Transmission & DistributionIPM · Central Project#617807

Inter-regional [NR-WR] Transmission System strengthening to relieve the loading of 765 kV Vindhyachal-Varanasi D/c line

Ministry of PowerUttar Pradesh
Revised Cost: ₹2368 CrUtilization: 7.0%

Original Cost

₹2368 Cr

Baseline estimate

On budget

Revised Cost

₹2368 Cr

Latest approved cost

Expenditure

₹166 Cr

Spent to date

Utilization

7.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹2202 Cr

Budget left

Budget Utilization

7.0%
0%25%50%75%100%

Spent

₹166 Cr

Remaining

₹2202 Cr

Total

₹2368 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

16/10/2027

Revised Completion

Completed

Project Details

Project Code617807
SectorTransmission & Distribution
MinistryMinistry of Power
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹2368 Cr
Revised Cost₹2368 Cr
Expenditure₹166 Cr
Original End Date16/10/2027
Revised DateN/A

Project Intelligence

Project is within original budget of ₹2368 Cr — no cost escalation recorded.

Expenditure stands at ₹166 Cr, which is 7.0% of the revised project cost.

Remaining budget: ₹2202 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Transmission & Distribution. Ministry: Ministry of Power.

Inter-regional [NR-WR] Transmission System strengthening to relieve the loading of 765 kV Vindhyachal-Varanasi D/c line is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹2368.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Inter-regional [NR-WR] Transmission System strengthening to relieve the loading "?
Inter-regional [NR-WR] Transmission System strengthening to relieve the loading of 765 kV Vindhyachal-Varanasi D/c line is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Uttar Pradesh. Original cost: ₹2368 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2368 Cr has not been significantly revised. Expenditure: ₹166 Cr (7.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Inter-regional [NR-WR] Transmission System strengthening to is under the Ministry of Power in the Transmission & Distribution sector. Project code: 617807. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Inter-regional [NR-WR] Transmission System strengthening to is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.