Transmission & DistributionIPM · Central Project#611657

Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part C

Ministry of PowerGujarat
Revised Cost: ₹2821 CrUtilization: 98.7%

Original Cost

₹2821 Cr

Baseline estimate

On budget

Revised Cost

₹2821 Cr

Latest approved cost

Expenditure

₹2783 Cr

Spent to date

Utilization

98.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹38 Cr

Budget left

Budget Utilization

98.7%
0%25%50%75%100%

Spent

₹2783 Cr

Remaining

₹38 Cr

Total

₹2821 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/03/2025

Revised Completion

31/01/2026

Completed

Project Details

Project Code611657
SectorTransmission & Distribution
MinistryMinistry of Power
StateGujarat
Data Month2025-12

Financial Summary

Original Cost₹2821 Cr
Revised Cost₹2821 Cr
Expenditure₹2783 Cr
Original End Date31/03/2025
Revised Date31/01/2026

Project Intelligence

Project is within original budget of ₹2821 Cr — no cost escalation recorded.

Expenditure stands at ₹2783 Cr, which is 98.7% of the revised project cost.

Remaining budget: ₹38 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part C is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹2821.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phas"?
Transmission scheme for evacuation of 4.5GW RE injection at Khavda PS under Phase II- Part C is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹2821 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2821 Cr has not been significantly revised. Expenditure: ₹2783 Cr (98.7% of cost). Data as of 2025-12.
QWhich ministry is responsible for this project?
Transmission scheme for evacuation of 4.5GW RE injection at is under the Ministry of Power in the Transmission & Distribution sector. Project code: 611657. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Transmission scheme for evacuation of 4.5GW RE injection at is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.