Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode
Physical Progress
0.0%
Drone-monitored
Financial Progress
0.0%
Of awarded cost
Awarded Cost
₹52 Cr
Contract value
Length
1.225 km
Road stretch
Schedule
On Track
On schedule
Drone Frames
N/A
Aerial captures
Project Progress
Stage
Under Construction (AD issued)
Due Date
22-01-2028
Likely Date
22-01-2028
Completion
0.0%
Physical Done
Project Timeline
Awarded
01-04-2026
Construction Started
01-04-2026
In Progress
Near Completion
-
Completed
22-01-2028
Physical vs Financial Progress
Project Details
UPC
N/08017/04003/BR
National Highway
31
Regional Office
RO-Patna
State
Bihar
Mode
EPC
Length
1.225 km
Contractor
Hari Construction and Associates Pvt. Ltd
Project Stage
Under Construction (AD issued)
Drone Frames
N/A
Last Flight
N/A
Cost & Timeline
Awarded Cost
₹52.41 Cr
Capital Cost
N/A
Start Date
01-04-2026
PCOD Date
-
Scheduled Completion
22-01-2028
Likely Completion
22-01-2028
Schedule Status
On schedule
Slippage Days
N/A
Data Updated
2026-09-20 21:42:47
Contractor Profile
Hari Construction and Associates Pvt. Ltd
Project Intelligence
Physical progress stands at 0.0%. Financial utilization at 0.0%.
Project is on schedule or ahead of planned completion date.
Covers 1.225 km on 31, improving regional connectivity.
Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode is a National Highways Authority of India (NHAI) project on 31 in Bihar. The project has an awarded cost of ₹52.41 Cr and is currently ongoing with physical progress at 0.0%.
NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.
Frequently Asked Questions
- QWhat is the current status of the NHAI project "Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.4"?
- Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 22-01-2028. Likely completion: 22-01-2028.
- QWho is the contractor for this NHAI highway project?
- The contractor for Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode is Hari Construction and Associates Pvt. Ltd. The project is under RO-Patna and covers 1.225 km on 31.
- QWhat is the cost of this NHAI highway project?
- The awarded cost is ₹52.41 Crore. The project is on 31 in Bihar, monitored via drone surveillance by NHAI.
- QWhat is UPC N/08017/04003/BR in NHAI?
- UPC (Unique Project Code) N/08017/04003/BR refers to "Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode" — a National Highway project on 31 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.