Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance.
Original Cost
₹323 Cr
Baseline estimate
Revised Cost
₹323 Cr
Latest approved cost
Expenditure
₹88 Cr
Spent to date
Utilization
27.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹235 Cr
Budget left
Budget Utilization
27.1%Spent
₹88 Cr
Remaining
₹235 Cr
Total
₹323 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/06/2026
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹323 Cr — no cost escalation recorded.
Expenditure stands at ₹88 Cr, which is 27.1% of the revised project cost.
Remaining budget: ₹235 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Aviation & Aviation Infrastructure. Ministry: Ministry of Civil Aviation.
Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. is a centrally-funded infrastructure project under Ministry of Civil Aviation, in the Aviation & Aviation Infrastructure sector. The original approved cost is ₹323.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope"?
- Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. is a centrally-funded infrastructure project under the Ministry of Civil Aviation, tracked through the Investment Project Monitoring (IPM) system. Sector: Aviation & Aviation Infrastructure. State: Sikkim. Original cost: ₹323 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹323 Cr has not been significantly revised. Expenditure: ₹88 Cr (27.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Widening of basic strip at Western Side of Runway Chainage 8 is under the Ministry of Civil Aviation in the Aviation & Aviation Infrastructure sector. Project code: 612793. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of basic strip at Western Side of Runway Chainage 8 is one of several Bihar projects tracked under the Aviation & Aviation Infrastructure sector on the IPM system.