| Project No. | 258 |
| Wing | South Wing |
| Division | Road Division Patna City. |
| Circle | Central Road Circle Patna. |
| Road Type | SH |
| Head | State Plan |
| Agreement Value | ₹181.27 Cr |
| Sanctioned Length | 16.30 km |
| Contractor | M/S VAG Buildtech Limited and M/S Sai Engicon & Construction Pvt Ltd (JV). |
| AA Date | 02-11-2018 |
| Start Date | 21-08-2019 |
| Expected Completion | 20-08-2021 |
Road and Bridge Work with approaches completed. CD Work-26 Nos are completed out of 26 No. (Box culvert at ch.5+900(2/33/0) Super structure completed.) After COS2 02Nos. Minor Bridge at ch.13+500 (2x16.9m), ch.(14+500) size(1x14m) & Minor Bridge at ch. 1+370 (3x16.9) are completed,14+700(2x12) L/S Structure completed.R/S Slab work Completed. ( At ch. 2+900(3/2/2)Box culvert in place of3x10m) completed, ch.13+200(3/33/0) Box culvert in place of 2x16.9m work is completed .) 01 Nos. Major Bridge at ch. 11+400 (5x25.66)is completed at punpun river.(Sub-Structure completed, North Side Approach work is completed & South Side Approach work completed ) Drain-4.00 Km
Superintending Engineer quality visit record
Central Road Circle Patna. · Road Division Patna City.
Visited: 8 Jun 2025"पथ के 5+900 कि0मी0 में 2/33/0 Box Culvert एवं 14+700 कि०मी० में Minor Bridge (2x12m) के Deck Slab Casting का कार्य प्रगति पर है तथा कि०मी० 12वें में पुनपुन नदी पर उच्चस्तरीय पुल का कार्य पूर्ण हो चुका है एवं Approach पथ का कार्य प्रगति पर है। स्थल पर उपस्थित कार्यपालक अभियंता को निदेशित किया गया कि Minor Bridge एवं Box Culvert का बचे हुए कार्य को पूर्ण कराते हुए Approach कार्य को वर्षा ऋतु से पहले कराया जाय।"