Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs - LTA System
Original Cost
₹318 Cr
Baseline estimate
Revised Cost
₹318 Cr
Latest approved cost
Expenditure
₹317 Cr
Spent to date
Utilization
99.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1 Cr
Budget left
Budget Utilization
99.7%Spent
₹317 Cr
Remaining
₹1 Cr
Total
₹318 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/04/2025
Revised Completion
30/11/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹318 Cr — no cost escalation recorded.
Expenditure stands at ₹317 Cr, which is 99.7% of the revised project cost.
Remaining budget: ₹1 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs - LTA System is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹318.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley H"?
- Transmission system for evacuation of Power from Pakaldul HEP in Chenab Valley HEPs - LTA System is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Jammu & Kashmir. Original cost: ₹318 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹318 Cr has not been significantly revised. Expenditure: ₹317 Cr (99.7% of cost). Data as of 2025-10.
- QWhich ministry is responsible for this project?
- Transmission system for evacuation of Power from Pakaldul HE is under the Ministry of Power in the Transmission & Distribution sector. Project code: 608302. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission system for evacuation of Power from Pakaldul HE is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.