EducationIPM · Central Project +19.2% overrun#612894

Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis.

Department of Higher EducationHimachal Pradesh
Revised Cost: ₹300 CrUtilization: 74.4%Overrun: +₹48 Cr

Original Cost

₹252 Cr

Baseline estimate

+19% overrun

Revised Cost

₹300 Cr

Latest approved cost

Expenditure

₹224 Cr

Spent to date

Utilization

74.4%

Of revised budget

Escalated

Cost Status

+19.2%

+₹48 Cr increase

Remaining

₹77 Cr

Budget left

Budget Utilization

74.4%
0%25%50%75%100%

Spent

₹224 Cr

Remaining

₹77 Cr

Total

₹300 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹252 Cr

Revised Cost

₹300 Cr

Increase

+₹48 Cr

Escalation

+19.2%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/11/2024

Revised Completion

25/03/2026

Completed

Project Details

Project Code612894
SectorEducation
MinistryDepartment of Higher Education
StateHimachal Pradesh
Data Month2026-07

Financial Summary

Original Cost₹252 Cr
Revised Cost₹300 Cr
Expenditure₹224 Cr
Original End Date18/11/2024
Revised Date25/03/2026

Project Intelligence

Cost has increased by ₹48 Cr (19.2%) from the original estimate of ₹252 Cr.

Expenditure stands at ₹224 Cr, which is 74.4% of the revised project cost.

Remaining budget: ₹77 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Education. Ministry: Department of Higher Education.

Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis. is a centrally-funded infrastructure project under Department of Higher Education, in the Education sector. The original approved cost is ₹252.00 Cr, later revised to ₹300.45 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Permanent Campus of Central University of Himachal Pradesh at De"?
Construction of Permanent Campus of Central University of Himachal Pradesh at Dehra, District - Kangra, [H.P.] on Engineering. Procurement and Construction [EPC Mode 1] Basis. is a centrally-funded infrastructure project under the Department of Higher Education, tracked through the Investment Project Monitoring (IPM) system. Sector: Education. State: Himachal Pradesh. Original cost: ₹252 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹252 Cr and has been revised to ₹300 Cr — a cost overrun of +19.2%. Expenditure to date: ₹224 Cr (74.4% of revised cost). Data as of 2026-07.
QWhich ministry is responsible for this project?
Construction of Permanent Campus of Central University of Hi is under the Department of Higher Education in the Education sector. Project code: 612894. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Permanent Campus of Central University of Hi is one of several Bihar projects tracked under the Education sector on the IPM system.