Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis.
Original Cost
₹252 Cr
Baseline estimate
Revised Cost
₹300 Cr
Latest approved cost
Expenditure
₹224 Cr
Spent to date
Utilization
74.4%
Of revised budget
Cost Status
+19.2%
+₹48 Cr increase
Remaining
₹77 Cr
Budget left
Budget Utilization
74.4%Spent
₹224 Cr
Remaining
₹77 Cr
Total
₹300 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹252 Cr
Revised Cost
₹300 Cr
Increase
+₹48 Cr
Escalation
+19.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/11/2024
Revised Completion
25/03/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹48 Cr (19.2%) from the original estimate of ₹252 Cr.
Expenditure stands at ₹224 Cr, which is 74.4% of the revised project cost.
Remaining budget: ₹77 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Education. Ministry: Department of Higher Education.
Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis. is a centrally-funded infrastructure project under Department of Higher Education, in the Education sector. The original approved cost is ₹252.00 Cr, later revised to ₹300.45 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Permanent Campus of Central University of Himachal Pradesh at De"?
- Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis. is a centrally-funded infrastructure project under the Department of Higher Education, tracked through the Investment Project Monitoring (IPM) system. Sector: Education. State: Himachal Pradesh. Original cost: ₹252 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹252 Cr and has been revised to ₹300 Cr — a cost overrun of +19.2%. Expenditure to date: ₹224 Cr (74.4% of revised cost). Data as of 2026-07.
- QWhich ministry is responsible for this project?
- Construction of Permanent Campus of Central University of Hi is under the Department of Higher Education in the Education sector. Project code: 612894. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Permanent Campus of Central University of Hi is one of several Bihar projects tracked under the Education sector on the IPM system.