 5, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-Konch, Gp-Manjhiyama ward-7 Gp- Ker ward-6
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period).BLOCK- Tikari- Gp- Rupaspur ward-6, GP- Mau, ward-13
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Bajoura , Ward No. :- 8, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Bajoura , Ward No. :- 12, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Bajoura , Ward No. :- 14, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-PARAIYA , GP-PARAIYA KHURD, WARD-, 16, GP- KARHATTA WARD-12A, GP- BAGAHI WARD-5, GP-MANJHIYAMA WARD-5
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kushavija , Ward No. :- 06, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kushavija , Ward No. :- 08, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Neema , Ward No. :- 03, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Neema , Ward No. :- 03A, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-Pariya, Gp-Solra ward-9,5,6
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Angra , Ward No. :- 01, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Angra , Ward No. :- 02, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-NAGAR, GP- CHAKAND WARD-6, GP- NAILI WARD-6
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Angra , Ward No. :- 04, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Angra , Ward No. :- 05, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-NAGAR, GP- DHANSIR WARD-11, GP- RASALPUR WARD-11,2, GP-KHIRIYAMA WARD-3, GP-KORMA WARD-8
- ExpiredNAME OF WORK:-ESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-Khizersarai GP-Horma ward-9, GP- Hathiyama ward-13 , GP-Hemara ward-10
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Nagwa , Ward No. :-12,Block :- Gurua of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Nagwa , Ward No. :-11 ,Block :- Gurua of Gaya District Under P.h.division, Sherghati.
- ExpiredMAJOR REPAIRING WORK REQUIRED FOR CONTINUOUS FUNCTIONING OF WATER SUPPLY TAKEN OVER FROM PRD WITH SIX MONTHS DEFECT AND LIABILITY PERIOD IN PANCHAYAT :- NAGWA , WARD NO. :-01(part 1) ,BLOCK :- GURUA OF GAYA DISTRICT UNDER P.H.DIVISION, SHERGHATI.
- ExpiredMAJOR REPAIRING WORK REQUIRED FOR CONTINUOUS FUNCTIONING OF WATER SUPPLY TAKEN OVER FROM PRD WITH SIX MONTHS DEFECT AND LIABILITY PERIOD IN PANCHAYAT :- BELAUTI(belauti) , WARD NO. :-9 ,BLOCK :- GURUA OF GAYA DISTRICT UNDER P.H.DIVISION, SHERGHATI.
- ExpiredMAJOR REPAIRING WORK REQUIRED FOR CONTINUOUS FUNCTIONING OF WATER SUPPLY TAKEN OVER FROM PRD WITH SIX MONTHS DEFECT AND LIABILITY PERIOD IN PANCHAYAT :- KAZ(jagganathpur) , WARD NO. :- 10 ,BLOCK :- GURUA OF GAYA DISTRICT UNDER P.H.DIVISION, SHERGHATI.