Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Transmission Scheme for Evacuation of power from R
Transmission & DistributionIPM · Central Project#612132

Transmission Scheme for Evacuation of power from REZ in Rajasthan [20 GW] under Phase-III Part D Phase I [Sikar Khetri Transmission Ltd]

Ministry of PowerRajasthanData: 2026-05
Revised Cost: ₹2423 CrUtilization: 85.0%

Original Cost

₹2423 Cr

Baseline estimate

On Budget

Revised Cost

₹2423 Cr

Latest approved cost

Expenditure

₹2060 Cr

Spent to date

Utilization

85.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹363 Cr

Budget left

Budget Utilization

85.0%
0%25%50%75%100%

Spent

₹2060 Cr

Remaining

₹363 Cr

Total

₹2423 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

08/08/2025

Revised Completion

30/09/2026

Completed

Project Details

Project Code612132
SectorTransmission & Distribution
MinistryMinistry of Power
StateRajasthan
Data Month2026-05

Financial & Timeline

Original Cost₹2423 Cr
Revised Cost₹2423 Cr
Expenditure₹2060 Cr
Original End Date08/08/2025
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹2423 Cr — no cost escalation recorded.

Expenditure stands at ₹2060 Cr, which is 85.0% of the revised project cost.

Remaining budget: ₹363 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Frequently Asked Questions

What is IPM project "Transmission Scheme for Evacuation of power from REZ in Rajasthan [20 GW] under "?
Transmission Scheme for Evacuation of power from REZ in Rajasthan [20 GW] under Phase-III Part D Phase I [Sikar Khetri Transmission Ltd] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Rajasthan. Original cost: ₹2423 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹2423 Cr has not been significantly revised. Expenditure: ₹2060 Cr (85.0% of cost). Data as of 2026-05.
Which ministry is responsible for this project?
Transmission Scheme for Evacuation of power from REZ in Raja is under the Ministry of Power in the Transmission & Distribution sector. Project code: 612132. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission Scheme for Evacuation of power from REZ in Raja is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview