East Central RailwayIn Progress

Construction of Office cum Rest House, Station building, Passenger platform, yard drain, PP shelter, FOB and other ancillary works at NKE in connection with doubling of NKE–VKNR section.

Estimate Cost

₹26.31 Cr

Sanctioned estimate

Tendered Cost

₹25.84 Cr

-1.8% vs estimate

Physical Progress

35%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹25.84 Cr
Progress35%
Started19-09-2019
Target DOC30-06-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram, AEN/C/NKE

Work Details

5 Fields
Work No.
317
Agency
Lord Vishnu Constructions Private Limited
102A, Lotus Apartment, New Patliputra Colony, Patna-800013.
Acceptance / LOA
LOA No ECR/CAO/Con/North/ETN-52-19-20 dt. 12.09.2019
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Harinandan Ram, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹26.31 Cr
Tendered Cost
₹25.84 Cr
Physical Progress
35%
Date Started
19-09-2019
Original DOC
30-06-2026
Extended DOC
N/A

Construction of Office cum Rest House, Station building, Passenger platform, yard drain, PP shelter, FOB and other ancillary works at NKE in connection with doubling of NKE–VKNR section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by Lord Vishnu Constructions Private Limited. The tendered cost of the work is ₹25.84 Cr, and it is currently In Progress with physical progress recorded at 35%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of Office cum Rest House, Station building, Passenger platform, yar"?
Status: In Progress. This East Central Railway work is being executed by Lord Vishnu Constructions Private Limited. Physical progress stands at 35%. Current date of completion (DOC): 30-06-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Lord Vishnu Constructions Private Limited, 102A, Lotus Apartment, New Patliputra Colony, Patna-800013.. Acceptance / agreement reference: LOA No ECR/CAO/Con/North/ETN-52-19-20 dt. 12.09.2019. Work started on 19-09-2019.
QWhat is the cost of this railway work?
The tendered cost of "Construction of Office cum Rest House, Station building, Pas" is ₹25.84 Cr (against an estimate of ₹26.31 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Office cum Rest House, Station building, Pas" is one of hundreds of railway works covered.