East Central RailwayIn Progress

Design, Supplying, Fabrication, assembling and launching of BOW string girder and its associated Road works for Railway portion in connection with Construction of ROB in lieu of LC-56 at Sitamarhi

Estimate Cost

₹8.61 Cr

Sanctioned estimate

Tendered Cost

₹7.75 Cr

-10.0% vs estimate

Physical Progress

45%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹7.75 Cr
Progress45%
Started01-03-2023
Target DOC31-08-2026
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE

Work Details

5 Fields
Work No.
328
Agency
Lord Vishnu Constructions Private Limited
102A, Lotus Apartment, New Patliputra Colony, Patna-800013
Acceptance / LOA
LOA No. ECR/CAO/CON/N/ETN-31-21-22 dated 02.03.2022; ECR/CAO/CON/WT/Agt/198 dated 28.05.2022
Officer in Charge
Vijay Kumar, CE/C/NE/MHX; Kumar Sanu Raj, Dy. CE/Con/SMI; Milan Kumar, AEN/C/NKE
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹8.61 Cr
Tendered Cost
₹7.75 Cr
Physical Progress
45%
Date Started
01-03-2023
Original DOC
31-08-2026
Extended DOC
N/A

Design, Supplying, Fabrication, assembling and launching of BOW string girder and its associated Road works for Railway portion in connection with Construction of ROB in lieu of LC-56 at Sitamarhi is an East Central Railway (ECR) infrastructure work in Bihar, executed by Lord Vishnu Constructions Private Limited. The tendered cost of the work is ₹7.75 Cr, and it is currently In Progress with physical progress recorded at 45%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Design, Supplying, Fabrication, assembling and launching of BOW string girder an"?
Status: In Progress. This East Central Railway work is being executed by Lord Vishnu Constructions Private Limited. Physical progress stands at 45%. Current date of completion (DOC): 31-08-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is Lord Vishnu Constructions Private Limited, 102A, Lotus Apartment, New Patliputra Colony, Patna-800013. Acceptance / agreement reference: LOA No. ECR/CAO/CON/N/ETN-31-21-22 dated 02.03.2022; ECR/CAO/CON/WT/Agt/198 dated 28.05.2022. Work started on 01-03-2023.
QWhat is the cost of this railway work?
The tendered cost of "Design, Supplying, Fabrication, assembling and launching of " is ₹7.75 Cr (against an estimate of ₹8.61 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Design, Supplying, Fabrication, assembling and launching of " is one of hundreds of railway works covered.