Transmission System under ISTS for evacuation of Power from Kudankulam Unit-3&4 [2x1000 MW] [SPV Name POWERGRID Kudankulam Tarnsmission Limited]
Original Cost
₹548 Cr
Baseline estimate
Revised Cost
₹548 Cr
Latest approved cost
Expenditure
₹219 Cr
Spent to date
Utilization
40.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹329 Cr
Budget left
Budget Utilization
40.0%Spent
₹219 Cr
Remaining
₹329 Cr
Total
₹548 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹548 Cr — no cost escalation recorded.
Expenditure stands at ₹219 Cr, which is 40.0% of the revised project cost.
Remaining budget: ₹329 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Transmission System under ISTS for evacuation of Power from Kudankulam Unit-3&4 [2x1000 MW] [SPV Name POWERGRID Kudankulam Tarnsmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹548.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Transmission System under ISTS for evacuation of Power from Kudankulam Unit-3&4 "?
- Transmission System under ISTS for evacuation of Power from Kudankulam Unit-3&4 [2x1000 MW] [SPV Name POWERGRID Kudankulam Tarnsmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Tamil Nadu. Original cost: ₹548 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹548 Cr has not been significantly revised. Expenditure: ₹219 Cr (40.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Transmission System under ISTS for evacuation of Power from is under the Ministry of Power in the Transmission & Distribution sector. Project code: 616671. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System under ISTS for evacuation of Power from is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.