Transmission & DistributionIPM · Central Project#994914

Transmission system strengthening at Tumkur-II for integration of additional RE potential (2.7 GW)

Ministry of PowerKarnataka
Revised Cost: ₹1221 CrUtilization: 2.0%

Original Cost

₹1221 Cr

Baseline estimate

On budget

Revised Cost

₹1221 Cr

Latest approved cost

Expenditure

₹24 Cr

Spent to date

Utilization

2.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1197 Cr

Budget left

Budget Utilization

2.0%
0%25%50%75%100%

Spent

₹24 Cr

Remaining

₹1197 Cr

Total

₹1221 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/05/2029

Revised Completion

Completed

Project Details

Project Code994914
SectorTransmission & Distribution
MinistryMinistry of Power
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹1221 Cr
Revised Cost₹1221 Cr
Expenditure₹24 Cr
Original End Date29/05/2029
Revised DateN/A

Project Intelligence

Project is within original budget of ₹1221 Cr — no cost escalation recorded.

Expenditure stands at ₹24 Cr, which is 2.0% of the revised project cost.

Remaining budget: ₹1197 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission system strengthening at Tumkur-II for integration of additional RE potential (2.7 GW) is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹1221.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission system strengthening at Tumkur-II for integration of additional RE "?
Transmission system strengthening at Tumkur-II for integration of additional RE potential (2.7 GW) is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Karnataka. Original cost: ₹1221 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹1221 Cr has not been significantly revised. Expenditure: ₹24 Cr (2.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Transmission system strengthening at Tumkur-II for integrati is under the Ministry of Power in the Transmission & Distribution sector. Project code: 994914. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission system strengthening at Tumkur-II for integrati is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.