Linking BG track manually, Linking level crossing, Unloading and spreading of stone ballast, leading and unloading 52 kg/60kg rails and PSC sleepers, spreding of PSC sleepers, linking and packing of BG track, PG Pts. & Xings etc. from SPJ (Excl.) to DBG (excl.) in connection with doubling of Samastipur-Darbhanga section.
Estimate Cost
₹11.94 Cr
Sanctioned estimate
Tendered Cost
₹12.04 Cr
+0.8% vs estimate
Physical Progress
65%
Work completed
Status
Final Bill / Closure
Current stage
Work Details
5 FieldsCost, Progress & Timeline
6 FieldsLinking BG track manually, Linking level crossing, Unloading and spreading of stone ballast, leading and unloading 52 kg/60kg rails and PSC sleepers, spreding of PSC sleepers, linking and packing of BG track, PG Pts. & Xings etc. from SPJ (Excl.) to DBG (excl.) in connection with doubling of Samastipur-Darbhanga section. is an East Central Railway (ECR) infrastructure work in Bihar, executed by J.S.& Co. At & PO-Bihat. The tendered cost of the work is ₹12.04 Cr, and it is currently Final Bill / Closure with physical progress recorded at 65%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
Remarks
Final bill under process.
Frequently Asked Questions
- QWhat is the current status of the railway work "Linking BG track manually, Linking level crossing, Unloading and spreading of st"?
- Status: Final Bill / Closure. This East Central Railway work is being executed by J.S.& Co. At & PO-Bihat. Physical progress stands at 65%. Current date of completion (DOC): 22-12-2023.
- QWho is the agency for this Bihar railway project?
- The agency for this work is J.S.& Co. At & PO-Bihat, Ratan Chowk, Begusarai. Acceptance / agreement reference: ECR/CAO/C/N/ETN-37-17-18 Dt 23.12.17 ** ECR/CAO/Con/WT/Agt/45 dt.23.3.2018. Work started on 30-12-2017.
- QWhat is the cost of this railway work?
- The tendered cost of "Linking BG track manually, Linking level crossing, Unloading" is ₹12.04 Cr (against an estimate of ₹11.94 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Linking BG track manually, Linking level crossing, Unloading" is one of hundreds of railway works covered.