Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Transmission System for Evacuation of Power from p
Transmission & DistributionIPM · Central Project#612151

Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3

Ministry of PowerGujaratData: 2026-03
Revised Cost: ₹334 CrUtilization: 98.0%

Original Cost

₹334 Cr

Baseline estimate

On Budget

Revised Cost

₹334 Cr

Latest approved cost

Expenditure

₹327 Cr

Spent to date

Utilization

98.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹7 Cr

Budget left

Budget Utilization

98.0%
0%25%50%75%100%

Spent

₹327 Cr

Remaining

₹7 Cr

Total

₹334 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/07/2025

Revised Completion

30/04/2026

Completed

Project Details

Project Code612151
SectorTransmission & Distribution
MinistryMinistry of Power
StateGujarat
Data Month2026-03

Financial & Timeline

Original Cost₹334 Cr
Revised Cost₹334 Cr
Expenditure₹327 Cr
Original End Date31/07/2025
Revised Date30/04/2026

Project Intelligence

Project is within original budget of ₹334 Cr — no cost escalation recorded.

Expenditure stands at ₹327 Cr, which is 98.0% of the revised project cost.

Remaining budget: ₹7 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Frequently Asked Questions

What is IPM project "Transmission System for Evacuation of Power from potential Renewable Energy zone"?
Transmission System for Evacuation of Power from potential Renewable Energy zone in Khavda Area of Gujarat under Phase IV [7 GW] Part E3 is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹334 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹334 Cr has not been significantly revised. Expenditure: ₹327 Cr (98.0% of cost). Data as of 2026-03.
Which ministry is responsible for this project?
Transmission System for Evacuation of Power from potential R is under the Ministry of Power in the Transmission & Distribution sector. Project code: 612151. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for Evacuation of Power from potential R is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview