Widening and Strengthening of Kusheshwar Ashthan (SH-56) to Pholtora Ghat Road in Km 0.00 to 20.80
Project Details
6 FieldsCost & Timeline
6 FieldsWidening and Strengthening of Kusheshwar Ashthan (SH-56) to Pholtora Ghat Road in Km 0.00 to 20.80 is a Bihar Road Construction Department (RCD) project under Road Division Benipur., classified as a MDR. The agreement amount for this project is ₹221.80 Cr, and the current status is Completed.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Time of Completion is 30.06.2023 as per approved COS. Work completed HL Bridge completed.
SE Inspection Log
Superintending Engineer quality visit record
Road Circle Darbhanga. · Road Division Benipur.
Visited: 1 Aug 2024"कुशेश्वरस्थान (SH-56) - फूलतोड़ा घाट पथ (EPC Mode) :- SH-56 (दरभंगा-कुशेश्वरस्थान) का अंतिम बिन्दु कुशेश्वरस्थान में है। इस अंतिम बिन्दु से कुशेश्वरस्थान-फूलतोड़ा पथ प्रारंभ होता है।इस पथ की कुल लम्बाई (कि.मी. 0.00 से 20.800 तक) 20.800 कि०मी० है । यह पथ दरभंगा जिले के कुशेश्वरस्थान (SH-56) को खगड़िया जिला के फूलतोड़ा घाट से जोड़ती है। इस पथ के चौड़ीकरण एवं मजबूतीकरण कार्य के संवेदक Bhartia-SRE (JV), C/o Bhartia infra Projects Limited है। इस कार्य के प्रारम्भ की तिथि - 22.10.2019 एवं कार्य समाप्ति की वास्तविक तिथि - 30.06.2023 है। यह पथ Double Lane की है। अधोहस्ताक्षरी द्वारा पूरे पथ का निरीक्षण किया गया। पथ के निरीक्षण के दौरान कुछ जगहों पर Rain Cuts पाए गए। कार्यपालक अभियंता द्वारा बताया गया कि पथ में कुल 10 Box Culverts (1/45/0) एवं 31 HL Bridge का निर्माण कार्य हुआ है। पथ के कि.मी. 12वें में निर्मित HL Bridge के Cantilevers return wall के नजदीक धँसान की प्रवृत्ति देखी गई। पथ के निरीक्षण के क्रम में अधोहस्ताक्षरी द्वारा निम्नलिखित निदेश दिये गये- (i) इस नवनिर्मित पथ का Embankment High होने के कारण Rainy Season में Alert रहकर Rain cuts की मरम्मति कार्य ससमय कराया जाय। साथ ही अन्य आवश्यक कार्य EPC Contract के Maintenance Clause के अनुरूप सतत् कराया जाय।"
Frequently Asked Questions
- QWhat is the current status of the Bihar RCD project "Widening and Strengthening of Kusheshwar Ashthan (SH-56) to Pholtora Ghat Road i"?
- Status: Completed. This MDR project under Road Division Benipur. (Road Circle Darbhanga.) covers 20.80 km of road work. Expected completion: 30-06-2023.
- QWho is the contractor for RCD project 23?
- The contractor for this project is Bhartiya Infra project Ltd.. Project number: 23. Division: Road Division Benipur.. Administrative approval date: 11-09-2018.
- QWhat is the agreement value for this Bihar road project?
- The agreement value for "Widening and Strengthening of Kusheshwar Ashthan (SH-56) to " is ₹221.80 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Benipur..
- QWhat does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 23 "Widening and Strengthening of Kusheshwar Ashthan (SH-56) to " is one of thousands of road improvement and construction works tracked by BiharInfraTales.