Aviation & Aviation InfrastructureIPM · Central Project#612793

Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance.

Ministry of Civil AviationSikkim
Revised Cost: ₹323 CrUtilization: 27.1%

Original Cost

₹323 Cr

Baseline estimate

On budget

Revised Cost

₹323 Cr

Latest approved cost

Expenditure

₹88 Cr

Spent to date

Utilization

27.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹235 Cr

Budget left

Budget Utilization

27.1%
0%25%50%75%100%

Spent

₹88 Cr

Remaining

₹235 Cr

Total

₹323 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/06/2026

Revised Completion

30/06/2027

Completed

Project Details

Project Code612793
SectorAviation & Aviation Infrastructure
MinistryMinistry of Civil Aviation
StateSikkim
Data Month2026-08

Financial Summary

Original Cost₹323 Cr
Revised Cost₹323 Cr
Expenditure₹88 Cr
Original End Date02/06/2026
Revised Date30/06/2027

Project Intelligence

Project is within original budget of ₹323 Cr — no cost escalation recorded.

Expenditure stands at ₹88 Cr, which is 27.1% of the revised project cost.

Remaining budget: ₹235 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Aviation & Aviation Infrastructure. Ministry: Ministry of Civil Aviation.

Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. is a centrally-funded infrastructure project under Ministry of Civil Aviation, in the Aviation & Aviation Infrastructure sector. The original approved cost is ₹323.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope"?
Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. is a centrally-funded infrastructure project under the Ministry of Civil Aviation, tracked through the Investment Project Monitoring (IPM) system. Sector: Aviation & Aviation Infrastructure. State: Sikkim. Original cost: ₹323 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹323 Cr has not been significantly revised. Expenditure: ₹88 Cr (27.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Widening of basic strip at Western Side of Runway Chainage 8 is under the Ministry of Civil Aviation in the Aviation & Aviation Infrastructure sector. Project code: 612793. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of basic strip at Western Side of Runway Chainage 8 is one of several Bihar projects tracked under the Aviation & Aviation Infrastructure sector on the IPM system.