Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand under Amritsar Kolkata Industrial Corridor on EPC Basis
Tender Specifications & Timeline
15 FieldsTotal Bidders
10
Lowest Bid (L1)
₹461.04 Cr
Estimated Value (PAC)
—
Margin vs Estimate
—
L1 to L2 Spread
+1.51%
| Rank | Bidder / Contractor | Quoted Bid | Gap vs L1 | vs Estimate | Status |
|---|---|---|---|---|---|
| L1 | ₹461.04 Cr | 0.0% (L1) | — | Accepted-Finance | |
| L2 | PNC Infratech Limited#405708 | ₹468.00 Cr | +1.51% | Rejected-Fin | Rejected-Finance |
| L3 | ₹484.61 Cr | +5.11% | Rejected-Fin | Rejected-Finance | |
| L4 | ₹486.54 Cr | +5.53% | Rejected-Fin | Rejected-Finance | |
| L5 | Ircon International Limited#405148 | ₹500.97 Cr | +8.66% | Rejected-Fin | Rejected-Finance |
| L6 | ₹553.66 Cr | +20.09% | Rejected-Fin | Rejected-Finance | |
| L7 | POWER MECH PROJECTS LIMITED#405419 | ₹503.89 Cr | +9.29% | Rejected-Fin | Rejected-Finance |
| L8 | Gawar Construction Limited#405307 | ₹527.33 Cr | +14.38% | Rejected-Fin | Rejected-Finance |
| DQ | JSP Projects Pvt Ltd#405660 | — | — | Rejected-Tech | Rejected-Technical |
| DQ | NKC PROJECTS PRIVATE LIMITED#405362 | — | — | Rejected-Tech | Rejected-Technical |
This tender covers design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand under Amritsar Kolkata Industrial Corridor on EPC Basis, issued by Md - Siidcul under reference 34/NUITL/2025. The tender is currently Expired. Under financial bid evaluation, Raj Shyama Constructions Pvt. Ltd. emerged as the lowest (L1) bidder with a quoted bid amount of ₹461.04 Cr.
This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in Khurpia, District Udhamsingh Nagar. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.
L4 Bidder
L8 Bidder
L3 Bidder
L5 Bidder
Technically Non-Responsive
Technically Non-Responsive
L2 Bidder
L7 Bidder
L1 Bidder
L6 Bidder
| Bidder | Submitted On | Status | Fin. Value | Rank | Remarks / Logs |
|---|---|---|---|---|---|
Dineshchandra R Agrawal Infracon Pvt. Ltd. #405804 | 10-Nov-2025 02:22 PM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 4865400000.00 | L4 | L4 Bidder |
Gawar Construction Limited #405307 | 10-Nov-2025 10:51 AM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 5273298000.00 | L8 | L8 Bidder |
H.G. Infra Engineering Limited #405624 | 10-Nov-2025 01:48 PM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 4846122000.00 | L3 | L3 Bidder |
Ircon International Limited #405148 | 10-Nov-2025 02:47 PM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 5009730000.00 | L5 | L5 Bidder |
JSP Projects Pvt Ltd #405660 | 10-Nov-2025 02:05 PM | Rejected-Technical Updated: 01-Dec-2025 08:28 PM | — | — | Technically Non-Responsive |
NKC PROJECTS PRIVATE LIMITED #405362 | 10-Nov-2025 11:35 AM | Rejected-Technical Updated: 01-Dec-2025 08:28 PM | — | — | Technically Non-Responsive |
PNC Infratech Limited #405708 | 10-Nov-2025 02:29 PM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 4680000000.00 | L2 | L2 Bidder |
POWER MECH PROJECTS LIMITED #405419 | 10-Nov-2025 01:07 PM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 5038859346.00 | L7 | L7 Bidder |
Raj Shyama Constructions Pvt. Ltd. #403321 | 10-Nov-2025 02:42 PM | Accepted-Finance Updated: 08-Dec-2025 01:57 PM | 4610400000.00 | L1 | L1 Bidder |
RCC DEVELOPERS PRIVATE LIMITED #405369 | 10-Nov-2025 11:42 AM | Rejected-Finance Updated: 08-Dec-2025 01:57 PM | 5536560000.00 | L6 | L6 Bidder |
Bid Evaluation Details & Logs
technical bid opening
Date: 01-Dec-2025 06:50 PM
Officer: Yudhvir Singh Pundir
The summary of bid evaluation is attached.
technical evaluation
Date: 01-Dec-2025 08:28 PM
Officer: Yudhvir Singh Pundir
finance bid opening
Date: 08-Dec-2025 01:42 PM
Officer: Sachin Kush
Financial bid comparative sheet (as per portal) is being uploaded for information.
finance evaluation
Date: 08-Dec-2025 01:57 PM
Officer: Yudhvir Singh Pundir
About This Procurement Notice
This Uttarakhand state government tender was issued by Md - Siidcul. Bids must be submitted by 10-Nov-2025 03:00 PM.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Design Construction Testing Commissioning and Operation and Maintenance of Infra"?
- The current status of this tender is "Expired". The submission deadline is 10-Nov-2025 03:00 PM. This information is sourced from official government procurement portals.
- QWho issued this Uttarakhand government tender?
- This tender was issued by Md - Siidcul. The reference number is 34/NUITL/2025. It is a Uttarakhand state government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value has not been disclosed for this procurement notice. Please refer to the official tender documents for detailed specifications.
- QWho is the lowest (L1) bidder for this tender?
- Under financial bid evaluation for "Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Integrated Manufacturing Cluster Khurpia Uttarakhand under Amritsar Kolkata Industrial Corridor on EPC Basis", Raj Shyama Constructions Pvt. Ltd. emerged as the lowest (L1) bidder with a quoted bid amount of ₹461.04 Cr. Full bid rankings and vendor comparisons are available on BiharInfraTales.