| L11 | Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 760 BRTF on road SBU NH01 in UT JK under project BEACON BRO on EPC Mode ministry of road transport and highways•Jammu and Kashmir•07-Jun-2023 | ₹335.00 Cr | ₹456.55 Cr | -26.62% | Admitted-Finance | View |
| L8 | Construction of 4 Lane With PS Pattan Bypass From Existing Km 24.320 To Km 33.760 nd Dsgn Km 24.400 To Km 35.300 Length 10.900 Km On Road SBU NH01 in Ut JK Under Project Beacon Bro on EPC Mode ministry of road transport and highways•JAMMU AND KASHMIR•09-Jun-2023 | ₹332.50 Cr | ₹432.91 Cr | -23.19% | Admitted-Finance | View |
| L13 | Widening to 2Lane with paved shoulder from Km 197.270 to Km225.610 and KM241.500 to KM243.300 of NH148B Surewala chowk to Haryana Punjab Border in the state of Haryana on EPC Mode ministry of road transport and highways•Fatehabad•09-Jun-2023 | ₹91.08 Cr | ₹111.64 Cr | -18.42% | Admitted-Finance | View |
| L6 | Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Annual Plan2022-23in the State of Uttarakhand ministry of road transport and highways•NH-58•25-Jul-2023 | ₹116.00 Cr | ₹142.59 Cr | -18.65% | Admitted-Finance | View |
| L17 | Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujrat on Hybrid Annuity Mode. ministry of road transport and highways•New Delhi•14-Mar-2024 | ₹1022.99 Cr | ₹883.24 Cr | +15.82% | Admitted-Finance | View |
| L7 | Construction of 4-lane Gauripur Bypass starting from Km. 852.560 of NH-31 and Terminating at Km. 862.170 via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari PtIII and meeting at Km 862.170 of NH-17(New)/NH-31(Old) in Assam under EPC Mode ministry of road transport and highways•New Delhi•04-Jul-2024 | ₹239.82 Cr | ₹318.23 Cr | -24.64% | Admitted-Finance | View |
| DQ | Slope stabilization and rock fall mitigation works at Km 273 280 to 273 600 Km 274 310 to 274 435 274 550 to 274 660 and 275 730 to 275 855 on NH 05 in the state of Himachal Pradesh ministry of road transport and highways•Rampur•20-Jul-2024 | ₹19.92 Cr | ₹21.64 Cr | -7.95% | Rejected-Finance | View |
| — | Construction of road from km 70.000 to km 113.000 (Package-3) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹793.89 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | 4-Laning of Dewas Ujjain from Design Ch.0.000-19.733 Construction of 4-Lane Ujjain Bypass Ch.19.733-26.900 (Part-I) and construction of 4-Lane Dewas Bypass from Design Ch.0.000-14.520 (Part-II) with a total design length of 41.42 km in MP on HAM Mode national highways authority of india•NHAI HQ•01-Jan-2020 | — | ₹595.97 Cr | — | Admitted-Finance | View |
| — | Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500 km 126.500 to km 158.500 including ACC link road from km 0.00 to km 2.003) Greenfield Alignment (Package2) in the State of Himachal Pradesh on HAM. national highways authority of india•NHAI HQ•10-Jan-2020 | — | ₹1455.73 Cr | — | Admitted-Finance | View |
| — | Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode national highways authority of india•NHAI HQ•13-Jan-2020 | — | ₹684.51 Cr | — | Admitted-Finance | View |
| — | 4 laning with paved shoulder from Meerut to after bridge over river Yamuna Haryana via Shamli from km 0.000 to 88.476 of NH 709A 0 at Meerut on ch. 67.550 of NH 58 in the State of Uttar Pradesh re-invitation national highways authority of india•NHAI HQ•29-Jan-2020 | — | ₹586.24 Cr | — | Admitted-Finance | View |
| — | Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode national highways authority of india•NHAI HQ•30-Jan-2020 | — | ₹1237.34 Cr | — | Admitted-Finance | View |
| — | Construction of 8Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village with SH-152 near Matariya Vadi in Panchmahal (Ch.729.700-756.052) of Delhi-Vadodara GA on EPC Mode under BMP in Gujarat national highways authority of india•NHAI HQ•21-Feb-2020 | — | ₹874.04 Cr | — | Admitted-Finance | View |
| — | Construction of 8Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi and near Bhamaiya village in Panchmahal district (Ch.756.052-781.282) section of Delhi-Vadodara GAon EPC Mode under BMP in Gujarat national highways authority of india•NHAI HQ•21-Feb-2020 | — | ₹803.29 Cr | — | Admitted-Finance | View |
| — | FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 OLD NH 30 FROM KM 54.530 TO KM 115.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PH-I ON EPC MODE PACKAGE II national highways authority of india•NHAI HQ•27-Feb-2020 | — | ₹727.74 Cr | — | Admitted-Finance | View |
| — | 4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I national highways authority of india•NHAI HQ•27-Feb-2020 | — | ₹690.48 Cr | — | Admitted-Finance | View |
| — | Balance work of 4-laning of Patna-Gaya-Dobhi Section of NH-83 from km. 0.000 to km. 39.000 Pkg-I on item rate basis in the State of Bihar national highways authority of india•NHAI HQ•05-Mar-2020 | — | ₹733.45 Cr | — | Admitted-Finance | View |
| — | Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Pkg1) national highways authority of india•NHAI HQ•03-Apr-2020 | — | ₹774.53 Cr | — | Admitted-Finance | View |
| — | Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujar national highways authority of india•NHAI HQ•03-Apr-2020 | — | — | — | Admitted-Finance | View |
| — | Four laning of Rajauli Bakhtiyarpur section of NH-31(New NH20) from Km 54.405 to Km101.630 (Package II) on Hybrid annuity mode in the State of Bihar national highways authority of india•NHAI HQ•26-May-2020 | — | ₹845.87 Cr | — | Admitted-Finance | View |
| — | Four laning of Rajauli-Bakhtiyarpur section of NH-31 New NH-20 from Km 101.630 to Km 152.520 Pkg-III on Hybrid annuity mode in the State of Bihar national highways authority of india•NHAI HQ•28-May-2020 | — | ₹1987.52 Cr | — | Admitted-Finance | View |
| — | RFP for 6-laning of Kanhauli-Ramnagar section of SH-78 (declaration of NH under consideration) from design Ch.Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana national highways authority of india•NHAI HQ•19-Jun-2020 | — | ₹726.85 Cr | — | Admitted-Finance | View |
| L1 | Completion of Balance Work of Four-laning of Srinagar-Banihal section of NH-44 (old NH-1A) from Km 220.700 to Km 286.110 in the UT of Jammu and Kashmir (2nd Call) national highways authority of india•Kashmir•16-Jul-2020 | ₹155.00 Cr | — | — | Awarded (L1) | View |
| — | Reconstruction and Rehabilitation Bituminous Pavement Works and Incidental Works of Deoli-Kota Section of NH- 12 (New NH- 52) from Km. 165.00 to Talabgaon Junction (Design Km.167.624 to Km. 205.724) in the state of Rajasthan (Package-1) national highways authority of india•NHAI HQ•17-Aug-2020 | — | ₹109.34 Cr | — | Admitted-Finance | View |
| — | Reconstruction and Rehabilitation with Cement Concrete Pavement and Incidental Works of Deoli-Kota (New NH- 52) from Talabgaon to Junction of NH- 76 (New NH- 27) on Kota Bypass (Design Km.205.724 to Km. 250.144) in the state of Rajasthan (Package-2) national highways authority of india•NHAI HQ•17-Aug-2020 | — | ₹244.22 Cr | — | Admitted-Finance | View |
| — | Completion of Balance Works of Panikoili-Rimuli Section of NH 215 New NH 20 from Km 0.00 to Km. 163.000 in the State of Odisha on Single Percentage Item Rate Basis. national highways authority of india•NHAI HQ•24-Aug-2020 | — | ₹182.40 Cr | — | Admitted-Finance | View |
| — | Construction of Left out Work of Four laning of Talaja Mahuva Section of NH 8E design chainage from km. 54.990 to km. 100.450 Package II in the state of Gujarat national highways authority of india•NHAI HQ•28-Aug-2020 | — | ₹646.61 Cr | — | Admitted-Finance | View |
| — | Construction of Left out work of four Laning of Mahuva to Kagavadar Section of NH-8E Design Chainage from Km 100.450 to km 140.470 Package-III in the State of Gujarat national highways authority of india•NHAI HQ•28-Aug-2020 | — | ₹559.14 Cr | — | Admitted-Finance | View |
| — | Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode national highways authority of india•NHAI HQ•09-Sep-2020 | — | ₹708.93 Cr | — | Admitted-Finance | View |
| — | Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Jussur Kheri on KMP Expressway to Junction with Rohtak Panipat road (NH 709) near Rukhi Paani village (Km 0.000 to Km 34.000) on HAM under Bharatmala Pariyojna in Haryana national highways authority of india•NHAI HQ•28-Sep-2020 | — | ₹1053.34 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Rohtak Panipat road (NH709) near Rukhi Paani village to Junction with Jind Panipat road (NH352A)near Gangana (Km 34.000 to Km 60.800) on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹858.41 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jind-Panipat road NH352A near Gangana village to Junction with Jind Karnal road NH709A near Alewa village (Km 60.800 to Km 91.400) on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹894.98 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jind Karnal road NH709A near Alewa to Junction with Ambala Kaithal Hissar road NH152 near Kharak Pandwa village Km 91.400 to 120.250 on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹838.50 Cr | — | Accepted-Technical | View |
| — | Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Junction with Ambala Kaithal Hissar road NH152 to Junction with Patiala Samana Patran road SH10 Km 120.250 to Km 157.920 on HAM under BP in Haryana and Punjab national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹1099.94 Cr | — | Accepted-Technical | View |
| — | 4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode national highways authority of india•NHAI HQ•22-Oct-2020 | — | ₹798.43 Cr | — | Admitted-Finance | View |
| — | Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode national highways authority of india•NHAI HQ•29-Oct-2020 | — | ₹805.29 Cr | — | Accepted-Technical | View |
| — | Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode national highways authority of india•NHAI HQ•29-Oct-2020 | — | ₹707.88 Cr | — | Admitted-Finance | View |
| — | Construction of 4-lane Greenfield Delhi-Katra Expressway from Junction with Patiala-Samana-Patran road (SH-10) near Ghagga village to Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh (Km 157.920 to Km 188.830) on EPC under BMP in Punjab national highways authority of india•NHAI HQ•17-Nov-2020 | — | ₹850.12 Cr | — | Accepted-Technical | View |
| — | Construction of 4 lane Greenfield Delhi Amritsar Katra Expressway from Junction with Ludhiana Malerkotla road SH11 near Bhogiwal village to Junction with Ludhiana Moga road NH-5near Mullanpur Dakha Km 225.770 to 260.860 on EPC mode under BP in Punjab national highways authority of india•NHAI HQ•17-Nov-2020 | — | ₹1129.02 Cr | — | Accepted-Technical | View |
| — | Construction of 4-lane Greenfield Delhi-Katra Expressway from Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction with Ludhiana-Malerkotla road (SH-11) near Bhogiwal village (Km 188.830 to km 225.770) on EPC under BMP in Punjab national highways authority of india•NHAI HQ•17-Nov-2020 | — | ₹983.33 Cr | — | Accepted-Technical | View |
| — | Construction of 4-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Ludhiana Moga roadNH 5 near Mullanpur Dakha to Junction with Jalandhar Moga road NH 703 near Kang Sahibu village 260.860 to 303.900 on EPC mode under BP in Punjab national highways authority of india•NHAI HQ•17-Nov-2020 | — | ₹1404.13 Cr | — | Accepted-Technical | View |
| — | Construction of 4lane Greenfield DelhiAmritsar Katra Expressway from Junction with Jalandhar Moga road (NH-703) Kang Sahibu village to Junction with Jalandhar Kapurthala road (NH703A) near Khojewal village (Km 303.900 to km 319.400 of main expressway national highways authority of india•NHAI HQ•18-Nov-2020 | — | ₹1230.92 Cr | — | Accepted-Technical | View |
| — | Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH-65 near Patas -Vasunde Phata-Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra under BMP on EPC mode national highways authority of india•NHAI HQ•23-Nov-2020 | — | ₹702.60 Cr | — | Accepted-Technical | View |
| — | Construction of 4lane GF Delhi-Katra Expressway from Junction with Jalandhar-Kapurthala road NH-703A near Khojewal village-Junction with Amritsar-Tanda road NH-503A near Sri Hargobindpur Km 319.400-362.420 on EPC under BMP in Punjab national highways authority of india•NHAI HQ•27-Nov-2020 | — | ₹1437.20 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi-Katra Expressway from Junction with Amritsar-Tanda road (NH-503A) near Sri Hargobindpur to Junction with Pathankot-Gurdaspur road (NH-54) near Gurdaspur (Km362.420-km397.700) on EPC mode under BMP in Punjab national highways authority of india•NHAI HQ•27-Nov-2020 | — | ₹1135.34 Cr | — | Accepted-Technical | View |
| — | 6-laning of Nashik Phata to Khed Pkg-II (from Design Ch.24.230 km at Indrayani river to Ch.42.000 km at village Chandoli-Khed) total length 17.770 km on Pune-Nashik section of NH-60 (Old NH-50) in the state of Maharashtra on EPC Mode national highways authority of india•NHAI HQ•02-Dec-2020 | — | ₹648.84 Cr | — | Accepted-Technical | View |
| — | 2-lane with Paved shoulder of Ujjain-Jhalawar (upto Rajasthan Border) from km 000.000 to km 132.955 (133.575 km) section of NH-552G in the state of Madhya Pradesh on EPC mode national highways authority of india•NHAI HQ•09-Dec-2020 | — | ₹454.63 Cr | — | Accepted-Technical | View |
| — | 4-laning of Balwara to Dhangaon section of NH-347BG-753L (Indore to Boregaon-Pkg III) Design Ch.42.260-Existing Ch.45.000 to Design Ch.82.810-Existing Ch.86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on EPC mode national highways authority of india•NHAI HQ•16-Dec-2020 | — | ₹770.48 Cr | — | Accepted-Technical | View |
| — | Construction of four lane ring road bypass around Srinagar city from km 0.000 to km 42.100 Phase I on Engineering, Procurement and Construction EPC Mode under NHDP Phase VII in the Union Territory of Jammu and Kashmir under BMP national highways authority of india•NHAI HQ•24-Dec-2020 | — | ₹1446.21 Cr | — | Accepted-Technical | View |
| — | Rehabilitation and Up-Gradation to 4 Lane Configuration and Strengthening of Punjab/HP Border to Sihuni Section from Km 11.00 to Km 51.00 (Design Length 37.030 Km)of NH-20of Pathankot Mandi Section under NH (O) in HPon HAM basis (Package-I) national highways authority of india•NHAI HQ•31-Dec-2020 | — | ₹1329.44 Cr | — | Accepted-Technical | View |
| — | 4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode national highways authority of india•NHAI HQ•01-Jan-2021 | — | ₹731.24 Cr | — | Accepted-Technical | View |
| — | Development of Memmadpur (Ambala) - Banur (IT City Chowk) -Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹789.29 Cr | — | Admitted-Finance | View |
| — | Widening and Rehabilitation of existing two lane to four lane road Champa-Korba-Katghora Section of NH 149B, from Design Chainage 0.000 to 38.200, (Pkg I) under NH(O) in the state of Chhattisgarh on Hybrid Annuity Mode. national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹646.99 Cr | — | Accepted-Technical | View |
| — | Rehabilitation and Upgrading of Existing 2lane to 4lane from Jwalamukhi Bypass to Kangra Bypass of NH 88 up to Intersection with NH154 (Design Chainage -Km 157.000 to Km 193.407) in the State of Himachal Pradesh under NH(O) on HAM Mode Package-V national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹1284.88 Cr | — | Accepted-Technical | View |
| — | Construction of 4 by 6 lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE 5 near to Manewal Ludhiana to junction with NH 205 near Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg-1 Section national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹1043.10 Cr | — | Admitted-Finance | View |
| — | Construction of 4 by 6 lane Greenfield Ludhiana Rupnagar NH205K from junction with NE-5 near to Manewal Ludhiana to junction with NH 205 near Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg-3 national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹1162.11 Cr | — | Admitted-Finance | View |
| — | Development of 6-lane Amritsar-Bathinda Greenfield section of NH 754A from Tiba on NE 5A to junction with Moga-Jalandhar road NH703 near Dharmkot from 0 to 39.000 as a part of Amritsar-Jamnagar Economic Corridor in Punjab on HAM under BMP Ph-I Pkg-1 national highways authority of india•NHAI HQ•18-Jan-2021 | — | ₹857.64 Cr | — | Admitted-Finance | View |
| — | Development of 6-lane AmritsarBathindaGreenfield sec of NH754A from Jn with MogaJalandhar Rd NH703 near Dharmkot to jn with BhagtaBhaiKa-Bhadaur Rd near DyalpuraBhaiKa as a part of Amritsar JamnagarEconomicCorridor in Punjab on HAM under BMP PhI Pg2 national highways authority of india•NHAI HQ•18-Jan-2021 | — | ₹1199.26 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Junction of EPE near Khekra Design Chainage 0 to Design Chainage 27.000 (Vill.-Lohadda) on EPC Mode (Package-1). national highways authority of india•NHAI HQ•18-Jan-2021 | — | ₹750.00 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV) national highways authority of india•NHAI HQ•19-Jan-2021 | — | ₹835.70 Cr | — | Admitted-Finance | View |
| — | Development of 6_lane Amritsar Bathinda Greenfield sec of NH754A to junction with Bhagta Bhai Ka Bhadaur Road near Mandi Dabwali Bathinda Road on NH54 near Sangat Kalan as a part of AmritsarJamnagar in Punjab on HAM under BP PhaseI (Pkg3) national highways authority of india•NHAI HO•19-Jan-2021 | — | ₹1330.40 Cr | — | Admitted-Finance | View |
| — | Construction of 4lane GA Amritsar connectivity for Connection of Amritsar with D-AM-K Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction with NH3 and Taran taran Bypass near Mannawalla village ch 70.950 on EPC mode under BMP in Punjab national highways authority of india•NHAI HQ•20-Jan-2021 | — | — | — | Accepted-Technical | View |
| — | Construction of 4lane GA Amritsar connectivity for Connection of Amritsar with D-AM-K Expressway from NH3 and Taran taran Bypass near Mannawalla village Cha70.950-NH354 Ajanala road near Harsh china village Cha99.020 on EPC mode under BMP in Punjab national highways authority of india•NHAI HQ•20-Jan-2021 | — | — | — | Accepted-Technical | View |
| — | Development of 6-lane access controlled LudhianaBathinda Greenfield highway sec of NH754AD from Jn. with MogaBarnala Rd NH703 to Jn. with DelhiKatra Exp way NE5 Ludhiana vill Ballowal as a part of LudhianaAjmer EC in Punjab on HAM under BMP Ph-1 Pkg2 national highways authority of india•NHAI HQ•20-Jan-2021 | — | ₹1015.05 Cr | — | Admitted-Finance | View |
| — | 2 /4 laning of Raebareli Jagdishpur Section of NH-330A from Km.0.000 to Km. 47.800 Design Length 46.020 km including Jagdishpur Bypass and Excluding 4.1 Km overlapping Length of Jagdishpur Bypass with NH 731(Old NH-56) in UP on EPC mode under NH(O) national highways authority of india•NHAI HQ•21-Jan-2021 | — | ₹518.37 Cr | — | Admitted-Finance | View |
| — | Rehabilitation and Upgradation to Four Lane configuration and Strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 Design Length 8.330 KM of NH20 New NH-154 of Pathankot-Mandi Section in Himachal Pradesh on HAM Package IB national highways authority of india•NHAI HQ•04-Feb-2021 | — | ₹517.97 Cr | — | Admitted-Finance | View |
| DQ | Four/Six lanning of Bhaniyawala- Jollygrant- Rishikesh spur section of NH-07 from Km. 0.000 to Km 19.780 in the state of Uttarakhand under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•13-Jun-2023 | ₹618.00 Cr | ₹565.59 Cr | +9.27% | Awarded: Sam India Builtwell Pvt Ltd | View |
| L1 | Construction of 4 lane Connector from Delhi Meerut Expressway (Km. 50.000 of Package IV) to Km. 8.520 of NH 235 in the State of Uttar Pradesh on EPC Mode (Length 14.600 Km). national highways authority of india•NHAI HQ•11-Mar-2021 | ₹387.98 Cr | — | — | Awarded (L1) | View |
| — | Construction of 4 Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44) from Ch.154.210 to Ch.158.650 (NB) and from Ch.155.940 to Ch.160.260 (SB) including construction of twin tube tunnel (PKG-I) in the UT of Jammu and Kashmir on EPC Mode national highways authority of india•NHAI HQ•22-Mar-2021 | — | ₹1245.96 Cr | — | Admitted-Finance | View |
| — | Construction of 4 Laning of part of Ramban to Banihal of NH-1A (NH44) Ch.158.650 to Ch.164.660 (NB) Ch.160.260 to Ch.163.406(SB connecting Existing Tunnel-T4) excluding Ch.161.350 to Ch.164.100 (NB) IC of twin tube tunnel (PKG-II) in UT of JK on EPC national highways authority of india•NHAI HQ•22-Mar-2021 | — | ₹1030.44 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II) national highways authority of india•NHAI HQ•01-Apr-2021 | — | ₹693.70 Cr | — | Admitted-Finance | View |
| — | Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III). national highways authority of india•NHAI HQ•01-Apr-2021 | — | ₹633.03 Cr | — | Admitted-Finance | View |
| DQ | Six Laning of Panipat-Jalandhar section of NH-1 from Km 96 to 387.100 in the State of Haryana and Punjab to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase-V - Balance BC overlay works between km. 96 to km 387.100 - 2nd call national highways authority of india•Ambala•17-Apr-2021 | ₹194.99 Cr | — | — | Awarded: Velji Ratna Sorathia Infra Pvt. Ltd | View |
| L1 | Improvement of Dharuhera Bhiwadi link road (NH-919, Old NH-71B) to 4 Lane with Service Road, starting from NH 48 (km 67.820) upto km 22.400 of NH-919 (4.3 km length) in Haryana national highways authority of india•NHAI HQ•01-Jul-2021 | ₹84.85 Cr | ₹117.07 Cr | -27.52% | Awarded (L1) | View |
| — | Upgradation and Four Laning of Haridwar Bypass Package-1 From Km. 0.000 (Km 188.100 of NH-58) to Km. 15.100 (Km 5.100 of NH 74) in the state of Uttarakhand on Hybrid Annuity mode national highways authority of india•NHAI HQ•23-Jul-2021 | — | ₹1095.25 Cr | — | Admitted-Finance | View |
| — | Rehabilitation and Upgradation to 4 Lane configuration and Strengthening of Sihuni to Mataur from Km 51.000 to Km 78.090 of NH-20 (New NH-154) (Design Length 24.200 KM) of Pathankot-Mandi Section under NH(O) in HP on HAM basis (PKG-IIA). national highways authority of india•NHAI HQ•30-Jul-2021 | — | ₹812.75 Cr | — | Admitted-Finance | View |
| — | Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode national highways authority of india•NHAI HQ•04-Aug-2021 | — | ₹621.45 Cr | — | Admitted-Finance | View |
| — | Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km. 515.000 to Km. 555.017 of NH-48 in the state of Karnataka on EPC mode under Bharatmala Pariyojana (Package-I) national highways authority of india•NHAI HQ•16-Aug-2021 | — | ₹1295.44 Cr | — | Admitted-Finance | View |
| — | Construction of 6 laning from Sankeshwar Bypass to MH-KNT Border from Km. 555.017 to Km. 592.853 of NH-48 in the state of Karnataka on Engineering Procurement and Construction (EPC) mode under Bharatmala Pariyojana (Package-II) national highways authority of india•NHAI HQ•16-Aug-2021 | — | ₹1223.20 Cr | — | Admitted-Finance | View |
| — | Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor in Uttar Pradesh and Uttarakhand on HAM under BMP (From Ch. 0 to Ch. 50.700) national highways authority of india•NHAI HQ•19-Aug-2021 | — | ₹1237.95 Cr | — | Admitted-Finance | View |
| — | Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 10.980 to Km 28.500 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-I) national highways authority of india•NHAI HQ•01-Sep-2021 | — | ₹1675.18 Cr | — | Admitted-Finance | View |
| — | Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28.500 to Km 73.744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-2) national highways authority of india•NHAI HQ•01-Sep-2021 | — | ₹1724.67 Cr | — | Admitted-Finance | View |
| — | Four Lanning of Karwar (Km. 281.980 of NH 62 Nagaur road) to Dangiyavas section Package-II (design length 30.093 km) of Jodhpur ring road in Rajasthan on EPC Mode under NHDP Phase-VII national highways authority of india•NHAI HQ•06-Sep-2021 | — | ₹514.27 Cr | — | Admitted-Finance | View |
| — | Construction of 4-lanes greenfield highway of (a) Malout bypass from chainage 35.5 to chainage 44.5 on nh-07 and chainage 0 on nh-07 to chainage 6.984 on nh-09 (b) Mandi Dabwali bypass from chainage 29.5 on nh-09 to chainage 38.450 on nh-54 ON EPC national highways authority of india•NHAI HQ•17-Sep-2021 | — | ₹446.86 Cr | — | Admitted-Finance | View |
| — | Improvement and Upgradation of Existing Road to 4lane with Paved Shoulder from Km 229.070 to 260.800 End of Hardoi District to Lucknow of NH731 Pkg4 on EPC basis in the state of Uttar Pradesh national highways authority of india•NHAI HQ•29-Sep-2021 | — | ₹475.38 Cr | — | Admitted-Finance | View |
| — | Improvement and Up-gradation of Existing Road to 4lane with Paved Shoulder from Km 174.641 to 229.070 End of Hardoi Bypass to End of Hardoi District of NH-731 (PkgIII) on HAM basis in Uttar Pradesh national highways authority of india•NHAI HQ•07-Oct-2021 | — | ₹954.36 Cr | — | Admitted-Finance | View |
| — | Four Laning of NH 530B from Mathura Bypass (Start) (Existing km. 266.000 of SH 33-Design Km 0.000) to Gaju Village (End) (Design Km.32.982) (Design Length-32.982 km) in the State of Uttar Pradesh on HAM Mode national highways authority of india•NHAI HQ•25-Oct-2021 | — | ₹1064.50 Cr | — | Admitted-Finance | View |
| — | Four Laning of NH 530B from Gaju Village (Design km 32.982 Mathura-Aligarh District Boundary) to Devinagar Bypass(Existing Km.208.000 of SH 33(NH-530B)-(Design Km.66.000)(Design length 33.018 km) in Uttar Pradesh on HAM mode (Package-1C) national highways authority of india•NHAI HQ•25-Oct-2021 | — | ₹901.46 Cr | — | Admitted-Finance | View |
| — | Improvement and Upgradation of Existing Road to 2by4 lane with Paved Shoulder from Km 40.000 to 88.750 start of Khutar bypass to start of Shahjahanpur bypass of NH731 PKG-1 in the state of Uttar Pradesh national highways authority of india•NHAI HQ•11-Nov-2021 | — | ₹548.27 Cr | — | Admitted-Finance | View |
| L1 | Four laning of Sonauli Gorakhpur section of NH-29E from Design Ch. 0.000 to Design Ch. 79.540 (from existing Ch. 0.000 to existing Ch. 80.295) on Hybrid Annuity Mode in the state of Uttar Pradesh national highways authority of india•NHAI HQ•11-Nov-2021 | ₹1918.93 Cr | ₹1731.09 Cr | +10.85% | Awarded (L1) | View |
| — | Four Laning of Mehgama Hansdiha section of NH 133 from existing Km 41.900 to existing Km 93.000 in the State of Jharkhand on Hybrid Annuity mode. national highways authority of india•NHAI HQ•22-Nov-2021 | — | ₹955.29 Cr | — | Admitted-Finance | View |
| — | Construction of Two-Lanes with-without paved shoulders from km 0.000 to km 69.480 (Design) of Sanquelim to Belagavi Section of NH-748AA in the State of Goa and Karnataka on EPC Mode under Bharatmala Pariyojana national highways authority of india•NHAI HQ•06-Dec-2021 | — | ₹229.19 Cr | — | Admitted-Finance | View |
| DQ | Upgradation and Four Laning of Poanta Saheb Ballupur Section of NH72 in the State of Uttarakhand under NH(O) on Hybrid Annuity Mode Package-2 Medinipur to Ballupur (Dehradun) from Design Ch 18.700 to Ch 44.800. national highways authority of india•NHAI HQ•10-Dec-2021 | ₹516.00 Cr | ₹496.48 Cr | +3.93% | Awarded: MKC Infrastructure Ltd | View |
| DQ | Construction of 4 laning of NH-5 (old NH-22) from Kaithlighat to Shakral Village (PKG I from Km 128.835 to Km 146.300 for Design Length 17.465km) in Himachal Pradesh on HAM national highways authority of india•NHAI HQ•10-Dec-2021 | ₹2,238 | ₹1491.35 Cr | -100% | Awarded: sp singla constructions pvt ltd | View |
| L2 | Rehabilitation and Up-gradation of existing road to 2-lane with Paved shoulders from End of Hamirpur Bypass to Bhangbar section of NH-88 (Design Chainage-Km.138.295 to Km.175.270 in the state of Himachal Pradesh under NH(O) on HAM (Package-IV) national highways authority of india•NHAI HQ•10-Dec-2021 | ₹425.00 Cr | ₹452.07 Cr | -5.99% | Awarded: RITHWIK PROJECTS PRIVATE LIMITED | View |
| — | Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH31 from design Chainage 221.047 to 225.302 in the State of Bihar on EPC Mode national highways authority of india•NHAI HQ•13-Dec-2021 | — | ₹371.45 Cr | — | Admitted-Finance | View |
| — | Construction of 6Lane Greenfield spur from Delhi Vadodara Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase-I on HAM in Rajasthan national highways authority of india•NHAI HQ•13-Dec-2021 | — | ₹1189.10 Cr | — | Admitted-Finance | View |
| — | UPGRADATION TO FOUR LANE WITH PAVED SHOULDER OF NH-341 FROM BHIMASAR JUNCTION OF NH-41 TO ANJAR- BHUJ UPTO AIRPORT JUNCTION KM 0.000 TO KM 65.478 IN GUJARAT ON HAM national highways authority of india•NHAI HQ•20-Dec-2021 | — | ₹1082.29 Cr | — | Admitted-Finance | View |
| — | Construction of Greenfield Connectivity to Jewar International Airport from DND-Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in Uttar Pradesh n Haryana national highways authority of india•NHAI HQ•06-Jan-2022 | — | ₹1533.34 Cr | — | Admitted-Finance | View |
| DQ | Six laning along with full access control provisions in stretches from Saharanpur bypass to Ganeshpur section of Delhi Dehradun EC in Uttar Pradesh and Uttarkhand on EPC under BMP Phase-1 (Package-2) national highways authority of india•NHAI HQ•06-Jan-2022 | ₹511.00 Cr | ₹495.85 Cr | +3.06% | Awarded: VARINDERA CONSTRUCTIONS LIMITED | View |
| — | Development of Ropeway Project from Sonprayag-Gaurikund-Kedarnath in the State of Uttarakhand on Hybrid Annuity Mode national highways authority of india•NHAI HQ•07-Jan-2022 | — | ₹985.00 Cr | — | Admitted-Finance | View |
| — | Widening to Six Lane of Existing Four lane Jetpur-Gondal-Rajkot Section from Km. 117.600 to Km. 185.00 on National Highway No.27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana national highways authority of india•NHAI HQ•10-Jan-2022 | — | ₹1580.49 Cr | — | Admitted-Finance | View |
| L1 | Construction of 4 laning of NH5 from Shakral Village to Dhalli Section (Shimla Bypass Pkg2 from Km 146.300 to Km 156.560 and Shimla connectivity from Km 0.000 to Km 0.725 for Design Length 10.985 km) in Himachal Pradesh on HAM national highways authority of india•NHAI HQ•11-Jan-2022 | ₹2070.00 Cr | ₹1742.25 Cr | +18.81% | Awarded (L1) | View |
| L1 | Rehabilitation and Upgradation to 2-Lane with Paved Shoulder configuration and Strengthening of Padhar to Bijni section from Km 180.000 to Km 202.815 of NH-154 (Design Length-19.050 KM) of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA) national highways authority of india•NHAI HQ•11-Jan-2022 | ₹545.00 Cr | ₹400.25 Cr | +36.16% | Awarded (L1) | View |
| L2 | Construction of New Four Lane of Sundarnagar Bypass from Exiting Km. 173.900 to Km. 179.600 of NH21 (Design Chainage Km. 0.000 to Km. 6.680) in the State of Himachal Pradesh on EPC Mode national highways authority of india•NHAI HQ•13-Jan-2022 | ₹109.44 Cr | ₹156.16 Cr | -29.92% | Awarded: S.S.Chauhans Construction private Limited | View |
| — | 4 Laning of Jagadhri Tajewala road section from Yamunanagar bypass Design Ch. 0.223 to Tajewala Design Ch. 32.300 of NH-907 under NH(O) (Design length 32.523 km)(Pkg1) in Haryana on EPC Mode national highways authority of india•NHAI HQ•21-Jan-2022 | — | ₹725.51 Cr | — | Admitted-Finance | View |
| — | Development of 4-6-lane Access Control Exp. from Design Chainage Km515.000-Km528.300 (Kunjwani to Sidhra Section of NH-44) and from Design Chainage Km550.900-Km566.520 (Domel to Katra Section) on HAM under BMP in the UT of JK.(Phase-II-PKG-XVII) national highways authority of india•NHAI HQ•25-Jan-2022 | — | ₹1556.96 Cr | — | Admitted-Finance | View |
| L2 | Rehabilitation and Upgradation to 4lane configuration and strengthening of Thanpuri to Paror sec from Km 85.135 to 100.840 of NH20 (New NH154) (Design Length 16.275) of Pathankot Mandi under NH(O) in Himachal Pradesh on EPC national highways authority of india•NHAI HQ•25-Jan-2022 | ₹290.00 Cr | ₹373.66 Cr | -22.39% | Awarded: UNIVERSAL CONTRACTORS AND ENGINEERS PRIVATE LIMITED | View |
| — | Routine Maintenance and Incident Management work of from Km. 0.000 (Km. 254.600 of NH74) to Km. 52.200 under NHDP4 on EPC Mode of 2 Lane with paved shoulders of section of NH125 (New NH09) excluding Khatima Bypass of length 8.255km. in Uttarakhand national highways authority of india•PIU Rudrapur•12-Mar-2022 | — | ₹28.55 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L2 | Construction of New 2-lane with Paved Shoulder of Hamirpur bypass of New NH-103 (Design chainage km 121.175 to km 138.295 Design length 17.120 km) in the state of Himachal Pradesh under NH(O) on HAM Mode national highways authority of india•NHAI HQ•13-Apr-2022 | ₹399.00 Cr | ₹457.37 Cr | -12.76% | Awarded: Jandu Construction India Pvt. Ltd. | View |
| — | Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode national highways authority of india•NHAI HQ•19-Apr-2022 | — | ₹1306.78 Cr | — | Admitted-Finance | View |
| DQ | Routine Maintenance and Incident Management work of from Km. 0.000 to Km. 52.200 on EPC Mode of Two Lane with paved shoulders of section of NH125 excluding Khatima Bypass of length 8.255km in the State of Uttarakhand national highways authority of india•Rudrapur•02-May-2022 | ₹25.83 Cr | ₹28.55 Cr | -9.5% | Rejected-Finance | View |
| — | Development Operation and Maintenance of Ropeway from Varanasi Cantt. to Godowlia Chowk in the state of Uttar Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•14-May-2022 | — | ₹461.00 Cr | — | Admitted-Finance | View |
| — | Routine Maintenance and Incident Management services work of Haridwar to Dehradun Section of NH-58 and NH-72 in the State Uttarakhand national highways authority of india•Dehradun•31-May-2022 | — | ₹12.03 Cr | — | Accepted-Technical | View |
| — | Improvement and Up-gradation of Existing Road to 4-lane with Paved Shoulder from Km 88.750 to 123.650 Start of Shahjahanpur bypass to Start of Shahabad Bypass of NH-731 on Hybrid Annuity Mode in the state of Uttar Pradesh national highways authority of india•NHAI HQ•29-Jun-2022 | — | ₹665.76 Cr | — | Admitted-Finance | View |
| — | Improvement and Up-Gradation of Existing Road to 4-Lane with paved shoulder from Km 123.650 to 175.080 Start of Shahabad Bypass To End Of Hardoi Bypass Of NH-731 on HAM basis in the State Of Uttar Pradesh national highways authority of india•NHAI HQ•29-Jun-2022 | — | ₹805.16 Cr | — | Admitted-Finance | View |
| L3 | Routine Maintenance and Incident Management of 4/6 laning of UP/HR Border-Yamunanagar- Saha-Barwala-Panchkula Section of NH-344 (Old NH-73) from km. 70.830 to km. 157.192 (Package-I and II) in the State of Haryana national highways authority of india•Chandigarh•29-Jun-2022 | ₹7.70 Cr | ₹10.00 Cr | -23% | Awarded: Shanti Road And Construction | View |
| — | 4-Laning of Bhiwani-Hansi road section of NH 148B (Design Length 42.934 km) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode national highways authority of india•NHAI HQ•15-Jul-2022 | — | ₹720.47 Cr | — | Admitted-Finance | View |
| — | 4 Laning of MP-UP Border to Kabarai section of NH34 n 35 from km 197.000 to km 242.991 (Length 45.991 Km) (Sagar Kabrai Pkg 5) under BMP (EC) in MP and UP on HAM. national highways authority of india•NHAI HQ•30-Jul-2022 | — | ₹1012.69 Cr | — | Admitted-Finance | View |
| — | Rehabilitation and Upgradation of Chorma Bairgania section of NH No. 227F to 2 lane with paved shoulders from Design Ch 0.000 to Ch 34.566 in the state of Bihar through Hybrid annuity mode (HAM) Basis national highways authority of india•NHAI HQ•30-Jul-2022 | — | ₹353.09 Cr | — | Admitted-Finance | View |
| — | Development Operation and Maintenance of Ropeway from Varanasi Cantt. to Godowlia Chowk in the State of Uttar Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•18-Aug-2022 | — | ₹473.90 Cr | — | Admitted-Finance | View |
| — | 4 Laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of Jharkhand on Hybrid Annuity mode national highways authority of india•NHAI HQ•02-Sep-2022 | — | ₹975.83 Cr | — | Admitted-Finance | View |
| — | Improvement works of Chittorgarh Bypass to Kota Section (from km 891.929 to km 1052.429) of NH27 in the State of Rajasthan on EPC Mode national highways authority of india•NHAI HQ•15-Sep-2022 | — | ₹92.60 Cr | — | Admitted-Finance | View |
| — | Four laning of Bhaniyawala-Jollygrant- rishikesh spur section of NH-07 from km. 0.00 to km 20.600 in the state of Uttarakhand under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•21-Sep-2022 | — | ₹766.73 Cr | — | Admitted-Finance | View |
| — | Rehabilitation and Upgradation to 4 Lane with paved shoulder configuration and Strengthening of Bijni to Mandi section from Km 202.815 to Km 208.000 of NH-20 (NH-154) (Design Length 5.357 KM) of Pathankot-Mandi under NH(O) in HP national highways authority of india•NHAI HQ•06-Oct-2022 | — | ₹919.05 Cr | — | Admitted-Finance | View |
| — | Four laning of NH530B from Devinagar Bypass (End) (Existing Km.208.000 of NH 530B Design Km.66.000) to Kasganj Bypass (End) (Existing Km.150.100 of NH530B Design Km.123.100) in Uttar Pradesh on Hybrid Annuity mode national highways authority of india•NHAI HQ•17-Nov-2022 | — | ₹1445.49 Cr | — | Admitted-Finance | View |
| — | Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JK (Phase II-PKG-XVIII) national highways authority of india•NHAI HQ•06-Dec-2022 | — | ₹777.56 Cr | — | Admitted-Finance | View |
| — | Construction of 4 lane Greenfield North East side Gorakhpur bypass (26.616 kms) starting from NH29E (Km 83.308) and end at NH28 (Km 285.100) under NHDP Phase-7 in Uttar Pradesh under Bharatmala pariyojana on EPC mode national highways authority of india•NHAI HQ•22-Dec-2022 | — | ₹819.71 Cr | — | Admitted-Finance | View |
| — | Construction of 4/6 Lane Northern Ayodhya Bypass tot length 35.40 kms Part1 north of NH27 from 0.000 to 30.400 (Starting near 112.540 ending at 139.928 of NH27) and Part2 south of NH27 from 0.000 to 5.000 on HAM under NHDP Ph7 in Uttar Pradesh national highways authority of india•NHAI HQ•23-Dec-2022 | — | ₹1724.43 Cr | — | Admitted-Finance | View |
| — | Construction of 4/6 lane Southern Ayodhya Bypass from km. 5.000 to km. 37.172 (starting near km. 112.540, ending at km. 153.281 of NH27) of total length of 32.172 km. on HAM basis under NHDP Ph-VII in the state of Uttar Pradesh national highways authority of india•NHAI HQ•23-Dec-2022 | — | ₹1845.88 Cr | — | Admitted-Finance | View |
| — | Four Laning of NH-39 (old NH-75) from design Km 97.600 (existing Km 96.470) (Udaipura village) to design km 147.540 (existing Km 148.020) (Bhogu Village) in the State of Jharkhand on Hybrid Annuity mode (Package-II) national highways authority of india•NHAI HQ•29-Dec-2022 | — | ₹1004.06 Cr | — | Admitted-Finance | View |
| — | Construction of 4lane access controlled Greenfield Atal Progressway(Chambal Expressway)from km 94.100(village sada ka pada in Sheopur Dist.) to km 155.00(village Chhavar in Sheopur District) under BMP in MP Pkg III on HAM national highways authority of india•NHAI HQ•30-Dec-2022 | — | ₹1359.43 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Const. of 4lane access controlled Greenfield Atal Progressway (Chambal Expressway)from km 155.400(vill Chhavar in Sheopur District)to km 206.000(village Jhundpura in Morena Dist.) under BMP in Madhya Pradesh PkgIV on HAM national highways authority of india•NHAI HQ•30-Dec-2022 | — | ₹1287.88 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | 4 laning of NH 530B from Kasganj Bypass End (Existing Km. 150.100 of NH 530B/ Design Km. 123.100) to Chandan Nagar (Existing Km 96.200 of NH 530B/Design Km. 179.500) section of NH 530B in Uttar Pradesh on HAM mode PKG 3 national highways authority of india•NHAI HQ•03-Feb-2023 | — | ₹1215.02 Cr | — | Admitted-Finance | View |
| — | Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode. national highways authority of india•NHAI HQ•13-Mar-2023 | — | ₹551.88 Cr | — | Admitted-Finance | View |
| — | Const of 4L EC and atgrade improve from 0.0 to 19.87 of Danapur Bihta with connectivity to existing RoB 1.35 Km ramps and atgrade improvements to 4L and Upgrade of existing 2L-4L from 19.87-23.5 of Bihta Koilwar in Bihar on EPC (2nd Call) national highways authority of india•NHAI HQ•01-May-2023 | — | ₹3146.58 Cr | — | Admitted-Finance | View |
| — | Strengthening/Overlaying on Six lane Gurgaon Kotputli Jaipur section of NH 48 (Old NH 8) from Km 107.100 to Km 188.000 in the State of Rajasthan at the Risk and Cost of Concessionaire national highways authority of india•NHAI HQ•24-May-2023 | — | ₹405.64 Cr | — | Admitted-Finance | View |
| — | Strengthening/Overlaying on Six lane Gurgaon Kotputli Jaipur section of NH 48 (Old NH8) from Km 188.000 to Km 268.300 in the State of Rajasthan at the Risk and Cost of Concessionaire national highways authority of india•NHAI HQ•24-May-2023 | — | ₹407.83 Cr | — | Admitted-Finance | View |
| — | Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 0.000 to 60.000 in the state of Odisha national highways authority of india•Keonjher•08-Jun-2023 | — | ₹229.50 Cr | — | Admitted-Finance | View |
| — | Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 60.000 to 113.300 PKG II in the state of Odisha national highways authority of india•Keonjher•08-Jun-2023 | — | ₹152.70 Cr | — | Admitted-Finance | View |
| — | Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 113.300 to 166.173 PKG III in the state of Odisha national highways authority of india•Keonjher•08-Jun-2023 | — | ₹222.39 Cr | — | Admitted-Finance | View |
| — | Construction of 4/6 lane Greenfield connectivity from Talwara Jattan Village on NH-44 to Gobindsar village on Delhi - Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in the State of Punjab on EPC Mode under BMP (2 call) national highways authority of india•NHAI HQ•09-Jun-2023 | — | ₹344.88 Cr | — | Admitted-Finance | View |
| — | Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode national highways authority of india•NHAI HQ•15-Jun-2023 | — | ₹438.62 Cr | — | Admitted-Finance | View |
| — | Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode national highways authority of india•NHAI HQ•04-Jul-2023 | — | ₹35.48 Cr | — | Admitted-Finance | View |
| L1 | Construction of 9 nos. FOBs between Kiratpur to Nerchork (including Sundernagar Bypass) section of NH 21 (Now NH 205, 03, 154) from km. 0.000 to km. 182.815 under EPC Mode in the state of Himachal Pradesh. national highways authority of india•NHAI PIU-Mandi•09-Aug-2023 | ₹6.84 Cr | ₹8.55 Cr | -19.99% | Awarded (L1) | View |
| — | Construction of balance works of two number of interchanges at Jaipur Ring Road (NH 148C) from Tonk road (NH 52) to Ajmer road section (NH 48) in the state of Rajasthan on Engineering Procurement and Construction (EPC) Mode national highways authority of india•NHAI HQ•25-Aug-2023 | — | ₹141.82 Cr | — | Admitted-Finance | View |
| L1 | BC overlay work on Barmer Sanchore Gujrat Border (upto Gandhav Bridge) section of NH 68 from Km. 153.034 to Km. 259.300 in the state of Rajasthan national highways authority of india•NHAI RO JAIPUR•08-Sep-2023 | ₹57.57 Cr | ₹72.88 Cr | -21% | Awarded (L1) | View |
| — | Rectification of MoRTH identified blackspots at 05 locations at Nindar Mod,Bhojlawa, Hadota, Udaipuria and Manda Mode on Jaipur Reengus Sikar section of NH 52 in the state of Rajasthan on EPC Mode national highways authority of india•NHAI RO Jaipur•08-Dec-2023 | — | ₹193.27 Cr | — | Accepted-Technical | View |
| — | Rehabilitation and upgradation of existing 2L flexible pavement to 2L flexible pavement with paved shoulder paver block flooring from Km0.00 near Nashri vill to Km39.100 near Chenani town of NH244 length39.100km in UT of Jammu and Kashmir under NH O national highways authority of india•NHAI HQ•22-Dec-2023 | — | ₹431.37 Cr | — | Admitted-Finance | View |
| — | 4laning of Aligarh Palwal Sec from Km.46.390 (DC) to Km. 69.110(Terminating at junc EPE)(PKG-II from Kurana Eastern Peripheral Expressway)of NH334D in Uttar Pradesh and Haryana on HAM national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹573.38 Cr | — | Admitted-Finance | View |
| — | Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km. 105.700 to Km. 106.800) on NH25 (New NH27) and Interchange at Km. 97.100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹144.02 Cr | — | Admitted-Finance | View |
| — | Development of 6lane of access-controlled Agra-Gwalior GF highway starting from km0.000-km88.400 Deori-Susera in the state of UP-Raj.-MP including the overlay strengthening and improvement works on from 1058.00-1148.00 of NH-44 on DBFOT BOT Mode NH(O national highways authority of india•NHAI HQ•05-Jan-2024 | — | ₹3841.18 Cr | — | Admitted-Finance | View |
| L1 | Additional works to ensure Road Safety for 6-Lane Bengaluru-Mysuru Access Controlled section of NH-275 in Karnataka on Hybrid Annuity Mode (HAM) under NH (O) national highways authority of india•NHAI HQ•06-Jan-2024 | ₹365.00 Cr | ₹688.11 Cr | -46.96% | Awarded (L1) | View |
| DQ | Development of 6 lane GF(PKG IIB)starts from Design Start from Ch.32.090 to Ch.51.200 around Kanpur city(Length19.110 kms)in the state of Uttar Pradesh on EPC mode national highways authority of india•NHAI HQ•20-Jan-2024 | ₹429.30 Cr | ₹544.04 Cr | -21.09% | Awarded: SRSC Infra Private Limited | View |
| — | Const of 4lane Pathalgaon KunkuriCG/JH border sec of NH43 starting from end point of NH130A design Ch.00.000 to Ch. 104.250 (from Turua Ama vill to Putrichoura vill)under Bmp (Lot5 Pkg7)in the state of Chhattisgarh on HAM national highways authority of india•NHAI HQ•05-Mar-2024 | — | ₹2382.07 Cr | — | Admitted-Finance | View |
| — | Construction of 4lane Greenfield Northern Patiala Bypass starting from Km. 274.115 of NH7 near village Wazidpur and terminating at Km. 300.465 of NH7 near village Chamarheri (Total length 27.350 Kms) in Punjab under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•07-Mar-2024 | — | ₹764.43 Cr | — | Admitted-Finance | View |
| L1 | Construction of External Road Connectivity to the proposed Multi Modal Logistics Park at Bengaluru national highways authority of india•NHLML HQ•12-Mar-2024 | ₹51.50 Cr | ₹68.72 Cr | -25.06% | Awarded (L1) | View |
| DQ | Operation and Maintenance of Shimla-Mataur Section of NH-205 from Ch. 0.000 to 65.000 and descoped section of Solan-Kaithilighat (NH-05) from km 127.450 to km 128.830 in the state of Himachal Pradesh. (2nd Call) national highways authority of india•RO NHAI Shimla•13-Mar-2024 | — | ₹19.97 Cr | — | Rejected-Technical | View |
| — | Improvement of Kundapur to Surathkal section and Nantoor to Talapady section of NH66 by Construction of 1 nos. of VUP with Retaining wall approaches, Service Road with drain cum footpath length13.13Km and 6 nos. of FOBs with Ramp on up and down side national highways authority of india•Kundapur suratkal•23-Jul-2024 | — | ₹137.83 Cr | — | Admitted-Finance | View |
| — | CONSTRUCTION OF 4LANING OF KISHANGANJ-BAHADURGANJ SECTION AS A SPUR CONNECTIVITY NH-27 AND NH-327E UTTAR RAMPUR (0.0) AND TERMINATING AT NH-327E NEAR VILLAGE SATAL ISTMARAR BAHADURGANJ (23.649) AND INTERCHANGE AT START POINT IN BIHAR ON HAM (2nd call national highways authority of india•NHAI HQ•23-Jul-2024 | — | ₹788.12 Cr | — | Admitted-Finance | View |
| — | Construction and upgradation of existing 2 lane to 4 lane dual carriageway NH Standard from Pandach to Manigam of NH-1 (from existing chainage Km17.974 to Km29.792) as a part of Srinagar Ring Road Phase-IIA on EPC Mode under BMP in the UT of JandK national highways authority of india•NHAI HQ•09-Oct-2024 | — | ₹435.89 Cr | — | Admitted-Finance | View |
| — | Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH44 to Gobindsar village on Delhi Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O) national highways authority of india•NHAI HQ•10-Oct-2024 | — | ₹394.34 Cr | — | Admitted-Finance | View |
| — | Rectification works at 05 MoRTH identified blackspot locations on Jaipur Tonk Deoli section of NH 52 in the state of Rajasthan on EPC Mode national highways authority of india•NHAI RO JAIPUR•16-Oct-2024 | — | ₹8.42 Cr | — | Accepted-Technical | View |
| — | Construction of 17 no of FOBs on Four Laning from Km 0.00 to Km 42.00 of Dobaspet to Dodaballapur Bypass section of NH648 Old NH207 and 4L of km 42.00 to Km 80.00 of Dodaballapura Bypass to Hoskote section of NH648 Old NH207 in the state of Karnataka national highways authority of india•Dobaspet-Dodaballapura bypass-hoskote section•11-Nov-2024 | — | ₹27.02 Cr | — | Admitted-Finance | View |
| — | Const. of 4Lane Elevated Road in Jodhpur city portion from Mahamandir Ch.0.000 to Akhaliya Chouraha Ch.7.633) in Rajasthan on HAM under NH(O) Scheme national highways authority of india•NHAI HQ•11-Nov-2024 | — | ₹938.59 Cr | — | Admitted-Finance | View |
| — | Construction of New 4 Lane with Paved Shoulder from Dareota Village to Kalar Bala Village of NH-205 (Design Chainage Km.33.175 to Km 41.000 Design Length 7.825 Km) including twin tube tunnel PackageIIB in Himachal Pradesh under NH (O) on HAM national highways authority of india•NHAI HQ•18-Nov-2024 | — | ₹622.00 Cr | — | Admitted-Finance | View |
| — | Construction of new Six lane Access Controlled Capital Region Ring Road from Rameshwar (NH 16) to Bilipada from Km 0.000 to Km 40.700 in the State of Odisha under NH(O) on Hybrid Annuity Mode (Package 1) national highways authority of india•NHAI HQ•22-Nov-2024 | — | ₹1715.31 Cr | — | Admitted-Finance | View |
| — | Construction of new Six lane Access Controlled Capital Region Ring Road from Rameswar (NH16) to Gobindpur Package II from Design Ch. Km. 40.700 to Km. 70.995 in the State of Odisha under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•28-Nov-2024 | — | ₹1402.64 Cr | — | Admitted-Finance | View |
| L1 | Rectification of Blackspots by Construction of Flyover VUP at Chidiya Bawdi, Tabiji, Kharwa, Piplaz Junction on Kishangarh Ajmer Beawar section of NH 448 and 58 and at Srinagar Village, Dilwari Village on Kishangarh Gulabpura Section of NH 48 national highways authority of india•NHAI RO JAIPUR•02-Dec-2024 | ₹147.58 Cr | ₹169.04 Cr | -12.69% | Awarded (L1) | View |
| L2 | Const. of 6 lane Zirakpur Bypass Starting from Junc. with NH7 Zirakpur Patiala DC 0.000 and ending at Junc. with NH5 Zirakpur Parwanoo DC 16.800 TL 19.200 Km in Punjab and Haryana under NH(O) on HAM national highways authority of india•NHAI HQ•27-Dec-2024 | ₹1408.00 Cr | ₹1329.65 Cr | +5.89% | Awarded: SPS Construction India Pvt Ltd | View |
| — | Construction of 04 no. of Additional Structures on six lane Gurgaon-Jaipur section of NH-48 between km 42.700 to km 107.100 in the State of Haryana on EPC Mode national highways authority of india•NHAI HQ•30-Dec-2024 | — | ₹108.96 Cr | — | Admitted-Finance | View |
| L2 | Widening n Strengthening of 2Lane with Paved Shoulder Myajlar Jaisalmer with Jaisalmer Bypass Link Road Sec of NH11 Part of BM7 and Sundra Myajlar Ambasingh ki Dhani Road part of Munabao Tanot project NH70 Portion of BM4 in Rajasthan under NH(O)HAM. national highways authority of india•NHAI HQ•28-Jan-2025 | ₹733.75 Cr | ₹842.80 Cr | -12.94% | Awarded: VRC Constructions (India) Limited | View |
| — | Const. of Service Road including Grade Sep. str. at specified junctions for improvement of corridor eff. of Domel Udhampur sec. of NH44 from Ch 220.500 to 182.200, length 14.370 Km on LHS and length 10.890 Km on RHS in the UT of JK on EPC Mode. national highways authority of india•Domel Udhampur•04-Feb-2025 | — | ₹275.00 Cr | — | Accepted-Technical | View |
| — | Long Term Rectification of 20 Nos. of MoRTH Identified Blackspots through widening of the carriageway and Junction improvement measures on NH766 section from Kerala Border to Kollegal in the State of Karnataka national highways authority of india•NHAI-RO-Bangalore•20-Feb-2025 | — | ₹90.13 Cr | — | Admitted-Finance | View |
| L1 | Design and Construction of Flyover at Sikroda Junction at Ch 41.500 on Gwalior Bypass section of NH 44 for permanent rectification of identified Blackspot location in the State of Madhya Pradesh on Engineering Procurement and Construction EPC Mode national highways authority of india•NHAI RO Bhopal•28-Feb-2025 | ₹32.99 Cr | ₹49.50 Cr | -33.35% | Awarded (L1) | View |
| L1 | Construction of secondary access road (0.75 Km) for emergencies and VIPs exit for Noida International Airport YEIDA of 30m wide peripheral road from point H-E-D1-C (8.00 Km) along Northern and Eastern side boundary wall of Airport on item rate basis national highways authority of india•NHAI HQ•27-Mar-2025 | ₹255.74 Cr | ₹240.45 Cr | +6.36% | Awarded (L1) | View |
| DQ | Develop. of 6lane GF PKG-IIA starts from Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode (2ND CALL) national highways authority of india•NHAI HQ•22-Apr-2025 | ₹549.82 Cr | ₹736.84 Cr | -25.38% | Awarded: Transrail Lighting Limited | View |
| L1 | Design and Construction of Flyover VUP LVUP at 04 locations for permanent rectification of MoRTH identified Blackspot locations i.e. CRPF camp Shivpuri Bypass End Point Mohrai Tiraha on NH46 Cut Point Shivpuri Link Road Karai Dada and Teela Road Coll national highways authority of india•RO Bhopal•25-Apr-2025 | ₹124.75 Cr | ₹154.33 Cr | -19.16% | Awarded (L1) | View |
| DQ | Operation and Maintenance of Four laning stretch of NH 709B from EPE Crossing Design Ch. 0.000 to the start of Shamli Bypass Design Ch. 61.409 on Performance Based Maintenance Contract mode in the state of Uttar Pradesh national highways authority of india•NHAI HQ•13-May-2025 | ₹112.03 Cr | ₹120.11 Cr | -6.73% | Awarded: S S BUILDERS | View |
| DQ | Strengthening Road Safety works Including improvement and Routine O and M of Delhi-Gurgaon section of NH-48 Other works along the project highway from Km. 14.300 to 42.000 (Rao Tula Ram Marg in Delhi to Kherki Dhaula FP in Haryana) in Delhi Haryana national highways authority of india•NHAI HQ•14-May-2025 | ₹189.97 Cr | ₹245.00 Cr | -22.46% | Awarded: R K JAIN INFRA PROJECTS PVT LTD | View |
| — | Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call national highways authority of india•NHAI HQ•15-May-2025 | — | ₹218.86 Cr | — | Admitted-Finance | View |
| L1 | Design and Construction of Flyover at Sijwaha Tiraha at Ch 1377.750 on Shivpuri Jhansi section of NH27 for permanent rectification of MoRTH identified Blackspot location in the State of Uttar Pradesh on EPC Mode national highways authority of india•RO Bhopal•06-Jun-2025 | ₹38.43 Cr | ₹49.79 Cr | -22.81% | Awarded (L1) | View |
| — | Construction of 2 lane with paved shoulder from Hiwarkhedi-Roshni NH-347B from km 0.000-km 90.010 and 2-4 Lane from km 114.000 near Ashapur Village to km 149.000 near Rudhy village of Betul-Khandwa corridor 125.010 km in MP on HAM under NHO national highways authority of india•NHAI HQ•22-Jul-2025 | — | ₹1237.07 Cr | — | Admitted-Finance | View |
| — | Up-gradation of existing 2 lane to 4 lane with paved shoulder from Deshgaon to Julwaniya section of NH-347B from design km 0.000 Existing km 99.924 on NH-347BG to design km 108.643 (Ex km 129.900 on NH-52) under NH(O) in Madhya Pradesh on HAM national highways authority of india•NHAI HQ•22-Jul-2025 | — | ₹1623.51 Cr | — | Admitted-Finance | View |
| — | Construction of Long Term Remedial measures of identified Landslide location i.e. Thalout Ch. 229.600 To Ch. 230.100 between PANDOH TO KULLU Section of NH 03 (Old NH 21) in the State of Himachal Pradesh under NH(O) on EPC mode national highways authority of india•NHAI HQ•28-Aug-2025 | — | ₹220.39 Cr | — | Admitted-Finance | View |
| DQ | Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode national highways authority of india•NHAI HQ•03-Sep-2025 | ₹2448.99 Cr | ₹2575.08 Cr | -4.9% | Awarded: PNC Infratech Ltd | View |
| — | Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode national highways authority of india•NHAI HQ•10-Oct-2025 | — | ₹401.26 Cr | — | Admitted-Finance | View |
| — | Widening and Improvement of exist carriageway to 4L of Kaliabor Numaligarh sec Ch.315.315 to km. 400.990 of NH37 New NH715 includ. Implementation of Wildlife-friendly Measures Proposed on KNP Stretch in Assam on EPC Mode national highways authority of india•NHAI HQ•16-Oct-2025 | — | ₹4829.14 Cr | — | Admitted-Finance | View |
| — | Design and Construction of 03 VUPs for permanent rect. of MoRTH identified Blackspot locations at Piparsama Chauraha 120.400 on Gwai Shiv Section of NH46 Sillarpur Tiraha 1339.900 and Mungawali Tiraha 1345.100 on Shiv Jhs Section of NH27 in the MP national highways authority of india•NHAI RO Bhopal•24-Oct-2025 | — | ₹105.43 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Cons. of Long Term Remedial measures of River cut/bank erosion at identified 12 locations (i.e. RC-18 A-RC-22 RC-20 A-RC-25 A-RC-26 A-RC-24 A-RC-19 A-RC-20 and A-RC-21 RC-21 RC-23 RC-25) KULLU TO MANALI on K-M Sec. of NH03 (OldNH21) in HP on EPC national highways authority of india•NHAI HQ•29-Oct-2025 | — | ₹313.89 Cr | — | Admitted-Finance | View |
| L2 | Const. of 6L AC Spur connectivity start. Ch. 15.100 of Ambala Chandigarh sec of NH205 A and terminating at Ch. 2.500 of Zirakpur Bypass TL 10.300 Km under NH(O) in Punjab on Hybrid Annuity Mode. national highways authority of india•NHAI HQ•11-Dec-2025 | ₹606.99 Cr | ₹595.68 Cr | +1.9% | Awarded: VRC Constructions (India) Limited | View |
| — | Strengthening-rehabilitation of rigid and flexible pavement with flexible overlay (50.93 km) and reconstruction (13.33 km) along with 04 years routine maintenance of Bhopal-Biaora section from Km.324 to Km.394.923 of NH-46 in MP on Item Rate Basis national highways authority of india•NHAI HQ•18-Dec-2025 | — | ₹215.04 Cr | — | Admitted-Finance | View |
| DQ | Construction of Long-Term Remedial measures of Landslide/River cut/bank erosion at identified locations between PANDOH TO KULLU on Kiratpur-Manali Section of NH-03 (Old NH-21) in Himachal Pradesh on EPC Mode national highways authority of india•NHAI HQ•22-Dec-2025 | ₹3.23 Cr | ₹388.87 Cr | -99.17% | Awarded: SRM CONTRACTORS LIMITED | View |
| — | Construction of 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km 112.535) including widening of the existing 4lane highway to 6lane from Km 112.880 to Km 115.680 of the Meerut-Haridwar NH-58 in the state of Uttar Pradesh on EPC national highways authority of india•NHAI HQ•24-Dec-2025 | — | ₹176.66 Cr | — | Admitted-Finance | View |
| — | Design and Construction of 03 VUP for permanent rectification of MoRTH identified Blackspot locations at Piparsama Chauraha 120.400 on GwlShiv Section of NH46 Sillarpur Tiraha 1339.900 and Mungawali Tiraha 1345.100 on ShivJhansi section of NH27 in MP national highways authority of india•NHAI PIU-Gwalior•27-Dec-2025 | — | ₹95.10 Cr | — | Admitted-Finance | View |
| — | Design and Construction of 03 VUP at Billowa Tiraha 1197.280 Kalyani Chauraha 1200.250 and Arru Tiraha 1216.000 for permanent rectification of MoRTH identified Blackspot locations along with Gabion wall in Jaurashi Ghati 1192.000 to 1192.700 LHS and national highways authority of india•NHAI PIU-Gwalior•27-Dec-2025 | — | ₹109.43 Cr | — | Admitted-Finance | View |
| DQ | R and S along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH-44 old NH1 from Km.96.000 near Panipat to Km.152.000 near Samana bahu in Haryana n Punjab on Item Rate Percentage basis national highways authority of india•NHAI HQ•01-Jan-2026 | ₹227.97 Cr | ₹275.49 Cr | -17.25% | Awarded: VRC Constructions (India) Limited | View |
| DQ | Rehab and strength. along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.212.000 near Ghaggar User FP to Km. 272.000 near Khanna in Punjab on Item Rate Percentage basis national highways authority of india•NHAI HQ•01-Jan-2026 | ₹238.51 Cr | ₹284.48 Cr | -16.16% | Awarded: SRSC Infra Private Limited | View |
| DQ | Construction of 4 Lanning of Badnawar-Petlawad Thandla-Timarwani section of (NH-752D) from Badnawar Bypass Ch.70.400 to Timarwani Interchange of Delhi Mumbai expressway (NE-4) Ch.150.850 in the state of Madhya Pradesh on HAM under NH(O) national highways authority of india•NHAI HQ•09-Jan-2026 | ₹1473.99 Cr | ₹1662.93 Cr | -11.36% | Awarded: VRC Constructions (India) Limited | View |
| — | Strengthening and Major Maintenance of 4L divided carriageway Road with paved shoulders config. from Sonpur Km184.700 to Nagaon Km278.685 of NH37 in Assam on PBMC Mode national highways authority of india•NHAI HQ•10-Feb-2026 | — | ₹187.30 Cr | — | Admitted-Finance | View |
| — | Construction of LongTerm Remedial measures of River cutbank erosion at 2 Nos locations viz. RC19 km 296560 to km296710 and ARC23 295600 to 296560 between KULLU TO MANALI on KiratpurManali Section of NH-03 in the State of Himachal Pradesh on EPC mode national highways authority of india•PIU Mandi•27-Mar-2026 | — | ₹78.14 Cr | — | Accepted-Technical | View |
| — | Cons. of 30 m wide Peripheral Road from Point C B to A1 Ch.8.00 Km to 10.5 Km. ESB wall of Airport in Jewar YEIDA and cons. of 30m wide PeripheralRoad from Pt. B to K Ch. 9.85 to 14.55 ESB wall of Airport in Jewar YEIDA on EPC Mode. national highways authority of india•NHAI HQ•16-Apr-2026 | — | ₹212.30 Cr | — | Admitted-Finance | View |
| L2 | Construction of Operation water storage pond (OSP) and other associated/ miscellaneous works for Gorakhpur Haryana Anu Vidyut Pariyojana-1 and2 (GHAVP-1and2) at Vill. Gorakhpur, Distt. Fatehabad, Haryana. nuclear power corporation of india limited•GHAVP Site•22-Aug-2024 | ₹295.41 Cr | ₹349.51 Cr | -15.48% | Awarded: GHV (India) PVT. Ltd. | View |
| DQ | Construction of road from km 19.554 to km 70.000 of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹479.82 Cr | ₹811.90 Cr | -40.9% | Awarded: C S CONSTRUCTION COMPANY PVT. LTD. | View |
| L1 | Construction of road from km 70.000 to km 113.000 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹479.82 Cr | ₹793.89 Cr | -39.56% | Awarded (L1) | View |
| L2 | Construction of road from km 113.00 to km 167.75 of Bomdila-Nafra- Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹519.82 Cr | ₹802.27 Cr | -35.21% | Awarded: C S CONSTRUCTION COMPANY PVT. LTD. | View |
| L3 | Construction of road from km 0.000 to km 55.725 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹652.82 Cr | ₹898.71 Cr | -27.36% | Admitted-Finance | View |
| L3 | Construction of road from km 113.25 to km 160.75 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹574.82 Cr | ₹790.92 Cr | -27.32% | Awarded: J INFRATECH LIMITED | View |
| L4 | Construction of road from km 160.75 to km 209.90 of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹594.82 Cr | ₹821.55 Cr | -27.6% | Admitted-Finance | View |
| L3 | Construction of road from km 0.000 to km 17.812 (Package-3) of Bile- Migging section (Km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹99.21 Cr | ₹162.31 Cr | -38.88% | Awarded: S and P Infrastructure Developers Private Limited | View |
| DQ | Construction of road from km 0.000 to km 35.580 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹98.82 Cr | ₹142.22 Cr | -30.52% | Awarded: M/s. GRRB ASSOCIATES | View |
| — | Construction of road from km 35.580 to km 81.400 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | — | ₹753.34 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 81.400 to km 130.125 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | — | ₹962.53 Cr | — | Admitted-Fee/PreQual/Technical | View |
| DQ | Construction of road from km 130.125 to km 156.095 of Kharsang-Miao- Vijaynagar of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•11-Jul-2025 | ₹294.82 Cr | ₹578.28 Cr | -49.02% | Awarded: Bhartia Infra Projects Ltd | View |
| L3 | Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 187/99 (Design Length 105.59 Km) of NH-39 (Old NH-75E) to four lane with paved shoulder in the State of Madhya Pradesh on Item Rate Mode. ministry of road transport and highways•Sidhi -Singrauli Road•09-Sep-2025 | ₹396.32 Cr | ₹396.31 Cr | 0% | Admitted-Finance | View |
| — | Rehabilitation and upgradation of Ghoti to Trimbak section of NH-160A (km 53.500 to km 101.100) to 4-LPS (47.600 km) in the State of Maharashtra on EPC Mode ministry of road transport and highways•Ghoti•29-Sep-2025 | — | ₹794.27 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Rehabilitation and upgradation of Trimbak - Mokhada - Jawhar - Manor - Palghar section of NH-160A to 2-lane/4-lane with paved shoulder (107.035 km) in the State of Maharashtra on EPC Mode. ministry of road transport and highways•Trimbak•29-Sep-2025 | — | ₹1187.21 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L1 | Construction of Nagaur bypass (Balance length) from km161.000 (Amarpura on NH58) to km173.100 (Gogelao on NH62) and widening to 4Lane with PS from Nagaur to Netra (from design km180.500 to design km269.314) in the State of Rajasthan on HAM Mode. ministry of road transport and highways•New Delhi•03-Dec-2025 | ₹885.00 Cr | ₹847.35 Cr | +4.44% | Awarded (L1) | View |
| L1 | SPECIAL REPAIR OF EMBAKMENTS AT VULNERABLE LOCATIONS ON NH 154A IN THE STATE OF HIMACHAL PRADESH ministry of road transport and highways•Chamba•04-Feb-2026 | ₹58.31 Cr | ₹74.28 Cr | -21.5% | Awarded (L1) | View |
| — | Construction of 4 laning of Rishikesh Bypass from Design Chainage km 529.750 Near Teenpani Flyover on NH7 to Design Chainage km 542.420 Near Kharasrote Bridge passing through Bhattowala and Dhalwala Village in the State of Uttarakhand Design Length ministry of road transport and highways•Rishikesh Bypass•18-Apr-2026 | — | ₹735.23 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L2 | Construction of Twin tube Uni directional Aizawal Bypass Tunnel of length 2.5 km and its approaches of 2.1 Km from Km 10.600 to Km 15.200 (Package 2) on Sairang Phaibawk section of NH 6 in state of Mizoram on EPC Mode ircon international limited•Aizawal, Mizoram•16-Oct-2025 | ₹352.10 Cr | ₹336.29 Cr | +4.7% | Admitted-Finance | View |
| L1 | Construction of Twin tube Uni directional Aizawal Bypass Tunnel of length 2.5 km and its approaches of 2.1 Km from Km 10.600 to Km 15.200 (Package 2) on Sairang Phaibawk section of NH 6 in state of Mizoram on EPC Mode ircon international limited•Aizawal, Mizoram•05-Mar-2026 | ₹365.04 Cr | ₹336.29 Cr | +8.55% | Awarded (L1) | View |
| DQ | Development of New Greenfield Airport at Dholera, Ahmedabad (Gujarat). Phase-1. RUNWAY, TAXIWAY, APRON, PTT ETC. airports authority of india•DHOLERA, AHMEDABAD•25-Feb-2021 | ₹905.00 Cr | ₹986.91 Cr | -8.3% | Awarded: VARAHA INFRA LIMITED | View |
| L1 | Development of additional RESA on either end on Runway 10-28 at Calicut Airport. SH Construction of embankment with slope protection, drainage system and associated works for additional RESA on either end on Runway 10-28-2nd Call airports authority of india•Calicut•03-Nov-2023 | ₹322.26 Cr | ₹402.92 Cr | -20.02% | Awarded (L1) | View |
| DQ | Development of New Greenfield Airport at Bundi, Kota Rajasthan. SH-Airside Works airports authority of india•Kota•06-Feb-2025 | ₹365.82 Cr | ₹467.67 Cr | -21.78% | Awarded: KCC Buildcon Private Limited | View |
| DQ | Development of Lal Bahadur Shastri International Airport Varanasi airports authority of india•Varanasi Airport•09-May-2025 | ₹348.15 Cr | ₹456.97 Cr | -23.81% | Awarded: PNC Infratech Ltd | View |
| L2 | Development of Ujjain Airport, Ujjain, Madhya Pradesh. SH Detailed Designing, Engineering, Procurement and Construction of Airport infrastructure of Operational area..... airports authority of india•UJJAIN•20-Jan-2026 | ₹109.00 Cr | ₹147.36 Cr | -26.03% | Admitted-Finance | View |
| L1 | Construction of Parallel Taxi Track (PTT) and Rapid Exit Taxi way (RET) at B M Airport, Ranchi. airports authority of india•Ranchi Airport•17-Jan-2026 | ₹82.60 Cr | ₹107.98 Cr | -23.51% | Awarded (L1) | View |