RailwaysIPM · Central Project#400047

Doubling of Lingaraj SILO connectivity of NTPC line and augmentation of NTPC exchange yard and NTPC Block Cabin.

Ministry of RailwaysOdisha
Revised Cost: ₹210 CrUtilization: 19.6%

Original Cost

₹210 Cr

Baseline estimate

On budget

Revised Cost

₹210 Cr

Latest approved cost

Expenditure

₹41 Cr

Spent to date

Utilization

19.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹169 Cr

Budget left

Budget Utilization

19.6%
0%25%50%75%100%

Spent

₹41 Cr

Remaining

₹169 Cr

Total

₹210 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2024

Revised Completion

31/12/2026

Completed

Project Details

Project Code400047
SectorRailways
MinistryMinistry of Railways
StateOdisha
Data Month2026-07

Financial Summary

Original Cost₹210 Cr
Revised Cost₹210 Cr
Expenditure₹41 Cr
Original End Date31/12/2024
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹210 Cr — no cost escalation recorded.

Expenditure stands at ₹41 Cr, which is 19.6% of the revised project cost.

Remaining budget: ₹169 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Railways. Ministry: Ministry of Railways.

Doubling of Lingaraj SILO connectivity of NTPC line and augmentation of NTPC exchange yard and NTPC Block Cabin. is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹210.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Doubling of Lingaraj SILO connectivity of NTPC line and augmentation of NTPC exc"?
Doubling of Lingaraj SILO connectivity of NTPC line and augmentation of NTPC exchange yard and NTPC Block Cabin. is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Odisha. Original cost: ₹210 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹210 Cr has not been significantly revised. Expenditure: ₹41 Cr (19.6% of cost). Data as of 2026-07.
QWhich ministry is responsible for this project?
Doubling of Lingaraj SILO connectivity of NTPC line and augm is under the Ministry of Railways in the Railways sector. Project code: 400047. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Doubling of Lingaraj SILO connectivity of NTPC line and augm is one of several Bihar projects tracked under the Railways sector on the IPM system.