Construction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Bridge No. 97B (2x5.00+1x5.00m RCC Box), Bridge No. 98 (2x4.00m RCC Box) along with construction of permanent diversion, linking of track and supply, fabrication, erection, launching of OWG, between Km 41.4 to 42.6 in Jhanjharpur-Tamuria section in connection with gauge conversion of Sakri-Nirmali section of Samastipur Division
Estimate Cost
₹20.13 Cr
Sanctioned estimate
Tendered Cost
₹21.20 Cr
+5.3% vs estimate
Physical Progress
90%
Work completed
Status
Overdue
Past target DOC
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsConstruction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Bridge No. 97B (2x5.00+1x5.00m RCC Box), Bridge No. 98 (2x4.00m RCC Box) along with construction of permanent diversion, linking of track and supply, fabrication, erection, launching of OWG, between Km 41.4 to 42.6 in Jhanjharpur-Tamuria section in connection with gauge conversion of Sakri-Nirmali section of Samastipur Division is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/S Dooars Construction Company-Jalpaiguri. The tendered cost of the work is ₹21.20 Cr, and it is currently Overdue with physical progress recorded at 90%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well foundation, Minor Br"?
- Status: Overdue (overdue). This East Central Railway work is being executed by M/S Dooars Construction Company-Jalpaiguri. Physical progress stands at 90%. Current date of completion (DOC): 28-02-2026.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/S Dooars Construction Company-Jalpaiguri, Madari Road, Falakata, Jalpaiguri-735211 (WB). Acceptance / agreement reference: LOA No. CAO-C-HQ-Engineering/ECR-CAO-C-N-ETN-27-20-21/00856460027886/2607 dt. 04.11.2020; CA No. ECR/CAO/Con/WT/Agt/155 dated 13.2.2021. Work started on 18-11-2020.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well " is ₹21.20 Cr (against an estimate of ₹20.13 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Major Bridge No. 97A (2x30.5m, OWG) on well " is one of hundreds of railway works covered.