Transmission & DistributionIPM · Central Project#617279

Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh [SPV Name - POWERGRID MEL Power Transmission Limited]

Ministry of PowerMadhya Pradesh
Revised Cost: ₹558 CrUtilization: 33.0%

Original Cost

₹558 Cr

Baseline estimate

On budget

Revised Cost

₹558 Cr

Latest approved cost

Expenditure

₹184 Cr

Spent to date

Utilization

33.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹374 Cr

Budget left

Budget Utilization

33.0%
0%25%50%75%100%

Spent

₹184 Cr

Remaining

₹374 Cr

Total

₹558 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

04/12/2027

Revised Completion

Completed

Project Details

Project Code617279
SectorTransmission & Distribution
MinistryMinistry of Power
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹558 Cr
Revised Cost₹558 Cr
Expenditure₹184 Cr
Original End Date04/12/2027
Revised DateN/A

Project Intelligence

Project is within original budget of ₹558 Cr — no cost escalation recorded.

Expenditure stands at ₹184 Cr, which is 33.0% of the revised project cost.

Remaining budget: ₹374 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh [SPV Name - POWERGRID MEL Power Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹558.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission System for evacuation of power from Mahan Energen Limited Generatin"?
Transmission System for evacuation of power from Mahan Energen Limited Generating Station in Madhya Pradesh [SPV Name - POWERGRID MEL Power Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Madhya Pradesh. Original cost: ₹558 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹558 Cr has not been significantly revised. Expenditure: ₹184 Cr (33.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Transmission System for evacuation of power from Mahan Energ is under the Ministry of Power in the Transmission & Distribution sector. Project code: 617279. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission System for evacuation of power from Mahan Energ is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.