Supply of portion and welding on 60kg/52kg/90R (New/SH,90/72 UTS) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-2012 with contractor's materials, labour, T&P etc. including welding supervisor complete between Saraigarh-Forbesganj section of Samastipur division of E.C. Railway
Estimate Cost
₹4.91 Cr
Sanctioned estimate
Tendered Cost
₹3.93 Cr
-20.0% vs estimate
Physical Progress
31%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsSupply of portion and welding on 60kg/52kg/90R (New/SH,90/72 UTS) rail joints by SKV process (25mm gap) on cess/in situ as per IRS specification T-19-2012 with contractor's materials, labour, T&P etc. including welding supervisor complete between Saraigarh-Forbesganj section of Samastipur division of E.C. Railway is an East Central Railway (ECR) infrastructure work in Bihar, executed by The India Thermit Corporation Ltd. The tendered cost of the work is ₹3.93 Cr, and it is currently Overdue with physical progress recorded at 31%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress
Frequently Asked Questions
- QWhat is the current status of the railway work "Supply of portion and welding on 60kg/52kg/90R (New/SH,90/72 UTS) rail joints by"?
- Status: Overdue (overdue). This East Central Railway work is being executed by The India Thermit Corporation Ltd. Physical progress stands at 31%. Current date of completion (DOC): 31-10-2025.
- QWho is the agency for this Bihar railway project?
- The agency for this work is The India Thermit Corporation Ltd. Acceptance / agreement reference: CAOP-C-HQ-ENGINEERING/ECR-CAO-C-N-ETN-84-19-20/00854630016056 Dtd 20/02/2020 ECR/CAO/Con/Wt/Agt/138 dated 12.11.2020. Work started on 08-06-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "Supply of portion and welding on 60kg/52kg/90R (New/SH,90/72" is ₹3.93 Cr (against an estimate of ₹4.91 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Supply of portion and welding on 60kg/52kg/90R (New/SH,90/72" is one of hundreds of railway works covered.