Transmission & DistributionIPM · Central Project#615347

TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV Name POWERGRID West Central Transmission Limited]

Ministry of PowerMaharashtra
Revised Cost: ₹24.8K CrUtilization: 12.8%

Original Cost

₹24.8K Cr

Baseline estimate

On budget

Revised Cost

₹24.8K Cr

Latest approved cost

Expenditure

₹3167 Cr

Spent to date

Utilization

12.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹21.7K Cr

Budget left

Budget Utilization

12.8%
0%25%50%75%100%

Spent

₹3167 Cr

Remaining

₹21.7K Cr

Total

₹24.8K Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/05/2029

Revised Completion

Completed

Project Details

Project Code615347
SectorTransmission & Distribution
MinistryMinistry of Power
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹24.8K Cr
Revised Cost₹24.8K Cr
Expenditure₹3167 Cr
Original End Date18/05/2029
Revised DateN/A

Project Intelligence

Mega infrastructure project worth ₹24.8K Cr — among the largest central projects in Maharashtra.

Project is within original budget of ₹24.8K Cr — no cost escalation recorded.

Expenditure stands at ₹3167 Cr, which is 12.8% of the revised project cost.

Remaining budget: ₹21.7K Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV Name POWERGRID West Central Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹24819.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE"?
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL RENEWABLE ENERGY ZONE IN KHAVDA AREA OF GUJARAT UNDER PHASE-V [8 GW] PART A [SPV Name POWERGRID West Central Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Maharashtra. Original cost: ₹24819 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹24819 Cr has not been significantly revised. Expenditure: ₹3167 Cr (12.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL R is under the Ministry of Power in the Transmission & Distribution sector. Project code: 615347. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. TRANSMISSION SYSTEM FOR EVACUATION OF POWER FROM POTENTIAL R is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.