Augmentation of Transformation Capacity and Implementation of Line Bays at Mandsaur S/S for RE Interconnection [SPV Name- POWERGRID Mandsaur I RE Transmission Limited]
Original Cost
₹319 Cr
Baseline estimate
Revised Cost
₹319 Cr
Latest approved cost
Expenditure
₹18 Cr
Spent to date
Utilization
5.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹301 Cr
Budget left
Budget Utilization
5.6%Spent
₹18 Cr
Remaining
₹301 Cr
Total
₹319 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/03/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹319 Cr — no cost escalation recorded.
Expenditure stands at ₹18 Cr, which is 5.6% of the revised project cost.
Remaining budget: ₹301 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Transmission & Distribution. Ministry: Ministry of Power.
Augmentation of Transformation Capacity and Implementation of Line Bays at Mandsaur S/S for RE Interconnection [SPV Name- POWERGRID Mandsaur I RE Transmission Limited] is a centrally-funded infrastructure project under Ministry of Power, in the Transmission & Distribution sector. The original approved cost is ₹319.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Augmentation of Transformation Capacity and Implementation of Line Bays at Mand"?
- Augmentation of Transformation Capacity and Implementation of Line Bays at Mandsaur S/S for RE Interconnection [SPV Name- POWERGRID Mandsaur I RE Transmission Limited] is a centrally-funded infrastructure project under the Ministry of Power, tracked through the Investment Project Monitoring (IPM) system. Sector: Transmission & Distribution. State: Madhya Pradesh. Original cost: ₹319 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹319 Cr has not been significantly revised. Expenditure: ₹18 Cr (5.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Augmentation of Transformation Capacity and Implementation o is under the Ministry of Power in the Transmission & Distribution sector. Project code: 617802. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Augmentation of Transformation Capacity and Implementation o is one of several Bihar projects tracked under the Transmission & Distribution sector on the IPM system.