Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda area of Gujarat under Phase-IV [7GW] Part B [SPV Name POWERGRID South Olpad Transmission Limited]
Original Cost
₹4766 Cr
Baseline estimate
Revised Cost
₹4766 Cr
Latest approved cost
Expenditure
₹2240 Cr
Spent to date
Utilization
47.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹2526 Cr
Budget left
Budget Utilization
47.0%Spent
₹2240 Cr
Remaining
₹2526 Cr
Total
₹4766 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/10/2026
Revised Completion
31/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹4766 Cr — no cost escalation recorded.
Expenditure stands at ₹2240 Cr, which is 47.0% of the revised project cost.
Remaining budget: ₹2526 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda area of Gujarat under Phase-IV [7GW] Part B [SPV Name POWERGRID South Olpad Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹4766.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Transmission System for Evacuation of Power from Potential Renewable Energy Zone"?
- Transmission System for Evacuation of Power from Potential Renewable Energy Zone in Khavda area of Gujarat under Phase-IV [7GW] Part B [SPV Name POWERGRID South Olpad Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹4766 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹4766 Cr has not been significantly revised. Expenditure: ₹2240 Cr (47.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Transmission System for Evacuation of Power from Potential R is under the Ministry of Power in the Transmission & Distribution sector. Project code: 615345. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for Evacuation of Power from Potential R is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.