RailwaysIPM · Central Project#613788

AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-ROAD BRIDGE AT SARAIGHAT - 7.062KM

Ministry of RailwaysAssam
Revised Cost: ₹1474 CrUtilization: 0.0%

Original Cost

₹1474 Cr

Baseline estimate

On budget

Revised Cost

₹1474 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1474 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹1474 Cr

Total

₹1474 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2029

Revised Completion

Completed

Project Details

Project Code613788
SectorRailways
MinistryMinistry of Railways
StateAssam
Data Month2025-07

Financial Summary

Original Cost₹1474 Cr
Revised Cost₹1474 Cr
Expenditure₹0 Cr
Original End Date31/12/2029
Revised DateN/A

Project Intelligence

Project is within original budget of ₹1474 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹1474 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Railways. Ministry: Ministry of Railways.

AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-ROAD BRIDGE AT SARAIGHAT - 7.062KM is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1474.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-ROAD BRIDGE AT SARAIG"?
AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-ROAD BRIDGE AT SARAIGHAT - 7.062KM is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Assam. Original cost: ₹1474 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1474 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2025-07.
QWhich ministry is responsible for this project?
AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-R is under the Ministry of Railways in the Railways sector. Project code: 613788. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. AGTHORI KAMAKHYA SECTION WITH CONSTRUCTION OF NEW RAIL CUM-R is one of several Bihar projects tracked under the Railways sector on the IPM system.