SHRCD BiharOngoning

Widening and Strengthening work of Kudra-Chenari-Malhipur Road from km. 0.00 to 22.50 km. in Rohtas District for the year 2024-25

#1099
Road Division Kochas
Bhojpur Road Circle Arrah.
Bihar RCD PMIS — Road Project◐ Ongoning
Agreement₹97.87 Cr
Length22.50 km
Start24-09-2025
Completion23-09-2027
SH · South Wing
Road Division Kochas
R.B.A Construction Pvt. Ltd.

Project Details

6 Fields
Project No.
1099
Wing
South Wing
Division
Road Division Kochas
Circle
Bhojpur Road Circle Arrah.
Road Type
SH
Head
State Plan

Cost & Timeline

6 Fields
Agreement Value
₹97.87 Cr
Sanctioned Length
22.50 km
Contractor
R.B.A Construction Pvt. Ltd.
AA Date
28-02-2025
Start Date
24-09-2025
Expected Completion
23-09-2027

Widening and Strengthening work of Kudra-Chenari-Malhipur Road from km. 0.00 to 22.50 km. in Rohtas District for the year 2024-25 is a Bihar Road Construction Department (RCD) project under Road Division Kochas, classified as a SH. The agreement amount for this project is ₹97.87 Cr, and the current status is Ongoning.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

Remarks

Main Issue:- Forest clearance & Electric utility shifting required. It is required to hand over 8.45 hect. & 20.80 hect. non forest land to DFO, Kaimur & DFO, Rohtas. For which the proposal has been sent to District Magistrate, Rohtas, Sasaram for providing 20.80 hectare Non forest land to forest department vide Engineer in chief, RCD, Bihar Letter No.-8481(E) dated-19.12.2025 and also proposal has been sent to District magistrate, Kaimur, Bhabua for providing 8.45 hectare Non forest land to Forest Department vide Engineer in Chief, RCD, Bihar Letter N0.-8400(E) dated-16.12.2025. Current Status:- Joint Inspection with contractor has been done. After obtaining forest clearance, the process for issuing of Date of Appointment shall be carried out.

?

Frequently Asked Questions

QWhat is the current status of the Bihar RCD project "Widening and Strengthening work of Kudra-Chenari-Malhipur Road from km. 0.00 to "?
Status: Ongoning. This SH project under Road Division Kochas (Bhojpur Road Circle Arrah.) covers 22.50 km of road work. Expected completion: 23-09-2027.
QWho is the contractor for RCD project 1099?
The contractor for this project is R.B.A Construction Pvt. Ltd.. Project number: 1099. Division: Road Division Kochas. Administrative approval date: 28-02-2025.
QWhat is the agreement value for this Bihar road project?
The agreement value for "Widening and Strengthening work of Kudra-Chenari-Malhipur Ro" is ₹97.87 Cr. This is a SH project under Bihar Roads Construction Department (RCD) in Road Division Kochas.
QWhat does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 1099 "Widening and Strengthening work of Kudra-Chenari-Malhipur Ro" is one of thousands of road improvement and construction works tracked by BiharInfraTales.