Physical Progress
20.2%
Drone-monitored
Financial Progress
12.0%
Of awarded cost
Awarded Cost
₹1260 Cr
Contract value
Length
35.2 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
2603
Aerial captures
Stage
Under Construction (AD issued)
Due Date
03-09-2027
Likely Date
03-09-2027
20.2%
Physical Done
Awarded
04-09-2025
Construction Started
04-09-2025
In Progress
Near Completion
-
Completed
03-09-2027
UPC
N/04044/01002/BR
National Highway
319B
Regional Office
RO-Patna
State
Bihar
Mode
HAM
Length
35.2 km
Contractor
Varanasi Kolkata Highway Package 6 PVT LTD
Project Stage
Under Construction (AD issued)
Drone Frames
2603 frames
Last Flight
2026-02-22
Awarded Cost
₹1260.00 Cr
Capital Cost
₹1915.99 Cr
Start Date
04-09-2025
PCOD Date
-
Scheduled Completion
03-09-2027
Likely Completion
03-09-2027
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-06-16 09:06:53
Varanasi Kolkata Highway Package 6 PVT LTD
Physical progress stands at 20.2%. Financial utilization at 12.0%.
Project is on schedule or ahead of planned completion date.
Covers 35.2 km on 319B, improving regional connectivity.
2603 drone frames uploaded — real-time aerial monitoring is active for this project.
2,603 frames · NHAI surveillance footage · UPC N/04044/01002/BR