East Central RailwayOverdue

Construction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Bridge No. 97B (2x5.00+1x5.00m RCC Box), Bridge No. 98 (2x4.00m RCC Box) along with construction of permanent diversion, linking of track and supply, fabrication, erection, launching of OWG, between Km 41.4 to 42.6 in Jhanjharpur-Tamuria section in connection with gauge conversion of Sakri-Nirmali section of Samastipur Division

Estimate Cost

₹20.13 Cr

Sanctioned estimate

Tendered Cost

₹21.20 Cr

+5.3% vs estimate

Physical Progress

90%

Work completed

Status

Overdue

Past target DOC

East Central Railway — CAO (Con)Overdue
Tendered₹21.20 Cr
Progress90%
Started18-11-2020
Target DOC28-02-2026
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/IV/SPJ; Vinod Kumar, AXEN/Con/DBG

Work Details

5 Fields
Work No.
249
Agency
Dooars Construction Company-Jalpaiguri
Madari Road, Falakata, Jalpaiguri-735211 (WB)
Acceptance / LOA
LOA No. CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-27-20-21/00856460027886/2607 dt. 04.11.2020; CA No. ECR/CAO/Con/WT/Agt/155 dated 13.2.2021
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/IV/SPJ; Vinod Kumar, AXEN/Con/DBG
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹20.13 Cr
Tendered Cost
₹21.20 Cr
Physical Progress
90%
Date Started
18-11-2020
Original DOC
03-07-2021
Extended DOC
28-02-2026

Construction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Bridge No. 97B (2x5.00+1x5.00m RCC Box), Bridge No. 98 (2x4.00m RCC Box) along with construction of permanent diversion, linking of track and supply, fabrication, erection, launching of OWG, between Km 41.4 to 42.6 in Jhanjharpur-Tamuria section in connection with gauge conversion of Sakri-Nirmali section of Samastipur Division is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Dooars Construction Company-Jalpaiguri. The tendered cost of the work is ₹21.20 Cr, and it is currently Overdue with physical progress recorded at 90%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Br"?
Status: Overdue (overdue). This East Central Railway work is being executed by M/S Dooars Construction Company-Jalpaiguri. Physical progress stands at 90%. Current date of completion (DOC): 28-02-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is M/S Dooars Construction Company-Jalpaiguri, Madari Road, Falakata, Jalpaiguri-735211 (WB). Acceptance / agreement reference: LOA No. CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-27-20-21/00856460027886/2607 dt. 04.11.2020; CA No. ECR/CAO/Con/WT/Agt/155 dated 13.2.2021. Work started on 18-11-2020.
QWhat is the cost of this railway work?
The tendered cost of "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well " is ₹21.20 Cr (against an estimate of ₹20.13 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well " is one of hundreds of railway works covered.