Phase 1B - Construction of Academic Block, Hostel, Residential Tower, Directors Residence and External Development works at National Institute of Technology, Delhi Campus on Engineering, Procurement and Construction basis
Original Cost
₹333 Cr
Baseline estimate
Revised Cost
₹336 Cr
Latest approved cost
Expenditure
₹336 Cr
Spent to date
Utilization
100.0%
Of revised budget
Cost Status
+1.0%
+₹3 Cr increase
Remaining
₹0 Cr
Budget left
Budget Utilization
100.0%Spent
₹336 Cr
Remaining
₹0 Cr
Total
₹336 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹333 Cr
Revised Cost
₹336 Cr
Increase
+₹3 Cr
Escalation
+1.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/09/2025
Revised Completion
31/01/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹3 Cr (1.0%) from the original estimate of ₹333 Cr.
Expenditure stands at ₹336 Cr, which is 100.0% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Education. Ministry: Department of Higher Education.
Phase 1B - Construction of Academic Block, Hostel, Residential Tower, Directors Residence and External Development works at National Institute of Technology, Delhi Campus on Engineering, Procurement and Construction basis is a centrally-funded infrastructure project under Department of Higher Education, in the Education sector. The original approved cost is ₹333.00 Cr, later revised to ₹336.42 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Phase 1B - Construction of Academic Block, Hostel, Residential Tower, Directors "?
- Phase 1B - Construction of Academic Block, Hostel, Residential Tower, Directors Residence and External Development works at National Institute of Technology, Delhi Campus on Engineering, Procurement and Construction basis is a centrally-funded infrastructure project under the Department of Higher Education, tracked through the Investment Project Monitoring (IPM) system. Sector: Education. State: Delhi. Original cost: ₹333 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹333 Cr and has been revised to ₹336 Cr — a cost overrun of +1%. Expenditure to date: ₹336 Cr (100.0% of revised cost). Data as of 2026-07.
- QWhich ministry is responsible for this project?
- Phase 1B - Construction of Academic Block, Hostel, Residenti is under the Department of Higher Education in the Education sector. Project code: 612851. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Phase 1B - Construction of Academic Block, Hostel, Residenti is one of several Bihar projects tracked under the Education sector on the IPM system.