SteelIPM · Central Project#617251

Revamping of Air Pollution Control Systems of SP-1 at Durgapur Steel Plant

Ministry of SteelWest Bengal
Revised Cost: ₹196 CrUtilization: 37.4%

Original Cost

₹196 Cr

Baseline estimate

On budget

Revised Cost

₹196 Cr

Latest approved cost

Expenditure

₹73 Cr

Spent to date

Utilization

37.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹123 Cr

Budget left

Budget Utilization

37.4%
0%25%50%75%100%

Spent

₹73 Cr

Remaining

₹123 Cr

Total

₹196 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

27/05/2026

Revised Completion

31/12/2026

Completed

Project Details

Project Code617251
SectorSteel
MinistryMinistry of Steel
StateWest Bengal
Data Month2026-08

Financial Summary

Original Cost₹196 Cr
Revised Cost₹196 Cr
Expenditure₹73 Cr
Original End Date27/05/2026
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹196 Cr — no cost escalation recorded.

Expenditure stands at ₹73 Cr, which is 37.4% of the revised project cost.

Remaining budget: ₹123 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Steel. Ministry: Ministry of Steel.

Revamping of Air Pollution Control Systems of SP-1 at Durgapur Steel Plant is a centrally-funded infrastructure project under Ministry of Steel, in the Steel sector. The original approved cost is ₹196.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Revamping of Air Pollution Control Systems of SP-1 at Durgapur Steel Plant"?
Revamping of Air Pollution Control Systems of SP-1 at Durgapur Steel Plant is a centrally-funded infrastructure project under the Ministry of Steel, tracked through the Investment Project Monitoring (IPM) system. Sector: Steel. State: West Bengal. Original cost: ₹196 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹196 Cr has not been significantly revised. Expenditure: ₹73 Cr (37.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Revamping of Air Pollution Control Systems of SP-1 at Durgap is under the Ministry of Steel in the Steel sector. Project code: 617251. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Revamping of Air Pollution Control Systems of SP-1 at Durgap is one of several Bihar projects tracked under the Steel sector on the IPM system.