Design, Supplying, Fabrication, assembling and launching of BOW string girder and its associated Road works for Railway protion in connection with Construction of ROB in lieu of LC-56 at Sitamarhi
Estimate Cost
₹8.61 Cr
Sanctioned estimate
Tendered Cost
₹7.75 Cr
-10.0% vs estimate
Physical Progress
45%
Work completed
Status
In Progress
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsDesign, Supplying, Fabrication, assembling and launching of BOW string girder and its associated Road works for Railway protion in connection with Construction of ROB in lieu of LC-56 at Sitamarhi is an East Central Railway (ECR) infrastructure work in Bihar, executed by Lord Vishnu Constructions Private Limited. The tendered cost of the work is ₹7.75 Cr, and it is currently In Progress with physical progress recorded at 45%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Work in progress.
Frequently Asked Questions
- QWhat is the current status of the railway work "Design, Supplying, Fabrication, assembling and launching of BOW string girder an"?
- Status: In Progress. This East Central Railway work is being executed by Lord Vishnu Constructions Private Limited. Physical progress stands at 45%. Current date of completion (DOC): 15-06-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is Lord Vishnu Constructions Private Limited, 102A, Lotus Apartment, New Patliputra Colony, Patna- 800013. Acceptance / agreement reference: LOA No. ECR/CAO/CON/N/ETN-31-21-22 dated 02.03.2022. ECR/CAO/CON/WT/Agt/198 dated 28.05.2022. Work started on 01-03-2023.
- QWhat is the cost of this railway work?
- The tendered cost of "Design, Supplying, Fabrication, assembling and launching of " is ₹7.75 Cr (against an estimate of ₹8.61 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Design, Supplying, Fabrication, assembling and launching of " is one of hundreds of railway works covered.