Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹4 Cr
Contract value
Length
66.74 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under O&M through OMT/TOT/O&M Agency at Site
Due Date
10-11-2025
Likely Date
-
Completion
0.0%
Physical Done
Project Timeline
Awarded
11-07-2025
Construction Started
11-07-2025
In Progress
Near Completion
-
Completed
-
Physical vs Financial Progress
Project Details
UPC
N/08055/02006/BR
National Highway
31
Regional Office
RO-Patna
State
Bihar
Mode
Item Rate
Length
66.74 km
Contractor
Descon Infrastructure Pvt. Ltd.
Project Stage
Under O&M through OMT/TOT/O&M Agency at Site
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹3.59 Cr
Capital Cost
N/A
Start Date
11-07-2025
PCOD Date
-
Scheduled Completion
10-11-2025
Likely Completion
-
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:42:50
Contractor Profile
Descon Infrastructure Pvt. Ltd.
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 66.74 km on 31, improving regional connectivity.
Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182 is a National Highways Authority of India (NHAI) project on 31 in Bihar. The project has an awarded cost of ₹3.59 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Maintenance work including safety features, Road Signages, Road Markings, Studs,"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under O&M through OMT/TOT/O&M Agency at Site. On schedule. Scheduled completion: 10-11-2025. Likely completion: -.
- QWho is the contractor for this NHAI highway project?
- The contractor for Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182 is Descon Infrastructure Pvt. Ltd.. The project is under RO-Patna and covers 66.74 km on 31.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹3.59 Crore. The project is on 31 in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/08055/02006/BR in NHAI?
- UPC (Unique Project Code) N/08055/02006/BR refers to "Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182" — a National Highway project on 31 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.