Bhatni - Aunrihar with electrification 125 km excl Indara - Mau 116.95 km
Original Cost
₹2529 Cr
Baseline estimate
Revised Cost
₹2529 Cr
Latest approved cost
Expenditure
₹2297 Cr
Spent to date
Utilization
90.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹233 Cr
Budget left
Budget Utilization
90.8%Spent
₹2297 Cr
Remaining
₹233 Cr
Total
₹2529 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2024
Revised Completion
30/06/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2529 Cr — no cost escalation recorded.
Expenditure stands at ₹2297 Cr, which is 90.8% of the revised project cost.
Remaining budget: ₹233 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Bhatni - Aunrihar with electrification 125 km excl Indara - Mau 116.95 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2529.00 Cr, later revised to ₹2529.46 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Bhatni - Aunrihar with electrification 125 km excl Indara - Mau 116.95 km"?
- Bhatni - Aunrihar with electrification 125 km excl Indara - Mau 116.95 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Uttar Pradesh. Original cost: ₹2529 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2529 Cr has not been significantly revised. Expenditure: ₹2297 Cr (90.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Bhatni - Aunrihar with electrification 125 km excl Indara - is under the Ministry of Railways in the Railways sector. Project code: 705780. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Bhatni - Aunrihar with electrification 125 km excl Indara - is one of several Bihar projects tracked under the Railways sector on the IPM system.