Transmission & DistributionIPM · Central Project#615346

Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part C [SPV Name POWERGRID Mandsaur Transmission Limited]

Ministry of PowerMadhya Pradesh
Revised Cost: ₹2708 CrUtilization: 65.0%

Original Cost

₹2708 Cr

Baseline estimate

On budget

Revised Cost

₹2708 Cr

Latest approved cost

Expenditure

₹1760 Cr

Spent to date

Utilization

65.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹948 Cr

Budget left

Budget Utilization

65.0%
0%25%50%75%100%

Spent

₹1760 Cr

Remaining

₹948 Cr

Total

₹2708 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/08/2026

Revised Completion

28/02/2027

Completed

Project Details

Project Code615346
SectorTransmission & Distribution
MinistryMinistry of Power
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹2708 Cr
Revised Cost₹2708 Cr
Expenditure₹1760 Cr
Original End Date18/08/2026
Revised Date28/02/2027

Project Intelligence

Project is within original budget of ₹2708 Cr — no cost escalation recorded.

Expenditure stands at ₹1760 Cr, which is 65.0% of the revised project cost.

Remaining budget: ₹948 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part C [SPV Name POWERGRID Mandsaur Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹2708.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5"?
Transmission System for Evacuation of Power from Rajasthan REZ Ph-IV [Part-2 5.5 GW] [Jaisalmer/Barmer Complex] Part C [SPV Name POWERGRID Mandsaur Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Madhya Pradesh. Original cost: ₹2708 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2708 Cr has not been significantly revised. Expenditure: ₹1760 Cr (65.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Transmission System for Evacuation of Power from Rajasthan R is under the Ministry of Power in the Transmission & Distribution sector. Project code: 615346. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for Evacuation of Power from Rajasthan R is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.