Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 54 of 82
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Bhagalpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P. H. Dvision Bhagalpur East, Bhagalpur Panchayat Harinkol Ward No. 1A, 1B, 9A and Panchayat Pirpainti Ward No. 4A, 5A, 6A, 7A under Block Pirpainti.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Bhagalpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P. H. Dvision Bhagalpur East, Bhagalpur.Panchayat Hardevchak Ward no 7A, 1A, 8A & 8B Panchayat Bara Ward no 2A & Payalapur Ward no 3A Under Pirpainti Block.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Bhagalpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P. H. Dvision Bhagalpur East, Bhagalpur.Panchayat Fatehpur Ward No. 2A, 6A, 12A, 12B and Panchayat Sabour Ward 5A, 8A under Block Sabour
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Bhagalpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P. H. Dvision Bhagalpur East, Bhagalpur.Panchayat Prasbanna Ward no 2A, 6A & 6B Under Pirpainti Block.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Bhagalpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P. H. Dvision Bhagalpur East, Bhagalpur.Panchayat Prasbanna Ward no 2A, 6A & 6B Under Pirpainti Block.
- ExpiredConstruction of Tubewell of Taken Over Scheme of Panchayati Raj Department of Block -Kahalgaon, Pirpainti, Sanhaula, Bihpur and Rangra under P.H. Division, Bhagalpur East, Bhagalpur 2024-25.
- ExpiredConstruction of 33 Nos. 125mm X 40mm X 61M deep Tube well with I.M.-II Hand Pump, Platform , Drain and Soakpit in place of old and defunct Twell in Water Scare Area (Natural Calamity) for the year 2024-25 in Patna District under P.H. Division, Patna East, Patna..
- ExpiredConstruction of 32 Nos. 125mm X 40mm X 61M deep Tube well with I.M.-II Hand Pump, Platform , Drain and Soakpit in place of old and defunct Twell in Water Scare Area (Natural Calamity) for the year 2024-25 in Patna District under P.H. Division, Patna East, Patna..
- ExpiredGR NO-01 NAME OF WORK- Construction of new deep hand-pumps ( India Mark-II), Machine Drilled Boring, Soak-pit 1.00m dia & 2.00m deep with dry brick honey-comb shaft with bricks (100B) of class designation and 3 meter long P.C.C. Drain for providing drinking water in water scarce area & drought area at different places in Aurangabad District under P.H. Division Aurangabad. (Year :? 2024-25.)
- ExpiredConstruction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain . And Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc. for Handpump complete as per detail below . Under P.H Division Darbhanga for the year 2024-25. (47 no's)
- ExpiredConstruction of new 125mm X 40mm dia X 61 meter deep hand operated T/well with India Mark II Hand Pump with Platform and drain . And Construction of soak pit 1.0 m diameter 2.0 m deep with dry brick honey comb shaft with bricks of class designation 100B etc. for Handpump complete as per detail below . Under P.H Division Darbhanga for the year 2024-25. (47 no's)
- ExpiredConstruction of 75 No. 125mm X 40mm X 61M deep Tube well with I.M.-II Hand Pump, Platform , Drain and Soakpit under scheme for Sinking of New Handpumps for drinking water due to Heat and Heatwave conditions and falling water level in District Due to Natural Disaster and Drought for the year 2024-25 in Patna District under P.H. Division, Patna West, Patna
- ExpiredConstruction of HYTW with Masonary Chamber, Leakege Repair, HSC Repair, Pipeline Maintenance and submersible motor pump set with all accessories including extension of L.T. line from nearest source up-to pumping station as per direction of E/I according to list attached for in the Sub Division Samastipur, Dalsingsarai, Ujiyarpur & Rosera under P.H. Division Samastipur for the year 2024-25.
- ExpiredConstruction of Tubewell of Taken Over Scheme of Panchyati Raj Department of Block - Barahat, Amarpur, Rajoun & Dhoraiya under P.H. Division, Barahat 2024-25.
- ExpiredScheme for sinking of new hand pump during "Lok Sabha" election 2024 at poling booth and during summer reason in water scares area for the year 2024-25. Construction of Sustainable Tube-Wells 2024-25 (With IM-II Hand Pumps) 11 Nos. 125 mm dia. X 45 m deep GPT and 10 Nos. 125/115mm dia. X 60m drilled tube well with P.C.C. Platform & drain and Soak Pit with defect & liability period of Twelve months in place of old defunt / Ordinary HP in the water scarce areas for the year 2024-25 under jurisdiction of P.H. Division Sherghati in District of Gaya.
- ExpiredScheme for sinking of new hand pump during "Lok Sabha" election 2024 at poling booth and during summer reason in water scares area for the year 2024-25. Construction of Sustainable Tube-Wells 2024-25 (With IM-II Hand Pumps) 3 Nos. 125 mm dia. X 45 m deep GPT and 10 Nos. 125/115mm dia. X 60m drilled tube well with P.C.C. Platform & drain and Soak Pit with defect & liability period of Twelve months in place of old defunt / Ordinary HP in the water scarce areas for the year 2024-25 under jurisdiction of P.H. Division Sherghati in District of Gaya.
- Expired(a) Construction of 125mm dia X 45 mtr deep Gravel packed T/well- 07 Nos. (b) Construction of 125mm/115mm X 61 mtr deep Drilled T/well-13 Nos. (C)-Construction of Plateform, Drain and Soakpit at each constructed hand pumps as per Estimate
- Expired(a) Construction of 125mm dia X 45 mtr deep Gravel packed T/well- 07 Nos. (b) Construction of 125mm/115mm X 61 mtr deep Drilled T/well-13 Nos. (C)-Construction of Plateform, Drain and Soakpit at each constructed hand pumps as per Estimate
- Expired(a) Construction of 125mm dia X 45 mtr deep Gravel packed T/well- 07 Nos. (b) Construction of 125mm/115mm X 61 mtr deep Drilled T/well-13 Nos. (C)-Construction of Plateform, Drain and Soakpit at each constructed hand pumps as per Estimate
- Expired(a) Construction of 125mm dia X 45 mtr deep Gravel packed T/well- 07 Nos. (b) Construction of 125mm/115mm X 61 mtr deep Drilled T/well-13 Nos. (C)-Construction of Plateform, Drain and Soakpit at each constructed hand pumps as per Estimate
- Expired(a) Construction of 125mm dia X 45 mtr deep Gravel packed T/well- 07 Nos. (b) Construction of 125mm/115mm X 61 mtr deep Drilled T/well-13 Nos. (C)-Construction of Plateform, Drain and Soakpit at each constructed hand pumps as per Estimate
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Bounsi Panchayat-Faga (Ward No.-7,7A,8,8A,11,11A,14) of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Bounsi Panchayat-Faga (Ward No.-1,4,4A,5,6,6A), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Bounsi Panchayat-Sanpdahar (Ward No.-1,1A,2,4,4A,5), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Bounsi Panchayat-Sanpdahar (Ward No.-8,9,10,11,13,14), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Bounsi Panchayat-Sanga (Ward No.-1,1A,2,2A,3,3A,4), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Dhoraiya Panchayat-Chalna (Ward No.-4,5,7,8,9,9A), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Dhoraiya Panchayat-Sijjat Baliyas (Ward No.-3,4,7,10,14), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Dhoraiya Panchayat-Sainchak (Ward No.-1,5,6,7,8), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Dhoraiya Panchayat-Jaipur (Ward No.-3,4,6,9) & Karaharia (Ward No.-9,9A) of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Dhoraiya Panchayat-Ahiro (Ward No.-1,3,4,5,6), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- AMARPUR, Panchayat-Vishanpur (Ward No.-7,8,12,12A) & Garibpur (ward No.- 4,13), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- AMARPUR, Panchayat-GORGAMMA (Ward No.-1,1A,5,12,16,16A), of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Block- Rajoun, Panchayat-SANJHA SHYAMPUR (Ward No.-2,3,6,7,9,11,11A) of Banka District of Bihar on turn-key basis with 6 months Trial Run after Commissioning and Comprehensive Operation and Maintenance of 60 months after successful completion of Trial Run Period under Mukhyamantri Nishchay Yojna (Quality Affected) Under P.H. Division,Barahat.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A(uper Khajuria), 1B(khjuriya Nich Tola), 3C(akka), 5(Bhelwa), 9A(dhawona Gulaindih) of Panchayat- South Kaswawsila, Block- Chandan (05 No Scheme) for Year 2023-24 for Year 2023-24
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 13A(gerua),7a(teliadih), 7B(balsara Chukidar Tola), 10A(bafera Aadiwasi Tola), 10B(barfera Tetria Ray Tola)of Pachayat-barfera Tetria, Block- Chandan (05 No Scheme) for Year 2023-24
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Paharpur), 2B (Lohtaniya Kawariyapath), 11A (Dhakna), 10A (Sitane), 7A (Tona Pathar Baratar), 4A (Belagar), Panchayat- Danubasar, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2B (Batukumar), 2C (Bargaiya), 2D (Katharatand), 3D (Mathuriya), 4D (Thankiya Tilha), 5A (Diggi Bari Bhakta Tola), Panchayat- Ashudha, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka,ward No- 1A (Chinguliya), 8C (Ranga), 3C (Barakol), 3D (Dudhkitari), 6A (Patardih Aadiwasi Tola), 6B (Warne), Panchayat- South Warne, Block- Chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 11A (Barakola), 9A (Horilwatand), 11B (Gadhitand Aadiwasi Tola), 17A (Dullisar Pujhar Tola), 16A (Satletwa Chouk), Panchayat- Dhanubasar, Block-chandan (5 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1B (Domajan Yadav & Pujhar Tola), 2A (Babukura), 2B (Damga S.C Tola), 7 (Chandan), 11A (Chandan), 12 (Chandan Harijan Tola), Panchayat- Chandan, Block- Chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 4A (Karikado Souli Waran), 5B (Kushiyari), 9A (Kamaldih), 9B (Kamaldih), 9C (Laxmipur), Panchayat- Behra, Block-banka (05 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 4A (Gorwamanan Ajad Nagar), 4B (Manadda), 6A (Kokritari Deharwa Tola), 6B (Murli), 6C (Kokritari Tilla Aadiwasi Tola), 6D (Kokritari Pax Tola), Panchayat- Chatrapal, Block-banka (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 3A (Harpur), 8A (Kakwara Mehatar Tola), 9A (Kakwara Yadav Tola), 10A (Het Sonari Ray Tola), 10B (Wishuwatand), Panchayat- Kakwara, Block-banka (05 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Dodri), 2B (Kharkhan), 8A (Baghmari Turi Tola), 10A (Bhaluakura), 12A (Pitariya), 12B (Bhoktakura), Panchayat-barwasini, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Bishanpur), 7A (Kalahajari), 7B (Butatari), 7C (Murupakra), 14A (Hajarikhurd), 8A (Dudhiyatari), Panchayat- Jaipur, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 12A (Patakha), 12B (Ranidih), 14A (Sirsana), 2A (Chilkara), 4A (Bhitiya), 7A (Bargachha), Panchayat- Damodra, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No-6a(ghagrijor Yadav Tola,4a(bijahara), 3A(barwasini), 11A(lilawaran), 11B(kaitha Tkkar), 8A(baghamari Tanti Tola), Panchayat- Barwasini, Block- Katoria (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A(pujardih), 3A(teenghrw, Dalit Tola), 4A(bhairopur, Mahadalit Tola), 7A(mathdih), 8A(gangira), 8B(jangira) Panchayat- Sourth Warne, Block- Chandan (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 5A (Kaligari), 6A (Barnpur), 8A (Nilkung), 9A (Dabrakol), 3A (Kamalpur Nich Tola), 10A (Fattapathar), Panchayat-basmatta, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 8A (Dubba Jha Tola), 8B (Bhavandeva Uper Tola), 9A (Dumriya Tila Pujhar Tola),9b (Simariya Thakur Tola), 9C (Manikpur Pandit Tola), 1D (Dumarkola), Panchayat- Gouripur, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 3A(kurbi Tola), 4A(turki Mahadlit Tola), 4B(dudhwa), 4C(bhaluwahi), 6A(dasotari), 7A(belhariya Adiwasi Tola) of Panchyat- Gouripur, Block-chandan for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka Ward No- 7C(west Telngwa), 7D(fatoria), 8A(pakriya Santhal Tola),9a(chatrahan Kali Mandir Tola), 6C(andhara Tari) of Panchayat-west Katsakra, Block-chandan for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka Ward No-9a(latane Turi Tola), 11A(damjor Pandit Tola), 7A(lohari),3a(dhobani Nich Tola), 5A(biharo Uper Tola) Panchyat-koria, Block-chandan for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Bhora Bazar S.C Tola), 3A (Kurawa), 9A (Lathane Turi Tola),10a (Doniya),10b (Durmariya), 12A (Koria Pandit Tola), Panchayat- Koria, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 5A (Pelwa Lalmatiya), 8A (Chanchhi), 9A (Vishkarma Tola), 3A (Jhajha), 9B (Vishwa Tila), Panchayat- Siljori, Block-chandan ( 5 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 13A(samta),4a(ghiyai), 1A(dumariya), 18A(dhakaniya), 18B(ramsraiya), 18C(asgulni), 18D(asgulnipanchayat- Kheshar, Block-fulldumar (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 6A (Chunmakhand), 6B (Ramchakura), 6C (Bazara Kali Sthan), 6D (Pakria), 7A (Lilawaran Pujhar Tola), 7B (Telangwa), Panchayat- West Katsakra, Block-chandan, (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 10A (Naiyadih), 9A (Ourawaran), 2A (Bajadiya Sarua), 1A (Kaithakura), 1B (Bahadiya Mor), 5A (Garura), Panchayat- Damodra, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 3A (Budhighat Purab Tola), 3B (Bhudhighat South Tola), 4A (Badhmasiya), 6A (Telbanga), 14A (Paharpur), Panchayat-damodra, Block-katoria (05 No Scheme) for Year 2023-24.