Transmission Scheme for Integration of Renewable Energy Zone [Phase II] in Koppal II [Phase A&B] and gadag II[Phase A] in Karnataka [POWERGRID KOPPAL GADAG TRANSMISSION LIMITED]
Original Cost
₹4445 Cr
Baseline estimate
Revised Cost
₹4445 Cr
Latest approved cost
Expenditure
₹4178 Cr
Spent to date
Utilization
94.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹267 Cr
Budget left
Budget Utilization
94.0%Spent
₹4178 Cr
Remaining
₹267 Cr
Total
₹4445 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/12/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹4445 Cr — no cost escalation recorded.
Expenditure stands at ₹4178 Cr, which is 94.0% of the revised project cost.
Remaining budget: ₹267 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Transmission Scheme for Integration of Renewable Energy Zone [Phase II] in Koppal II [Phase A&B] and gadag II[Phase A] in Karnataka [POWERGRID KOPPAL GADAG TRANSMISSION LIMITED] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹4445.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Transmission Scheme for Integration of Renewable Energy Zone [Phase II] in Koppa"?
- Transmission Scheme for Integration of Renewable Energy Zone [Phase II] in Koppal II [Phase A&B] and gadag II[Phase A] in Karnataka [POWERGRID KOPPAL GADAG TRANSMISSION LIMITED] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Karnataka. Original cost: ₹4445 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹4445 Cr has not been significantly revised. Expenditure: ₹4178 Cr (94.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Transmission Scheme for Integration of Renewable Energy Zone is under the Ministry of Power in the Transmission & Distribution sector. Project code: 612140. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission Scheme for Integration of Renewable Energy Zone is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.