All NHAI Projects
31EPC

Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode

UPC: N/08017/04003/BR

Physical Progress

0.0%

Drone-monitored

Financial Progress

0.0%

Of awarded cost

Awarded Cost

₹52 Cr

Contract value

Length

1.225 km

Road stretch

Schedule

On Track

On schedule

Drone Frames

N/A

Aerial captures

Project Progress

Physical Progress0.0%
Financial Progress0.0%

Stage

Under Construction (AD issued)

Due Date

22-01-2028

Likely Date

22-01-2028

Completion

0.0%

Physical Done

DoneRemaining

Project Timeline

Awarded

01-04-2026

Construction Started

01-04-2026

In Progress

Near Completion

-

Completed

22-01-2028

Physical vs Financial Progress

Project Details

UPC

N/08017/04003/BR

National Highway

31

Regional Office

RO-Patna

State

Bihar

Mode

EPC

Length

1.225 km

Contractor

Hari Construction and Associates Pvt. Ltd

Project Stage

Under Construction (AD issued)

Drone Frames

N/A

Last Flight

N/A

Cost & Timeline

Awarded Cost

₹52.41 Cr

Capital Cost

N/A

Start Date

01-04-2026

PCOD Date

-

Scheduled Completion

22-01-2028

Likely Completion

22-01-2028

Schedule Status

On schedule

Slippage Days

N/A

Data Updated

2026-09-20 21:42:47

Contractor Profile

Hari Construction and Associates Pvt. Ltd

RO-Patna31EPC

Project Intelligence

1

Physical progress stands at 0.0%. Financial utilization at 0.0%.

2

Project is on schedule or ahead of planned completion date.

3

Covers 1.225 km on 31, improving regional connectivity.

Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode is a National Highways Authority of India (NHAI) project on 31 in Bihar. The project has an awarded cost of ₹52.41 Cr and is currently ongoing with physical progress at 0.0%.

NHAI tracks physical progress on this project through periodic drone surveys, providing an independent view of on-ground construction status. Other projects on the same highway are listed below.

?

Frequently Asked Questions

QWhat is the current status of the NHAI project "Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.4"?
Current physical progress: 0.0%. Financial progress: 0.0%. Project stage: Under Construction (AD issued). On schedule. Scheduled completion: 22-01-2028. Likely completion: 22-01-2028.
QWho is the contractor for this NHAI highway project?
The contractor for Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode is Hari Construction and Associates Pvt. Ltd. The project is under RO-Patna and covers 1.225 km on 31.
QWhat is the cost of this NHAI highway project?
The awarded cost is ₹52.41 Crore. The project is on 31 in Bihar, monitored via drone surveillance by NHAI.
QWhat is UPC N/08017/04003/BR in NHAI?
UPC (Unique Project Code) N/08017/04003/BR refers to "Construction of Four lane Elevated Flyover at Bihat Chandni chowk from Km. 209.450 to Km. 210.675 (Total Length= 1.225 Km) of NH31 for permanent rectification of MORTH Identified Blackspot over Simaria-Khagaria Section of NH-31 from Km. 206.050 to 266.282 in the state of Bihar on EPC mode" — a National Highway project on 31 in Bihar. NHAI uses UPCs to track drone monitoring progress and physical completion of highway construction.