Transmission & DistributionIPM · Central Project#612151

Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3

Ministry of PowerGujarat
Revised Cost: ₹334 CrUtilization: 98.0%

Original Cost

₹334 Cr

Baseline estimate

On budget

Revised Cost

₹334 Cr

Latest approved cost

Expenditure

₹327 Cr

Spent to date

Utilization

98.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹7 Cr

Budget left

Budget Utilization

98.0%
0%25%50%75%100%

Spent

₹327 Cr

Remaining

₹7 Cr

Total

₹334 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/07/2025

Revised Completion

30/04/2026

Completed

Project Details

Project Code612151
SectorTransmission & Distribution
MinistryMinistry of Power
StateGujarat
Data Month2026-03

Financial Summary

Original Cost₹334 Cr
Revised Cost₹334 Cr
Expenditure₹327 Cr
Original End Date31/07/2025
Revised Date30/04/2026

Project Intelligence

Project is within original budget of ₹334 Cr — no cost escalation recorded.

Expenditure stands at ₹327 Cr, which is 98.0% of the revised project cost.

Remaining budget: ₹7 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3 is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹334.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission System for Evacuation of Power from potential Renewable Energy zone"?
Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3 is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹334 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹334 Cr has not been significantly revised. Expenditure: ₹327 Cr (98.0% of cost). Data as of 2026-03.
QWhich ministry is responsible for this project?
Transmission System for Evacuation of Power from potential R is under the Ministry of Power in the Transmission & Distribution sector. Project code: 612151. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for Evacuation of Power from potential R is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.