Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 51 of 82
- ExpiredConstruction of New Sinking High yield Tube Well for PRD Schemes Where Existing boring Failed and Repairing Works Under "Har Ghar Nal ka Jal" Nischay Yojna in Block-Kako, Panchayat-Pinjora Village-Kanak Bigha, Ward- 5 for the Year-2024-25 under P.H Division, Jehanabad.(With 6 month defect and lability Period)
- ExpiredConstruction of New Sinking High yield Tube Well for PRD Schemes Where Existing boring Failed and Repairing Works Under "Har Ghar Nal ka Jal" Nischay Yojna in Block-Kako, Panchayat-Maniyawa, Village-Loha Bigha, Ward- 04 for the Year-2024-25 under P.H Division, Jehanabad.(with six Month defect and Liabilty Period)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -01 & 02 of Neknam Tola Panchayat under Block-Barhara in the district Bhojpur. GR-02
- ExpiredConstruction of 125mmx 45 mtr deep gravel packed T/W(G.P.T)with I.M-II Hand Pump, platform & drain in place of old/defunct handpumpsWith Soak Pit 1.0M diameter 2.0 Meter deep with dry brick honey comp shaft with brick of class designaion 100B for Handpumps. Under P.H. Division, Gaya for the year 2024-25 in district Gaya. (I) Construction of 125mmx 45 mtr deep gravel packed T/W(G.P.T)with I.M-II Hand Pump, platform & drain in place of old/defunct handpumps - 30 Nos. (ii)Construction of Soak Pit 1.0M diameter 2.0 meter deep with dry brick honey comb shaft with bricks of Class designation 100B for Handpumps -30 nos.
- ExpiredConstruction of new deep hand-pumps ( India Mark-II), Machine Drilled Boring, Soak-pit 1.00m dia & 2.00m deep with dry brick honey-comb shaft with bricks (100B) of class designation and 3 meter long P.C.C. Drain for providing drinking water in water scarce area & drought area at different places in Gaya District under P.H. Division Gaya. (Year :? 2024-25.) (i)Construction of 125mm/115mm x 60m deep drilled T/W(D.T) with I.M-II Hand Pump, platform & drain in place of old/defunct handpumps under P.H. Division, Gaya for the year 2024-25 in district Gaya -33 Nos (ii)Construction of 125mmx 45 mtr deep gravel packed T/W(G.P.T)with I.M-II Hand Pump, platform & drain in place of old/defunct handpumps Under P.H. Division, Gaya for the year 2024-25 in district Gaya .53 Nos (iii)Construction of Soak Pit 1.0M diameter 2.0 meter deep with dry brick honey comb shaft with bricks of Class designation 100B for Handpumps-86 Nos.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron (Strike off irrelevant impurity) Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In Charaiya, Chopra, Sadipur Bhutha Panchyat of Baisi Block (Total-8 Nos. Schemes) in the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Purnea.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron (Strike off irrelevant impurity) Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In Bangama Panchyat of Baisi Block (Total-7 Nos. Schemes) in the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Purnea.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron (Strike off irrelevant impurity) Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In Bhogakariyat, Rampur Panchyat of Purnea East Block (Total-7 Nos. Schemes) in the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Purnea.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Iron (Strike off irrelevant impurity) Removal Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/etc.) certified by CSIR or any other institute of national repute. In Chanka Panchyat of Srinagar Block (Total-7 Nos. Schemes) in the District of Purnea Bihar on turn-key basis with 06 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Purnea.
- ExpiredMAJOR REPAIRING WORKS FOR FUNCTIONALITY OF "HAR GHAR NAL KA JAL" SCHEME TAKEN OVER FROM PRD UNDER P.H.DIVISION LAKHISARAI (Gr. NO- 01)
- ExpiredDesign, Construction, Supply, Testing and commissioning of piped Water Supply Schemes for habitations left out under "Har Ghar Nal Ka Jal" Nischay in areas having ground water quality issues; with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in Pathrabari of Jokihat Block. (Total-04 Nos. Schemes) in the District of Araria , Bihar on Turn-Key basis with 3 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Gramin Peyjal Nishchay Yojna (Quality Affected) under P.H.Division, Araria.
- ExpiredEstimate for Bill of Quantity :-Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 16B (Sifliya Ramji Tola), 13B (Kudalkhut), 2A (Dudhijor), 2B (Teriya), Panchayat- Bhorsar Bhelwa, Block- Katoria (04 No Scheme) for Year 2023-24.(Gr No-01)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar Ward No.- 5A (Dubraj), 5B (Ledhma), 3A (Nimatand(harikura)), 1B (Manjra Tola), 4B (Kaithatikar (Sangram Tola)), 18A (Ghutiya) (For 05 Number of Scheme.)
- ExpiredMAJOR REPAIRING WORK REQUIRED FOR CONTINUOUS FUNCTIONING OF WATER SUPPLY TAKEN OVER FROM PRD WITH SIX MONTHS DEFECT AND LIABILITY PERIOD IN PANCHAYAT :- GURUA(takiya) , WARD NO. :-1 ,BLOCK :- GURUA OF GAYA DISTRICT UNDER P.H.DIVISION, SHERGHATI.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Ghoraghat , Ward No. :- 09, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Patti , Ward No. :- 08, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Patti , Ward No. :- 13, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kharati , Ward No. :- 10, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Kharati , Ward No. :- 12, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Nadarpur , Ward No. :- 1, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Bari , Ward No. :- 05, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Bari , Ward No. :- 13, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Ghoraghat , Ward No. :- 04, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Pacharatan , Ward No. :- 15, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Defect & Liability Period of 6 Months in Panchayat :- Angra , Ward No. :- 06, Block :- Dobhi of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Barma , Ward No. :-8 ,Block :- Gurua of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :-Raghunathkhap , Ward No. :-9 ,Block :- Gurua of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Month Defect& Liability Period in Panchayat :- Malpa , Ward No. :- 11 ,Block :- Guraru of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Barorah , Ward No. :03 ,Block :- Guraru of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Dabur , Ward No. :01 ,Block :- Guraru of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Dabur , Ward No. :01 ,Block :- Guraru of Gaya District Under P.h.division, Sherghati.
- ExpiredMajor Repairing Work Required for Continuous Functioning of Water Supply Taken Over from Prd with Six Months Defect and Liability Period in Panchayat :- Ghatera , Ward No. :- 11 ,Block :- Guraru of Gaya District Under P.h.division, Sherghati.
- ExpiredCONSTRUCTION OF 43 Nos. of 150mm x100mmx125m deep NEW HIGH YIELD T/W WITH CHAMBER IN PLACE OF FAILED TUBEWELL FOR SCHEME TAKEN OVER BY PRD UNDER P.H.DIVISION BUXAR.
- ExpiredMINOR REPAIRING OF MOTOR AND STARTER AND PROVISION OF NEW MOTOR OF PRD's WARD LEVEL "HAR GHAR NAL JAL" SCHEMES THAT HAS BEEN TAKEN OVER BY PHED, UNDER P.H. DIVISION, CHAPRA.(WORK UNDER P.H.SUB DIVISION, SONPUR)
- ExpiredMINOR REPAIRING OF MOTOR AND STARTER AND PROVISION OF NEW MOTOR OF PRD's WARD LEVEL "HAR GHAR NAL JAL" SCHEMES THAT HAS BEEN TAKEN OVER BY PHED, UNDER P.H. DIVISION, CHAPRA.(WORK UNDER P.H.SUB DIVISION, BANIYAPUR)
- ExpiredMINOR REPAIRING OF MOTOR AND STARTER AND PROVISION OF NEW MOTOR OF PRD's WARD LEVEL "HAR GHAR NAL JAL" SCHEMES THAT HAS BEEN TAKEN OVER BY PHED, UNDER P.H. DIVISION, CHAPRA.(WORK UNDER P.H.SUB DIVISION, MASHRAKH)
- ExpiredMINOR REPAIRING OF MOTOR AND STARTER AND PROVISION OF NEW MOTOR OF PRD's WARD LEVEL "HAR GHAR NAL JAL" SCHEMES THAT HAS BEEN TAKEN OVER BY PHED, UNDER P.H. DIVISION, CHAPRA.(WORK UNDER P.H.SUB DIVISION, CHAPRA)
- ExpiredMAJOR REPAIRING OF PRD WATER SUPPLY SCHEMES TO MAKE IT FUNCTIONAL OF BLOCK NATHNAGAR IN THE DISTRICT BHAGALPUR UNDER P.H DIVISION,BHAGALPUR WEST FOR THE YEAR 2023-24 BLOCK- NATHANGAR, PANCHAYAT- BELKHORIYA, WARD-11 BLOCK-NATHNAGAR, PANCHAYAT-NISFAMBE, WARD NO.-07 BLOCK- NATHNAGAR, PANCHAYAT- RAMPUR KHURD, WARD-07 (Group-02)
- ExpiredMAJOR REPAIRING OF PRD WATER SUPPLY SCHEMES TO MAKE IT FUNCTIONAL OF BLOCK NATHNAGAR IN THE DISTRICT BHAGALPUR UNDER P.H DIVISION,BHAGALPUR WEST FOR THE YEAR 2023-24 BLOCK- NATHANGAR, PANCHAYAT- NISFAMBEY, WARD-14 & 3B BLOCK- NATHNAGAR, PANCHAYAT- GOURACHOUKI, WARD-9B (Group-01)
- ExpiredA- Construction of 200/150 mm dia. 125 Mtr deep Drilled High Yield Tubewell By DTH RIG Machine with Blue casing U.P.V.C. Pipe etc. all complete and as per direction of E/I.- 04 Nos B-Construction of 150mm x 125 mm x 125 M deep With MS Casing T/W etc. all complete and as per direction of E/I. ? 02 Nos C-Constructing masonry Chamber 100x100x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for Tube Well, complete as per standard specifications & direction of E/I.- 06 Nos D-REPAIRING OF EXISTING DISTRIBUTION SYSTEM-Nos-06 E-Cost of Submersible Pump Set of KSB make having discharging 2.65 LPS at a total head of 35 M with suitable size of MSERW column pipe coupled with 2 H.P. submersible Motor 2900 RPM single phase and all necessary electrical and mechanical accessories etc. all complete set.-03 Nos
- ExpiredSinking of I.M.-II Handpump with Platform, Drain & Soakpit due to heat stroke & decreasing of water level in Water Scarce area under P.H. Division, Sherghati for the Year 2024-25 under Natural Disaster (Drought) Head.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Pipe Water Supply Schemes with Electric Driven Pumps and IRON Removal Treatment Plant having Technology (Adsorption/ Nano Technology) of CSIR or certified by CSIR or any other Technology endorsed/ approved by GoI in the IRON affected Left Out Habitations/ Wards of District of Purnea on turn-key basis with 06 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn Key basis in ward/scheme no. 3B,6B,10B of Vijay Lalganj panchayat, ward/scheme no. 2B of Bhowa Parwal panchayat, ward/scheme no. 1B,9B of Singhpur Diyara panchayat and ward/scheme no. 11B of Vijay Mohanpur panchayat in Rupauli block under P.H.Division, Dhamdaha.
- ExpiredESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK- Atri, GP- Narawat ward-3, Gp- Jiri ward-2,3, Gp- Sirh, ward-5,9,12
- ExpiredESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-ATRI, GP- SAHORA, WARD-6,13 GP- DIHURI GP-6,12
- ExpiredEESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-NEEMCHAK BATHNAI GP- SAREN, WARD-3A,3B,9
- ExpiredESTIMATE FOR MAJOR REPAIR OF NON FUNCTIONAL PRD SCHEME WHICH HAS BEEN TAKEN OVER BY PHED Under P.H. Division,GAYA for the year 2024-25 . (With 6 month defect and lability Period). BLOCK-PARAIYA, GP-SOLRA WARD-12,14, GP- PUNAKALA WARD-13,14
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, BLOCK- KOELWAR PANCHAYAT- BIRAMPUR (WARD NO-02,01,16,08). (GR-01)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having no ground water quality issues; with Electric Driven Pumps in the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) Under P.H. Division, Ara, (BLOCK:- Charpokhri, PANCHAYAT- Mukundpur ward NO-7,8,10,11,14 Pasour WARD-2, Malour WARD-4,11 Nagri-9) in the district Bhojpur. (GR-01)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -03,10,09 of Jamira Panchayat, ward -02 of Hasanpura Panchayatand,ward -06 & 10 of Khjuriya Panchayat and Ward-05 of Karari Panchayat under Block-Ara in the district Bhojpur. (GR-01)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division,ward -3, 4, 8, 10, 14 of Bharauli Panchayat and Ward-7, 14 of Ishwarpura Panchayat and Ward- 8 of Sarna Panchayat under Block-Shahpur in the district Bhojpur. (GR-06)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara,ward - 02, 04, 08, 11, 12 of Khutaha Panchayat and Ward-10, 13 & 14 of Bahoranpur and Ward-08 of Hariharpur Panchayat under Block-Shahpur in the district Bhojpur.(GR -05)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -06,13,10,12 of Kayamnagar Panchayat and Ward-06,07,11 of Mathurapur Panchayat under Block-Koelwar in the district Bhojpur. (GR-03)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -05 & 10 of Saraiya Panchayat, ward -04,05&12 of Farna Panchayat and Ward-02 & 11 of West Gundi Panchayat under Block-Barhara in the district Bhojpur. (GR-02)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -2A,2B,11 & 13 of Mahuli Panchayat and Ward-05,11 &14 of Sundarpurbarja Panchayat under Block-Ara in the district Bhojpur. (GR-01)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas for Panchayat Rustampur-ward-(1B-Yadav Tola ,1C-Yadav Tola,2A-Mahadalit Tola,2B-Mahadalit Tola,3-Chai Tola,5-Rajput Tola,8-Mahadalit Tola,11-Yadav Tola,14-Mahadalit Tola) under Block Raghopur having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected)in Vaishali District under P.H. Division, Hajipur 2023-24
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas for Panchayat Jurawanpur Karari-ward-(7B&8-Rajput Tola, 4&11B-Yadav Tola,9B-Rajput Tola,15&16B-Yadav Tola,19B-Yadav Tola,12B-Rajput Tola,14B-Harijan Tola and 1&2B-Rajput Tola. ) under Block Raghopur having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected)in Vaishali District under P.H. Division, Hajipur 2023-24.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in areas for Panchayat Daulatpur Chandi-ward-(6B-Muslim Tola),BishunpurBaladhari-ward-(1B-Dalit Tola,7B-Paswan Tola),Gospur Ezra-ward-(6B-Mahadalit Tola),Arra-ward-(2B-Dalit Tola,3B-Yadav Tola),Gadai Sarai-ward-(14B-Muslim Tola, 3B-Yadav Tola) and ChukundaUrf Milki-ward-(1B-Mahto Tola,1C-Dalit Tola,2B-Dalit Tola) under Block Hajipur having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected)in Vaishali District under P.H. Division, Hajipur 2023-24.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas for Panchayat Alipur Hatta Ward No.01 (Sahni Tola), 11 (Yadav Tola), Panchayat Sarmastpur Ward No.05 (Sah Tola), 07 (Paswan Tola), 09 (Paswan Tola), Panchayat Dedhpura Ward No.09 (Dedhpura), 12 (Dedhpura), 13 (Dedhpura), 14 (Dedhpura), Panchayat Chamarhara Ward No.09 (Chamarhara) and Panchayat Lawapur Mahanar Ward No.10 (Lawapur Mahnar) of Block Mahanar having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) in Vaishali District under P.H. Division, Hajipur 2023-24.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas for Panchayat Chakfaiz Ward No. 01 (Paswan Tola), 02 (Ram Tola), 09 (Sahni Tola), 12 (Rajput Tola), 13(Paswan Tola), 14(Paswan Tola), Panchayat Murautpur Ward No.02 (Kushwaha Tola), 04 (Bind Tola), 05 (Ravidas Tola), and Panchayat Nayagaon East Ward No.04 (Yadav Tola), 10 (Yadav Tola) of Block Sahdei Buzurg having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) in Vaishali District under P.H. Division, Hajipur 2023-24.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in areas for Panchayat Mail-ward-(5B&6-Muslim Tola,8B-Kumhar Tola),Rajasan-ward-( 10B- Paswan Tola,07- Paswan Tola,14B&15-Mahadalit Tola),SitalpurKamalpur-ward-(1B-Chakmasud Tola,14B-Ramdauli Tola,16B-Ramdauli Tola) and Nawanagar-ward-(1B-Milki Tola, 14B-Shyampur Tola, 6B&12- Mahadalit Tola) under Block Bidupur having no ground water quality issues; with Electric Driven Pumps in the District of Vaishali, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) in Vaishali District under P.H. Division, Hajipur 2023-24.