31Item Rate

Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182

UPC: N/08055/02006/BR

Physical Progress

0.0%

Drone-monitored

Financial Progress

0.0%

Of awarded cost

Awarded Cost

₹4 Cr

Contract value

Length

66.74 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

N/A

Aerial captures

Project Progress

Physical Progress0.0%
Financial Progress0.0%

Stage

Under O&M through OMT/TOT/O&M Agency at Site

Due Date

10-11-2025

Likely Date

-

Completion

0.0%

Physical Done

DoneRemaining

Project Timeline

Awarded

11-07-2025

Construction Started

11-07-2025

In Progress

Near Completion

-

Completed

-

Physical vs Financial Progress

Project Details

UPC

N/08055/02006/BR

National Highway

31

Regional Office

RO-Patna

State

Bihar

Mode

Item Rate

Length

66.74 km

Contractor

Descon Infrastructure Pvt. Ltd.

Project Stage

Under O&M through OMT/TOT/O&M Agency at Site

Drone Frames

N/A

Last Flight

N/A

Cost & Timeline

Awarded Cost

₹3.59 Cr

Capital Cost

N/A

Start Date

11-07-2025

PCOD Date

-

Scheduled Completion

10-11-2025

Likely Completion

-

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-09-20 21:42:50

Contractor Profile

Descon Infrastructure Pvt. Ltd.

RO-Patna31Item Rate

Project Intelligence

1

Physical progress stands at 0.0%. Financial utilization at 0.0%.

2

Project is on schedule or ahead of planned completion date.

3

Covers 66.74 km on 31, improving regional connectivity.

Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182 is a National Highways Authority of India (NHAI) project on 31 in Bihar. The project has an awarded cost of ₹3.59 Cr and is currently ongoing with physical progress at 0.0%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

?

Frequently Asked Questions

QWhat is the current status of the NHAI project "Maintenance work including safety features, Road Signages, Road Markings, Studs,"?
Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under O&M through OMT/TOT/O&M Agency at Site. On schedule. Scheduled completion: 10-11-2025. Likely completion: -.
QWho is the contractor for this NHAI highway project?
The contractor for Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182 is Descon Infrastructure Pvt. Ltd.. The project is under RO-Patna and covers 66.74 km on 31.
QWhat is the cost of this NHAI highway project?
The awarded cost is ₹3.59 Crore. The project is on 31 in Bihar, monitored via drone surveillance by NHAI.
QWhat is UPC N/08055/02006/BR in NHAI?
UPC (Unique Project Code) N/08055/02006/BR refers to "Maintenance work including safety features, Road Signages, Road Markings, Studs, pot holes of Chhapra -Hajipur section of NH-19 from km l43.200 to 209.940 and Balance Work of ROB at Ch.177.182" — a National Highway project on 31 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.