Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs for Runway 12-30, Extension of parallel Taxi Track-R with link Taxi- track and Link Taxi-Track-K1 at Chennai Airport
Original Cost
₹480 Cr
Baseline estimate
Revised Cost
₹480 Cr
Latest approved cost
Expenditure
₹10 Cr
Spent to date
Utilization
2.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹470 Cr
Budget left
Budget Utilization
2.0%Spent
₹10 Cr
Remaining
₹470 Cr
Total
₹480 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/01/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹480 Cr — no cost escalation recorded.
Expenditure stands at ₹10 Cr, which is 2.0% of the revised project cost.
Remaining budget: ₹470 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Aviation & Aviation Infrastructure. Ministry: Ministry of Civil Aviation.
Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs for Runway 12-30, Extension of parallel Taxi Track-R with link Taxi- track and Link Taxi-Track-K1 at Chennai Airport is a centrally-funded infrastructure project under Ministry of Civil Aviation, in the Aviation & Aviation Infrastructure sector. The original approved cost is ₹480.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs for Runway 12-30, Exte"?
- Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs for Runway 12-30, Extension of parallel Taxi Track-R with link Taxi- track and Link Taxi-Track-K1 at Chennai Airport is a centrally-funded infrastructure project under the Ministry of Civil Aviation, tracked through the Investment Project Monitoring (IPM) system. Sector: Aviation & Aviation Infrastructure. State: Tamil Nadu. Original cost: ₹480 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹480 Cr has not been significantly revised. Expenditure: ₹10 Cr (2.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs fo is under the Ministry of Civil Aviation in the Aviation & Aviation Infrastructure sector. Project code: 432726. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 8 Nos. RETs for Runway 07-25, 3 nos. RETs fo is one of several Bihar projects tracked under the Aviation & Aviation Infrastructure sector on the IPM system.