Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 30 of 82
- Expired(A) Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash in School, Block- H. Kharagpur under P.H Division, Munger for the year 2024-25. (Total nos. 09) (B) Construction of Toilet with septic tank in School, Block- H. Kharagpur under P.H Division, Munger for the year 2024-25. (Total nos. 38) (C) Repairs Works of Toilets in School, Block- H. Kharagpur under P.H Division, Munger for the year 2024-25. (Total nos. 24)
- Expired(A) Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash in School, Block- Dharhara under P.H Division, Munger for the year 2024-25. (Total nos. 25) (B) Construction of Toilet with septic tank in School, Block- Dharhara under P.H Division, Munger for the year 2024-25. (Total nos. 42) (C) Repairs Works of Toilets in School, Block- Dharhara under P.H Division, Munger for the year 2024-25. (Total nos. 19)
- Expired(A) Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash in School, Block- Bariyarpur under P.H Division, Munger for the year 2024-25. (Total nos. 18) (B) Construction of Toilet with septic tank in School, Block- Bariyarpur under P.H Division, Munger for the year 2024-25. (Total nos. 52) (C) Repairs Works of Toilets in School, Block- Bariyarpur under P.H Division, Munger for the year 2024-25. (Total nos. 74)
- Expired(A) Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash in School, Block- Asarganj under P.H Division, Munger for the year 2024-25. (Total nos. 03) (B) Construction of Toilet with septic tank in School, Block- Asarganj under P.H Division, Munger for the year 2024-25. (Total nos. 55) (C) Repairs Works of Toilets in School, Block- Asarganj under P.H Division, Munger for the year 2024-25. (Total nos. 31)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in areas having ground water quality issues; with Electric Driven Pumps and Fluoride/Iron/ArsenicRemoval Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/ etc.) certified by CSIR or any other institute of national repute. In the District of Munger, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected). Under P.H. Division, Munger.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischayyojna in areas having ground water quality issues; with Electric Driven Pumps and Fluoride/Iron/ArsenicRemoval Treatment Plant having Technology (Adsorption/ Ion exchange/ Membrane/ Nano Technology/ etc.) certified by CSIR or any other institute of national repute. In the District of Munger, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected). Under P.H. Division, Munger.
- ExpiredComprehensive Operation & Maintenance and Special repair of ward level piped water supply schemes constructed by ?Panchayati Raj Department? and handed over to PHED for a period of 4 years; excluding the cost of energy charges and operator wages in Blocks -Dariyapur and Maker; a total of 420 nos. of schemes in Saran (Chapra) district under P.H. Division, Chapra for the year 2024-25.
- ExpiredComprehensive Operation & Maintenance and Special repair of ward level piped water supply schemes constructed by ?Panchayati Raj Department? and handed over to PHED for a period of 4 years; excluding the cost of energy charges and operator wages in Blocks - Baniyapur and Lahladpur; a total of 487 nos. of schemes in Saran (Chapra) district under P.H. Division, Chapra for the year 2024-25.
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for48 Month; excluding the cost of energy charges and operator wages in Block- Gaunaha (180 Nos Scheme), Mainatand (77 Nos Scheme) & Sikta (190 Nos Scheme) (Total No. of scheme. :- 447 Nos) in West Champaran District. Group 5
- ExpiredComprehensive Operation & Maintenance and Special repair of ward level piped water supply schemes constructed by ?Panchayati Raj Department? and handed over to PHED for a period of 4 years; excluding the cost of energy charges and operator wages in Blocks - Ekma and Manjhi; a total of 558 nos. of schemes in Saran (Chapra) district under P.H. Division, Chapra for the year 2024-25.
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredFor Balance work (Design, Construction, Supply, Commissioning and Comprehensive Operation & Maintenance) of non quality water supply scheme at ward number 2,3,4,6 panchayat KUTLUPUR block KHIZERSARAI, district Gaya on Turnkey basis under the provision of ?Har Ghar Nal Ka Jal Yojna?.
- ExpiredConstruction of Hand wash Station with running water supply in different school in the district of Araria under P.H. division, Araria for the year 2024-25 DISTRICT - ARARIA
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Sonpur consisting of 2 Blocks (Dariyapur & Sonpur) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Sonpur consisting of 4 Blocks (Dighwara,Garkha, Parsa & Maker) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Baniyapur consisting of 4 Blocks (Baniyapur, Lahladpur,Marhourah & Amnour) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Mashrakh consisting of 4 Blocks (Mashrakh,Panapur, Ishuapur & Taraiya) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Chapra consisting of 2 Blocks (Jalalpur & Manjhi) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstrunction of 100 mm x 90 M deep Boring with 1 HP Submersible motor, PVC Water Storage Tank (1000 Ltr.) and Running water facility with Hand Wash Station in different schools in P.H.Sub Division, Chapra consisting of 4 Blocks (Chapra Sadar, Rivilganj, Nagra & Ekma) in Saran District under P.H.Division, Chapra for the year 2024-25
- ExpiredConstruction of 2 unit Toilet Complex with staircase (1 unit at G.F. for Boys and 1 Unit F.F. for Girls)1 nos septic tank and electrification Flush charge with 1000 Ltr UPVC water Tank in Jokihat block of District Araria Under P.H. Division, Araria for year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka Ward NO-10C (Tilak Nagar), 8B (Bichal Tola), 6B (Jadgeghutu), 7B (Sah Tola), 4B (Bela)( 5 Number of Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka Ward No-5a (Dumaria), 7A (Gorgama), 9A (Mushari), 11C (Khuthari), 12B (Jamni), 14A (Kharonda) for 6 Number of Scheme
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Laskari), 2B (Laskari), 5A (Teliya), 6A (Teliya), 8A (Chhoti Dhaka), 1A (Bhitti), Panchayat- Teliya, Block-banka (06 No Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 3A (Nimatand), 3B (Manghidih), 7A (Basatpur Prabhawati Nagar), 8A (Domuhan Muslim Tola), 9A (Domuhan), Panchayat- Domuhan, Block-banka (05 No Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 10B (Biharotari), 14B (Darbepatti), 13A (Gorwakura), 2A (Bandarmara), 1A (Telangwa Harijan Tola), 15A (Darbepatti), Panchayat-kathoun(domsarni), Block-katoria (06 No Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 11A (Garna), 10A (Biharo Tari Kapri Tola), 2A (Telangwa Harijan Tola), 2B (Telangwa Nich Tola), 3A (Raja Bathan), 14A (Mahadevpur), Panchayat - Kathoun(domsarni), Block-katoria (06 No Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar Ward No.- 5A (Dubraj), 5B (Ledhma), 3A (Nimatand(harikura)), 1B (Manjra Tola), 4B (Kaithatikar (Sangram Tola)), 18A (Ghutiya) (For 05 Number of Scheme.)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 1A (Bhimiya Uper Tola), 1B (Bhimiya Nicha Tola), 2A (Bhoktadih), 12A (Kumharatari), Panchayat- Harhar, Block- Katoria (04 No Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2 (Siljori More), 10 (Kanbhitiya), 1B (Morbi & Trighunadih), Panchayat- Siljori, Block-chandan (3 Nos Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, 6A(harkatta), of Panchayat-koriya 5A(mandedih) of Panchayat-gouripur, Ward No-11b(milan Sharma Tola), 4(Pandey Tola) of Panchayat-chandan of Block-chandan (4 Nos Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2 (Bagra), Panchayat- North Warne, 1A (Siljori), Panchayat- Siljori, 6B (Barmasiya Turi Tola), Panchayat- Ashudha, 13B (Garwa Niyasi Tola), Panchayat- Barfera Tetriya, Block-chandan for Year 2023-24.Me) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka Ward No- 7A (Dharmrahi), 8A (Bahorna), 4A (Bisanpur), 3A (Bahorna), 2A (Nagel) for 5 Number of Scheme.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar, Ward No- 14A (Lalmatiya), 14B (Pipra Tola), 14C (Chittokhand), 6B (Kashidih), 1A (Nakti) (5 Nos Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, 8A(goghadabar),8b(shloniya Das Tola), 10A(doniya Tanti Yadav Tola), 10B(dumariya), 12A(bhora Bazar Yadav, Thakur Tola) of Panchyat-koria, Block-chandan for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 7A(nawadih), 8A (Pipra Hat Per), 3A (Ulhi), 1A (Kolhaydih Dudhaniya), 1B (Kolhaydih Bhimadih), 2A (Kolhaydih Tulsipur), Panchayat- North Kaswa Wasila, Block-chandan (6 Nos Scheme) for Year 2024-25.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having no ground water quality issues; with Electric Driven Pumps in the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) Under P.H. Division, Ara, (BLOCK:- UDWANTNAGAR, PANCHAYAT-BELAUR WARD NO-2,3,(4&5),6,(10,11,12,13) and 17 in the district Bhojpur. (GR-01)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, ward -01,04,06,07,05B, of Gidha Panchayat , Ward-01,10 of Kulhariya Panchayat Ward no-11 of RAJAPUR Panchayat under Block-Koelwar in the district Bhojpur. (GR-02)
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under Har Ghar nal Ka Jal nischay yojna in areas having ground water quality issues; with Electric Driven Pumps and Arsenic Removal Treatment Plant having Technology (Adsorption/ Ion exchange/Membrane/Nano Technology/ etc.) certified by CSIR or any other institute of national repute.In the District of Bhojpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Quality Affected) Under P.H. Division, Ara, Ward no 05 of Babhangawa , ward no 02 & 12 of Bishunpur , ward no 11,13,&14 of West babura , Ward no 07,08,09 of Panchayat East babur under Block-Barhara in the district Bhojpur. (GR-01)
- ExpiredOperation and Maintanance of High Yielding T/Well,Pump House, Elevated Service Reservoir Standpost, Distribution System, With all Mechanical Equipement & Material for 60 months. Under re-organization of Rural Piped Water Supply Scheme in Adjoining Area of District Araria Under P.H. Division, Araria.
- ExpiredFive year of Operation and Maintenance of Bhushra SVS. Dahila Patsarma SVS, Shivdaspur SVS, Gaighat PWS, Mirapur PWS, Bariyarpur Khand PWS, Dubha PWS, Baruari PWS, Macchi PWS, Sadikpur Muraul PWS, Under P.H.Division, Muzaffarpur.
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Basopatti -Panchayat-Kataiya,Hathpur Parsa,Siriyapur,Chhatauni,Madiya,Damu,Arghawa,Birpur,Ghorbanki,Mahinathpur,Phent,Basopatti West,Basopatti East,Khauna. &Block- Jainagar-Panchayat-Barhi,Belhi West,Belhi East,Belhi South,Baira,Dewdha Middle,Dewdha South,Dewdha North,Dorwar,Dullipatti,Jaynagar Basti,Korhiya,ParwaBelhi,Rajauli,Selra. (Total No. of scheme. :- 433 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Khajauli-Panchayat- Sukki,Enerwa,betakkarghatti,Chatra gabraura North,Chatra gabraura south,Mahua ekdara,Rasidpur,Bhakua,Khajauli,kanauli,Datuar,sarave,Chandradih,Narar east,& Block- Kaluahi panchayat- Haripur North,malmal north,Loha,Madhepur,Haripur South,Karmauli,Kalikapur,Palimohan& Block-Harlakhi-panchayat-Gangaur,Hisar,Betaparsa,Borhar,Karuna,Jhitki,Sothgown,Pipraun,Phulhar,Kalna,Kauahabarhi,Bishaul,Naharnea,Sonai,Khirhar,Sisauni,Harlakhi. (Total No. of scheme. :- 541 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Benipatti- Panchayat-'Shahpur ,Basaitha ,Brahmapura, Dhanga, Arer North ,Akaur, Arer South ,Bankatta (Damodarpur) ,Barari, Betauna ,Vishanpur ,Dhakjari ,Ganguli, Kapasiy,a Karhara, Kataiya ,Manpaur ,Meghvan, Mahamadpur, Mureth, Nagwas ,Nagdah Baline, Navkarhi ,Pali, Paroul, Parjuar Parakouli, Parsauna ,Salha S,amada, Tyonth& Block-Madhwapur- Panchayat-Madhwapur,Sahar North,Utra,Taraiya,Pihwara,Balwa,Salempur,Basuki Bihari North,Basuki Bihari South,Vishanpur,Pirokhar,Mukhiyapatti,Sahar South(Total No. of scheme. :- 516 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Bisfi - Panchayat-Aunsi Babhangawa( North), Aunsi Babhangawa( South), Khari-Banka(North), Khari- Banka(South), Simiri, Bhoj- Pandaul, Jafra, Sahdulahpur,Nahas Rupuli(North), Nahas Rupuli(South), Parsauni(North), Parsauni(South), Raghapura, Singhaso, Singhiya (East), Singhiya (West), Sohans,Nurchak,Bisfi, Balha, Raghauli, Bhairwa, Rathaus, Jagwan(East), Jagwan(West), Tisi Narsham(South), Tisi-Narsham(North), (Total No. of scheme. :- 355 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Pandaul -Panchayat-Pandaul west, Pandaul East, Sakri West, Sarisavpahi west,sarisavpahi east, Sripurhati north, Sripurhati south,sripurhati middle, Dahivat Madhopur west, Dahivat Madhopur East, Pandaul middle, Sagarpur, Mokarmpur, Narpatinagar, Sakri East, Meghaula, Bhawanipur, Pachadhi, Belahi, Bhaura, Bathne, Udaipur Bithuar, Bhagwatipur, Salempur.Biraul,Sankorth(Total No. of scheme. :- 312 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredName of The Work: - Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Muzaffarpur, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months after trail run period under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P.H.Division, Muzaffarpur for year 2023-24.( Block :-Musahari, Panchayat :- Patahi, Ward No :- 03 Fardo Tola ,Ward No :- 12 Patahi Rup Tola, Panchayat :- Susta, Ward-6 Mohammadpur Kazi Tola-07 Mallah Tola.
- ExpiredComprehensive operation and maintenance and Special repair of ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages in Block- Rahika- Panchayat- Rahika, Husainpur, Satlakha, Saurath, Jagatpur, Nazirpur, Kakraul North, Kakraul South, Basauli, Khajuri, Izra, Lakshmipur, Samaul , Malangia, Sunderpur Bhithi, Maksuda, Sanaur. & Block- Rajnagar- Panchayat-Karahiya East,Mangrauni North,Sugauna South,Raghuni dehat,Koilakh,Simri,Rampatti,Pilakhwar,Satghara,Kaithahi,Raghopur Balat,Chichri Kanungo,Singiyaun,Bhatsimar East,Bhatsimar West,Patwara South,Patwara North,Sivipatti,Sugauna north ,Bhariya Bisunpur (Total No. of scheme. :- 222+255 = 477 Nos) under P.H Division Madhubani for the year 2024-25. (Detailed list of Item wise Work Rate are enclosed.)
- ExpiredName of The Work: Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash Station,Kitchen Shed, Toilet with septic tank and soak pit in government school of Block Patepur and Jandaha in Vaishali District.
- ExpiredName of The Work: Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash Station, Toilet with septic tank and soak pit and Reparing of Old Toilet in government school of Block Mahua and Rajapakar in Vaishali District.
- ExpiredName of The Work: Construction of 150 mm X 90 M deep Boring with 1 HP Submersible motor and Running water facility with Hand Wash Station,Kitchen Shed, Toilet with septic tank and soak pit and Reparing of Old Toilet in government school of Block Bhagwanpur, Lalganj, Chehrakala and Goraul in Vaishali District.