Original Cost
₹2379 Cr
Baseline estimate
Revised Cost
₹2379 Cr
Latest approved cost
Expenditure
₹984 Cr
Spent to date
Utilization
41.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1395 Cr
Budget left
Budget Utilization
41.4%Spent
₹984 Cr
Remaining
₹1395 Cr
Total
₹2379 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2379 Cr — no cost escalation recorded.
Expenditure stands at ₹984 Cr, which is 41.4% of the revised project cost.
Remaining budget: ₹1395 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Redevelopment of Ahmedabad railway station and associated infrastructure on engineering, procurement and construction mode is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2379.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Redevelopment of Ahmedabad railway station and associated infrastructure on engi"?
- Redevelopment of Ahmedabad railway station and associated infrastructure on engineering, procurement and construction mode is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Gujarat. Original cost: ₹2379 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2379 Cr has not been significantly revised. Expenditure: ₹984 Cr (41.4% of cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Redevelopment of Ahmedabad railway station and associated in is under the Ministry of Railways in the Railways sector. Project code: 613786. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Redevelopment of Ahmedabad railway station and associated in is one of several Bihar projects tracked under the Railways sector on the IPM system.