Short Term Improvement and Routine Maintenance for the work of Four laning of Chhapra-Hazipur section except 2 laning of Chhapra Bypass of NH-19 from Km 143.200 to Km 209.940 of NH-19 in the State of Bihar under NHDP phase-III on BOT (Annuity) on DBFOT basis(2nd Call).
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹14 Cr
Contract value
Length
66.74 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under Construction (AD issued)
Due Date
18-12-2022
Likely Date
31-05-2023
Completion
0.0%
Physical Done
Project Timeline
Awarded
19-09-2022
Construction Started
19-09-2022
In Progress
Near Completion
-
Completed
31-05-2023
Physical vs Financial Progress
Project Details
UPC
N/08055/02002/BR
National Highway
31
Regional Office
RO-Patna
State
Bihar
Mode
Item Rate
Length
66.74 km
Contractor
Vinay Construction
Project Stage
Under Construction (AD issued)
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹13.61 Cr
Capital Cost
N/A
Start Date
19-09-2022
PCOD Date
-
Scheduled Completion
18-12-2022
Likely Completion
31-05-2023
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:43:30
Contractor Profile
Vinay Construction
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 66.74 km on 31, improving regional connectivity.
Short Term Improvement and Routine Maintenance for the work of Four laning of Chhapra-Hazipur section except 2 laning of Chhapra Bypass of NH-19 from Km 143.200 to Km 209.940 of NH-19 in the State of Bihar under NHDP phase-III on BOT (Annuity) on DBFOT basis(2nd Call). is a National Highways Authority of India (NHAI) project on 31 in Bihar. The project has an awarded cost of ₹13.61 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Short Term Improvement and Routine Maintenance for the work of Four laning of Ch"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 18-12-2022. Likely completion: 31-05-2023.
- QWho is the contractor for this NHAI highway project?
- The contractor for Short Term Improvement and Routine Maintenance for the work of Four laning of Chhapra-Hazipur section except 2 laning of Chhapra Bypass of NH-19 from Km 143.200 to Km 209.940 of NH-19 in the State of Bihar under NHDP phase-III on BOT (Annuity) on DBFOT basis(2nd Call). is Vinay Construction. The project is under RO-Patna and covers 66.74 km on 31.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹13.61 Crore. The project is on 31 in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/08055/02002/BR in NHAI?
- UPC (Unique Project Code) N/08055/02002/BR refers to "Short Term Improvement and Routine Maintenance for the work of Four laning of Chhapra-Hazipur section except 2 laning of Chhapra Bypass of NH-19 from Km 143.200 to Km 209.940 of NH-19 in the State of Bihar under NHDP phase-III on BOT (Annuity) on DBFOT basis(2nd Call). " — a National Highway project on 31 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.