Public Health Engineering Department (PHED) Tenders
4,885 procurement notices from Public Health Engineering Department — Water Supply & Sanitation sector · Page 24 of 82
- ExpiredComprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the ?Panchayati Raj Department? and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :- AMAHI, BASUARI, BISHANPUR, BRAHAMPUR NORTH, BRAHMPUR BATHNAHA, BRAHMPUR SOUTH, SARAUTI, CHIKNA, INARWA, KEOTANA, NAUWA BAKHAR, PARSA NORTH, PARSA SOUTH, PIROJGADH, SANGI, CHHAJNA, SUDAI RATOLI, MAHINDWAR BLOCK :- GHOGHARDIHA & PHULPARAS having no. of scheme 230 & 12 respectively Total No. of Scheme-242 no. under P.H Division, Jhanjharpur For the year 2024-25.
- ExpiredGr No-09 Design, Construction, Supplying,testing, Commissioning of Mini Rural Piped Water Supply Scheme with Electric Driven Pumps on Turnkey Basis After Completion and Successful,commissioning with Six Months Trial Run and There After Sixty Months Comprehensive Operation and Maintainance for Non Quality Tola/ Habitation of Block -Nabinagar , Panchayat - Chandragarh (W.no.-12), Panchayat - Rampur (W.no.-13, 01 & 02) and Panchyat-tandawa, (W.no.-10, 01 & 03)
- ExpiredGR NO-06 DESIGN, CONSTRUCTION, SUPPLYING,TESTING, COMMISSIONING OF MINI RURAL PIPED WATER SUPPLY SCHEME WITH ELECTRIC DRIVEN PUMPS ON TURNKEY BASIS AFTER COMPLETION AND SUCCESSFUL, COMMISSIONING WITH SIX MONTHS TRIAL RUN AND THERE AFTER SIXTY MONTHS COMPREHENSIVE OPERATION AND MAINTAINANCE FOR NON QUALITY TOLA/ HABITATION OF BLOCK -MADANpur , PANCHAYAT - mahuawa (W.NO.- 5,6,8,10) & PANCHAYAT - WAR( W.NO.- 10,12,13)
- ExpiredComplete the physical facilities in the government schools of the West Champaran District, School wise Repair of Toilet, Construction of Toilet facility, Construction of Kitchen Shed, Electrification and Major Repair Work under P.H Sub Division, Ramnagar
- ExpiredGr No-03 Design, Construction, Supplying,testing, Commissioning of Mini Rural Piped Water Supply Scheme with Electric Driven Pumps on Turnkey Basis After Completion and Successful,commissioning with Six Months Trial Run and There After Sixty Months Comprehensive Operation and Maintainance for Non Quality Tola/ Habitation of Block -Deo , Panchayat- Rampur Baradna (Ward No-4,5) Panchayat - Bedhani ( W - 1,3,4,6,10,11,12)
- ExpiredConstruction of different type of ACR with/without stair & Verandah including electrification work in goverment school of West Champaran District under P.H. Division, Bettiah for the session 2024-25.
- ExpiredGr No-03 Design ,Construction,supplying,testing,commissioning of Mini Rural Piped Water Supply Scheme with Electric Driven Pumps with Fluoride Treatment Plant on Turnkey Basis After Completion and Successful,commissioning with Six Months Trial Run and There After Sixty Months Comprehensive Operation and Maintainance for Quality Tola/ Habitation of Block-madanpur, Panchayat-salaiya (Ward No-03, 06, 07, 04, 13 & 09)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Moter Pumps and Arsenic Removel Treatment Plant Having Technology (Adsorption/ion Exchange/membrane/nano Technology Etc.) of Csir or Certified by Csir or Any Other Technology Endorsed/approved by GOI in the Arsenic Affected Left Out Habitations Ward No. 04 (Yadav Tola), Panchayat- Bochaha, Ward No.-01 ( Rajput Tola), Panchayat- Dubaha, Ward No.05,02,10 (Rajput Tola), Panchayat-harail, Ward No.- 11 (Yadav Tola), Panchayat-karimnagar, Block-mohiuddinagar, District -Samastipur on Turn-key Basis with 06 Month Trail Run After Commissioning and Comprehensive Operation and Maintenance of 60 Months After Successful Completion of Trail Run Period Under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn-key Basis Under P.h.division Samastipur.
- ExpiredComprehensive Operation & Maintenance work of PWS Basantpur, Goreyakothi, Pachrukhi and Ziradei, including cost of energy charge and operator wages, for five years in district of siwan under P.H DIVISION SIWAN.
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna with Electric Driven Pumps in the District of Gaya, Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months after trail run period under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) under P.H.Division, Gaya for year 2024-25.( Block :- Neechak Bathani, Panchayat :- Telari, Ward No :- 7 Kasibigha Bhuntoli, PANCHAYAT:- Telari, Ward No :- 8 Neemchak, ,PANCHAYAT:- Telari ward 14 Purvi gram sura, Pnachayat :- Telari,Ward 13, Kendua tilha,Panchayt:-Telari, ward 9 Dakna par, panchayat:-Singhaul ward 2,Simrur, Panchayat :Singhaul :-ward 3 Simraur .
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka, Ward No- 2B (Tilakpur Harijan Tola), 12B( Jilebiyamod), 10B (Mahesa), 4B (Baniya Tola), 4C (Baniya Tola) for 5 Number of Scheme.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka, Ward No- 11A ( Baliya), 4B (Tilwariya), 6B (Nyasi), 5A (Ranganiya) for 5 Number of Scheme.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-banka Ward No- 7A (Dharmrahi), 8A (Bahorna), 4A (Bisanpur), 3A (Bahorna), 2A (Nagel) for 5 Number of Scheme.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar, Ward No- 6A (Adiwasi Tola), 6B (Badla Turi Tola), 6C (Badla Near School), 6D (Sugado), 5A (Jhikuliya), 7A (Madhua,jamua) (For 6Number of Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Block-belhar, Ward No- 14A (Lalmatiya), 14B (Pipra Tola), 14C (Chittokhand), 6B (Kashidih), 1A (Nakti) (5 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 4A (Gorwamanan Ajad Nagar), 4B (Manadda), 6A (Kokritari Deharwa Tola), 6B (Murli), 6C (Kokritari Tilla Aadiwasi Tola), 6D (Kokritari Pax Tola), Panchayat- Chatrapal, Block-banka (06 No Scheme) for Year 2023-24.
- ExpiredDesign,design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 2A (Nimatand), 11A(manghidih), 9A(basatpur Prabhawati Nagar), 12A(domuhan Muslim Tola),12b(domuhan) Panchayat- Jamdaha, Block-katoria (05 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 14 (Pardih), 2A (Amgachhi), 2B (Belhariya), 1A (Shalaiya Bari), 1B (Rojhabaran), 3A (Chandan), Panchayat- Chandan, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 8A (Bankidih), 8B (Dharmadih), 7A (Barmasiya), 6A (Signan), 4C (Pilwa Santhan Tola), 2A ( Madnakura) Panchayat- Ashudha, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 7A(nawadih), 8A (Pipra Hat Per), 3A (Ulhi), 1A (Kolhaydih Dudhaniya), 1B (Kolhaydih Bhimadih), 2A (Kolhaydih Tulsipur), Panchayat- North Kaswa Wasila, Block-chandan (6 Nos Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 15A (Machanawaran), 15B (Pokna), 7A (Chiraiya Mod), 12B (Kunnikhar), 9A (Tetariya Waran), 12C (Mekana), Panchayat-kolhasar, Block-katoria (06 No Scheme) for Year 2023-24.
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 13A (Panchkathiya), 1A (Ambatari), 6A (Bhelwa), 7A (Purana Bhelwa), 6B (Bhelwa Mandal Tola), 12A (Tasariya), Panchayat- Bhorsar Bhelwa, Block- Katoria (06 No Scheme)
- ExpiredDesign, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps and Fluoride Treatment Plant Having Technology (Adsorption/nano Technology) by Csir or Certified by Csir or Any Other Technology Endorsed/ Approved by GOI. Construction of Water Supply Schemes in This Fluoride Affected Habitations/wards of Banka District of Bihar Will Be on Turn Key Basis with 06 Month Trial Run After Commissioning and Comprehensive Operation and Maintenanace of 60 Months Under Mukhyamantri Peyjal Nischay Yojana (Quality Affected) Under P.h.division Banka, Ward No- 10A (Patharchapti), 10B (Suggitand), 10C (Kothidinda), 10D (Baluaho) Panchayat- Bhorsar Bhelwa, Block- Katoria (04 No Scheme) for Year 2023-24.
- ExpiredComprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the Panchayati Raj Department and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :- Basghat Masuria, Bandhauli Bandhaura, Usri, Sirsa Manpur, Dharambari, Pyarepur, Katalpur, Dighwa South, Dighwa North, Gamahari, Faijullapur, Hamidpur, Bangra, Bakhari, Ajabi Nagar, Parsauni, Rewthith, Jagdishpur, Chamanpura, Hakam, Cheutaha, Khaira Azam, Bakhraur, Buchiya, Sher, Mohammadpur, Budhsi, Jalalpur, Lohijara, Kushahar, Supauli, Karash Ghat, Amarpura, Kashi Tengrahi, Dumariya, BLOCK :- Baikunthpur & Sidhawaliya having no. of scheme 269 & 163 respectively Total No. of Scheme-432 no. under P.H Division Gopalganj For the year 2024-25.
- ExpiredComprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the Panchayati Raj Department and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in PANCHAYAT :- Khadahi, Sisai, Gopalpur, Bagahwa Mishr, Chakarwa Khas, Koreya, Chhathiyan, Haradiya, Dumar Narendra, Jagardiri Bankata, Kalyanpur, Hussepur, Rakba, Lami Chaur, Domanpur, Jagtauli, Bhore, Belwa, Jagdishpur, Pagra, Khiridih, Sarupai, Ahiyapur, Musahari, Majhwalia, Baharpurwa, Kutiya, Nautan, Ghat Bandhaura, Chaumukha, BLOCK :- Bhore & Bijayipur having no. of scheme 245 & 184 respectively Total No. of Scheme-429 no. under P.H Division Gopalganj For the year 2024-25.
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Darauli and Guthani in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Raghunathpur in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Andar,Hussainganj and Ziradei in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Hasanpura and Siswan in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Pachrukhi and Siwan in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Daraundha and Maharajganj in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredConstruction of Toilets with septic tank and soak pit in various schools of Block - Barhariya and Goreyakothi in District Siwan by P.H. Division, Siwan in year 2024-25
- ExpiredDesign, construction, supply, Testing, Commissioning of water supply schemes with electric driven motor pumps and Iron removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Iron Affected left out Habitations/ Wards of Block- Bachhawara ; Panchayat-Dadopur, Ward-9B, 12B, 13B, 15B ; Panchayat- Chamtha-1, Ward no.-8B, 11B; Panchayat-Chiranjivipur, ward 8B; in District of Begusarai on turn-key basis with six (06) months trial- run after commissioning and comprehensive Operation and Maintenance of 60 Months after Successful completion of Trial Run Period Under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn-key basis under P.H. Division, Teghra.
- ExpiredDesign, construction, supply, Testing, Commissioning of water supply schemes with electric driven motor pumps and Iron removal treatment plant having technology (Adsorption/Ion exchange/membrane/Nano Technology etc.) of CSIR or certified by CSIR or any other technology endorsed/approved by GoI in the Iron Affected left out Habitations/ Wards of Block- Bachhawara ; Panchayat-Rani-3, Ward-9B ; Panchayat- Gobindpur-3, Ward no.-13B, 15B; Panchayat-Bhikhamchak, ward 5B; Panchayat-Rasidpur, ward-2B&4B; panchayat-Godhna, Ward 4B in District of Begusarai on turn-key basis with 06 months trial- run after commissioning and comprehensive Operation and Maintenance of 60 Months after Successful completion of Trial Run Period Under Mukhyamantri Nishchay (Quality Affected) Yojna on Turn-key basis under P.H. Division, Teghra.
- ExpiredOperation & Maintenance for Five Years of Dansar Rular Piped Water Supply Scheme (Block-jalagarh), Motkopa Eakal Garmin Jalapurti Yojna (Block-kasba), Singhiya Eakal Garmin Jalapurti Yojna (Block-srinager), Chandi Eakal Garmin Jalapurti Yojna (Block-purnea East), Khokha North Eakal Garmin Jalapurti Yojna (Block-srinager), District- Purnia Under P.h Division Purnea for the Year 2024-25.
- ExpiredConstruction of Toilet with Urinal and Septic Tank as per the Design in Different Schools of the District Katihar Under P.h.division, Katihar
- ExpiredConstruction of Toilet with Urinal and Septic Tank as per the Design in Different Schools of the District Katihar Under P.h.division, Katihar
- ExpiredConstruction of 2 unit Toilet Complex with staircase (1 unit at G.F. for Boys and 1 Unit F.F. for Girls)1 nos septic tank and electrification Flush charge with 1000 Ltr UPVC water Tank in block of District Araria Under P.H. Division, Foresganj for year 2024-25.
- ExpiredConstruction of 2 unit Toilet Complex with staircase (1 unit at G.F. for Boys and 1 Unit F.F. for Girls)1 nos septic tank and electrification Flush charge with 1000 Ltr UPVC water Tank in block of District Araria Under P.H. Division, Foresganj for year 2024-25.
- ExpiredName of Work : Construction of 18 Nos. of Toilet in different Government Schools in Block-Phulparas under P.H. Division, Jhanjharpur for the year 2024-25 in District-Madhubani.
- ExpiredConstruction of 2 unit Toilet Complex with staircase (1 unit at G.F. for Boys and 1 Unit F.F. for Girls)1 nos septic tank and electrification Flush charge with 1000 Ltr UPVC water Tank in block of District Araria Under P.H. Division, Foresganj for year 2024-25.
- ExpiredName of Work : Construction of 29 Nos. of Toilet in different Government Schools in Block-Laukahi under P.H. Division, Jhanjharpur for the year 2024-25 in District-Madhubani.
- ExpiredName of Work : Construction of 16 Nos. of Toilet in different Government Schools in Block-Madhepur under P.H. Division, Jhanjharpur for the year 2024-25 in District-Madhubani.
- ExpiredName of Work :Construction of 22 Nos. of Toilet in different Government Schools in Block-Jhanjharpur under P.H. Division, Jhanjharpur for the year 2024-25 in District-Madhubani.
- ExpiredConstruction of 2 unit Toilet Complex with staircase (1 unit at G.F. for Boys and 1 Unit F.F. for Girls)1 nos septic tank and electrification Flush charge with 1000 Ltr UPVC water Tank in block of District Araria Under P.H. Division, Foresganj for year 2024-25.
- Expiredcomprehensive operation and maintenance of ward level schemes for 60 months under HAR GHAR NAL-JAL Yojana in blocks Parbatta, Pnchayat:-Sourh South ward 1,3,Kabela ward,11,12 Block:- Mansi Panchayat:-AMNI Ward,2, Block:- Gogri panchayat Madarpur ward 01, and panchayat Jhitkiya ward 16 Including Electricity/Power Bills which will be borne by the agency based on the prevalent tariff excluding subsidies (if any) fixed by the Bihar electricity regulatory commission,applicable for the "HGNJ" project in P.H.Div-Khagaria
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps in the District of East Champran Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) Under P.H. Division, Motihari. [WARD NO-04, 05, 07 & 08 OF PANCHAYAT-KALYANPUR & BLOCK- KALYANPUR AND WARD NO-01 & 08 OF PANCHAYAT- KOTWA, BLOCK- KOTWA ]
- ExpiredComprehensive operation and maintenance and Special repair of Existing Kishanpur PWS (Ward 13, 14, 15), Amba PWS (Ward-12, 13, 14, 15), Jagdishpur PWS (Ward-2, 3, 4), Jagdishpur Mini PWS (Ward-1, 5, 6, 7) for 5 years
- ExpiredDesign, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having ground water quality issues; with Electric Driven Pumps in the District of East Champran Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) Under P.H. Division, Motihari. [WARD NO- 05 OF PANCHAYAT-DHEKAHAN SOUTH , BLOCK- PIPRAKOTHI & WARD NO-01,05 & 09 OF PANCHAYAT-DHEKAHAN NORTH, WARD NO- 02 OF PANCHAYAT-MADHUBANI GHAT , BLOCK- MOTIHARI ]
- ExpiredBOQ for Construction of Toilet in different Schools of Block- Bihariganj, Chausa & Udakishunganj (Qty of work 16) Disrtict Madhepura under P.H. Division Madhepura for year 2024-25.
- ExpiredBOQ for Construction of Toilet in different Schools of Block- Madhepura & Shankarpur (Qty of work 16) Disrtict Madhepura under P.H. Division Madhepura for year 2024-25.
- ExpiredDesign ,Construction,supplying,testing,commissioning of Incomplete Wards of Panchayati Raj Department Rural Piped Water Supply Scheme with Electric Driven Pumps on Turnkey Basis After Completion and Successful,commissioning with Three Months Trial Run for Non-quality Tola/ Habitation in Aurangabad District Under P.h. Division, Aurangabad.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Jehanabad Block in the District of Jehanabad for year 2024-25.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Ratni Faridpur Block in the District of Jehanabad for year 2024-25.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Makhdumpur and Jehanabad Block in the District of Jehanabad for year 2024-25.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Modanganj Block in the District of Jehanabad for year 2024-25.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Ghoshi Block in the District of Jehanabad for year 2024-25.
- ExpiredConstruction of toilet, running water facility with 100 mm X 90 M deep Boring, 01 HP Submersible motor pump, Hand Wash Station and repairing of existing toilet in different Govtt. School of Hulasganj and Modanganj Block in the District of Jehanabad for year 2024-25.
- ExpiredBOQ for Construction of Toilet in different Schools of Block- Kumarkhand & Alamnagar (Qty of work 18) Disrtict Madhepura under P.H. Division Madhepura for year 2024-25.
- ExpiredBOQ for Construction of Toilet in different Schools of Block- Singheshwar & Gamahariya (Qty of work 16) Disrtict Madhepura under P.H. Division Madhepura for year 2024-25.