Provision of Dynamic Reactive Compensation at Khavda pooling Station 1 [KPS1] and Khavda Pooling station 3 [KPS3]
Original Cost
₹501 Cr
Baseline estimate
Revised Cost
₹501 Cr
Latest approved cost
Expenditure
₹30 Cr
Spent to date
Utilization
6.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹471 Cr
Budget left
Budget Utilization
6.0%Spent
₹30 Cr
Remaining
₹471 Cr
Total
₹501 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/11/2026
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹501 Cr — no cost escalation recorded.
Expenditure stands at ₹30 Cr, which is 6.0% of the revised project cost.
Remaining budget: ₹471 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Provision of Dynamic Reactive Compensation at Khavda pooling Station 1 [KPS1] and Khavda Pooling station 3 [KPS3] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹501.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Provision of Dynamic Reactive Compensation at Khavda pooling Station 1 [KPS1] an"?
- Provision of Dynamic Reactive Compensation at Khavda pooling Station 1 [KPS1] and Khavda Pooling station 3 [KPS3] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Gujarat. Original cost: ₹501 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹501 Cr has not been significantly revised. Expenditure: ₹30 Cr (6.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Provision of Dynamic Reactive Compensation at Khavda pooling is under the Ministry of Power in the Transmission & Distribution sector. Project code: 615343. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Provision of Dynamic Reactive Compensation at Khavda pooling is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.