Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6
Original Cost
₹1037 Cr
Baseline estimate
Revised Cost
₹1106 Cr
Latest approved cost
Expenditure
₹1146 Cr
Spent to date
Utilization
103.6%
Of revised budget
Cost Status
+6.7%
+₹69 Cr increase
Remaining
₹0 Cr
Budget left
Budget Utilization
103.6%Spent
₹1146 Cr
Remaining
₹0 Cr
Total
₹1106 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1037 Cr
Revised Cost
₹1106 Cr
Increase
+₹69 Cr
Escalation
+6.7%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
22/01/2024
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹69 Cr (6.7%) from the original estimate of ₹1037 Cr.
Expenditure stands at ₹1146 Cr, which is 103.6% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Electricity Generation. Ministry: Ministry of Power.
Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6 is a centrally-funded infrastructure project under Ministry of Power, in the Electricity Generation sector. The original approved cost is ₹1037.00 Cr, later revised to ₹1106.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6"?
- Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6 is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Electricity Generation. State: West Bengal. Original cost: ₹1037 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1037 Cr and has been revised to ₹1106 Cr — a cost overrun of +6.7%. Expenditure to date: ₹1146 Cr (103.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6 is under the Ministry of Power in the Electricity Generation sector. Project code: 602538. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Installation of FGD for 4x210 & 2x250 MW MTPS U 1-6 is one of several Bihar projects tracked under the Electricity Generation sector on the IPM system.