Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Widening of basic strip at Western Side of Runway
Aviation & Aviation InfrastructureIPM · Central Project#612793

Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance.

Ministry of Civil AviationSikkimData: 2026-05
Revised Cost: ₹323 CrUtilization: 25.1%

Original Cost

₹323 Cr

Baseline estimate

On Budget

Revised Cost

₹323 Cr

Latest approved cost

Expenditure

₹81 Cr

Spent to date

Utilization

25.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹242 Cr

Budget left

Budget Utilization

25.1%
0%25%50%75%100%

Spent

₹81 Cr

Remaining

₹242 Cr

Total

₹323 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/06/2026

Revised Completion

30/06/2027

Completed

Project Details

Project Code612793
SectorAviation & Aviation Infrastructure
MinistryMinistry of Civil Aviation
StateSikkim
Data Month2026-05

Financial & Timeline

Original Cost₹323 Cr
Revised Cost₹323 Cr
Expenditure₹81 Cr
Original End Date02/06/2026
Revised Date30/06/2027

Project Intelligence

Project is within original budget of ₹323 Cr — no cost escalation recorded.

Expenditure stands at ₹81 Cr, which is 25.1% of the revised project cost.

Remaining budget: ₹242 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Aviation & Aviation Infrastructure. Ministry: Ministry of Civil Aviation.

Frequently Asked Questions

What is IPM project "Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope"?
Widening of basic strip at Western Side of Runway Chainage 80m to 920m i/c slope stabilization Measures [Balance work] of uphill and Improvement of Storm Water Drainage System at Pakyong Airport, Sikkim on design & build basis [EPC] with integrated 10 years maintenance. is a centrally-funded infrastructure project under the Ministry of Civil Aviation, tracked through the Investment Project Monitoring (IPM) system. Sector: Aviation & Aviation Infrastructure. State: Sikkim. Original cost: ₹323 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹323 Cr has not been significantly revised. Expenditure: ₹81 Cr (25.1% of cost). Data as of 2026-05.
Which ministry is responsible for this project?
Widening of basic strip at Western Side of Runway Chainage 8 is under the Ministry of Civil Aviation in the Aviation & Aviation Infrastructure sector. Project code: 612793. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Widening of basic strip at Western Side of Runway Chainage 8 is one of several Bihar projects tracked under the Aviation & Aviation Infrastructure sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview